{"schema_version":2,"canonical_url":"https://asc.understandingaccounting.org/asc/275/","source":"FASB Accounting Standards Codification, Basic View","usage":"Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.","number":"275","title":"Risks and Uncertainties","area":"Presentation","group":null,"subtopics":[{"number":"275-10","topic":"275","title":"Overall","area":"Presentation","paragraphs":74,"summary":"ASC 275-10 requires all entities to disclose, in the basic financial statements, information about risks and uncertainties existing at the balance sheet date in four areas: nature of operations (or, if principal operations have not commenced, current activities), the pervasive use of management estimates, certain significant estimates, and current vulnerability due to certain concentrations (275-10-50-1). The hallmark of the Subtopic is selectivity — disclosure is triggered only when specified screening criteria are met, generally when it is at least reasonably possible that a change or severe impact will occur in the near term and the effect would be material or severe (275-10-50-8; 275-10-50-16). It excludes risks from management/key personnel, proposed regulatory or accounting changes, internal control deficiencies, and acts of God, war, or sudden catastrophes (275-10-15-4).","concepts":["risks and uncertainties disclosure","nature of operations","use of estimates","significant estimates","near-term severe impact","concentrations","reasonably possible","group concentrations"],"categories":["Disclosure","Financial statement presentation","Contingencies and guarantees","Presentation"],"level":"intermediate","topic_title":"Risks and Uncertainties","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"275-10-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" id=\"SL29645996-158989\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#condensed-statements\" class=\"term\" title=\"(P) December 16, 2027; (N) December 16, 2028 270-10-65-1 Financial statements that are presented at a level that is more aggregated than the annual financial statements or have limited notes subject to the disclosure requirements in Topic 270 or both. (U.S. Securities and Exchange Commission [SEC] registrants are required to consider the guidance in paragraph 270-10-S45-2. See Regulation S-X Rule 10-01 [17 CFR 210.10-01] and Regulation S-X Rule 8-03 [17 CFR 210.8-03].)\"><span>Condensed Statements</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2025-11/\" class=\"xref\">Accounting Standards Update No. 2025-11</a></td><td class=\"entry\">12/08/2025</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>Contract</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#customer\" class=\"term\" title=\"A party that has contracted with an entity to obtain goods or services that are an output of the entity's ordinary activities in exchange for consideration.\"><span>Customer</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/f/#fair-value\" class=\"term\" title=\"The price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date.\"><span>Fair Value</span></a> (3rd def.)</td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2012-04/\" class=\"xref\">Accounting Standards Update No. 2012-04</a></td><td class=\"entry\">10/01/2012</td></tr><tr><td class=\"entry\"><a href=\"/glossary/n/#net-realizable-value\" class=\"term\" title=\"Estimated selling prices in the ordinary course of business, less reasonably predictable costs of completion, disposal, and transportation.\"><span>Net Realizable Value</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2015-11/\" class=\"xref\">Accounting Standards Update No. 2015-11</a></td><td class=\"entry\">07/22/2015</td></tr><tr><td class=\"entry\"><a href=\"/glossary/p/#performance-obligation\" class=\"term\" title=\"A promise in a contract with a customer to transfer to the customer either: A good or service (or a bundle of goods or services) that is distinct A series of distinct goods or services that are substantially the same and that have the same pattern of transfer to the customer.\"><span>Performance Obligation</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/r/#reasonably-possible\" class=\"term\" title=\"The chance of the future event or events occurring is more than remote but less than likely.\"><span>Reasonably Possible</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/r/#revenue\" class=\"term\" title=\"Inflows or other enhancements of assets of an entity or settlements of its liabilities (or a combination of both) from delivering or producing goods, rendering services, or other activities that constitute the entity's ongoing major or central operations.\"><span>Revenue</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/t/#transaction-price\" class=\"term\" title=\"The amount of consideration to which an entity expects to be entitled in exchange for transferring promised goods or services to a customer, excluding amounts collected on behalf of third parties.\"><span>Transaction Price</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-05-2\" class=\"xref\">275-10-05-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-10/\" class=\"xref\">Accounting Standards Update No. 2014-10</a></td><td class=\"entry\">06/10/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-05-6\" class=\"xref\">275-10-05-6</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2012-04/\" class=\"xref\">Accounting Standards Update No. 2012-04</a></td><td class=\"entry\">10/01/2012</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-05-7\" class=\"xref\">275-10-05-7</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2015-11/\" class=\"xref\">Accounting Standards Update No. 2015-11</a></td><td class=\"entry\">07/22/2015</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-05-7\" class=\"xref\">275-10-05-7</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-15-3\" class=\"xref\">275-10-15-3</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2025-11/\" class=\"xref\">Accounting Standards Update No. 2025-11</a></td><td class=\"entry\">12/08/2025</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-15-6\" class=\"xref\">275-10-15-6</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/asc-pdf/GUID-2C1F3EDB-71D2-450B-AFAB-85E2A86D8723.pdf\" class=\"pdf-link\" target=\"_blank\" rel=\"noopener\">Maintenance Update 2016-05 (PDF)</a></td><td class=\"entry\">04/12/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-50-1\" class=\"xref\">275-10-50-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-10/\" class=\"xref\">Accounting Standards Update No. 2014-10</a></td><td class=\"entry\">06/10/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-50-2\" class=\"xref\">275-10-50-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-10/\" class=\"xref\">Accounting Standards Update No. 2014-10</a></td><td class=\"entry\">06/10/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-50-2A\" class=\"xref\">275-10-50-2A</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-10/\" class=\"xref\">Accounting Standards Update No. 2014-10</a></td><td class=\"entry\">06/10/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-50-6\" class=\"xref\">275-10-50-6</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-50-8\" class=\"xref\">275-10-50-8</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-55-2\" class=\"xref\">275-10-55-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-10/\" class=\"xref\">Accounting Standards Update No. 2014-10</a></td><td class=\"entry\">06/10/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-55-3A\" class=\"xref\">275-10-55-3A</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-10/\" class=\"xref\">Accounting Standards Update No. 2014-10</a></td><td class=\"entry\">06/10/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-55-3B\" class=\"xref\">275-10-55-3B</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-10/\" class=\"xref\">Accounting Standards Update No. 2014-10</a></td><td class=\"entry\">06/10/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-55-9\" class=\"xref\">275-10-55-9</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-60-1\" class=\"xref\">275-10-60-1</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/asc-pdf/GUID-6A8ECCE2-2DD0-4750-978D-D37E5AA3DC28.pdf\" class=\"pdf-link\" target=\"_blank\" rel=\"noopener\">Maintenance Update 2018-02 (PDF)</a></td><td class=\"entry\">02/02/2018</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-60-2\" class=\"xref\">275-10-60-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2025-11/\" class=\"xref\">Accounting Standards Update No. 2025-11</a></td><td class=\"entry\">12/08/2025</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-60-3A\" class=\"xref\">275-10-60-3A</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2012-04/\" class=\"xref\">Accounting Standards Update No. 2012-04</a></td><td class=\"entry\">10/01/2012</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-60-7\" class=\"xref\">275-10-60-7</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/275/10/#275-10-60-9\" class=\"xref\">275-10-60-9</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2012-04/\" class=\"xref\">Accounting Standards Update No. 2012-04</a></td><td class=\"entry\">10/01/2012</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\nCondensed Statements | Added | Accounting Standards Update No. 2025-11 | 12/08/2025 |\nCo…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a8b176a5b0a0d026a36f52d6e6b675b2fdc05af1c4f3c3a5dc15a8d86e294d61","downloaded_from":"2026-09-09T23:21:55.847Z","last_downloaded_at":"2026-09-09T23:21:55.847Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482789","source_sha256":"a8a91cae3a121ca56764804d0045d023dbe67694630b35a746dc1a78c04465f1"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f38a0380ed029153e49234d29e59d73e529e93a17384fd8d8824c969b90dedca","downloaded_from":"2026-09-09T23:21:55.847Z","last_downloaded_at":"2026-09-09T23:21:55.847Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482789","source_sha256":"a8a91cae3a121ca56764804d0045d023dbe67694630b35a746dc1a78c04465f1"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:98eac33ae344bfcf8a40cbdd23bf53507d5efd58e48a03810546229dce53f770","downloaded_from":"2026-09-09T23:21:55.847Z","last_downloaded_at":"2026-09-09T23:21:55.847Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482789","source_sha256":"a8a91cae3a121ca56764804d0045d023dbe67694630b35a746dc1a78c04465f1"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"275-10-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8317AA20-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Financial statements provide information about certain current conditions and trends that help users in predicting reporting entities' future cash flows and results of operations. The quality of users' predictions depends to a significant degree on their assessment of the risks and uncertainties inherent in entities' operations and of the information about those operations that financial reporting provides. </span></span> </div> </div>","snippet":"Financial statements provide information about certain current conditions and trends that help users in predicting reporting entities' future cash flows and results of operations. The quality of users' predictions depend…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9de29fa776874a3419669f5eff541b3e775b72f69ed22ad2e82644223a08d83c","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}},{"citation":"275-10-05-2","para":"05-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8317ABA3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The central feature of this Subtopic's disclosure requirements is selectivity: specified criteria serve to screen the host of risks and uncertainties that affect every entity so that required disclosures are limited to matters significant to a particular entity. </span></span> <span class=\"sfragment\" id=\"sfr_8317ACF9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The disclosures focus primarily on risks and uncertainties that could significantly affect the amounts reported in the financial statements in the <a href=\"/glossary/n/#near-term\" class=\"term\" title=\"A period of time not to exceed one year from the date of the financial statements.\"><span>near term</span></a> or the near-term functioning of the reporting entity. The risks and uncertainties this Subtopic addresses can stem from any of the following: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8317AE35-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The nature of the entity's operations, </span></span> <span class=\"sfragment\" id=\"sfr_8317AF69-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">including the activities in which the entity is currently engaged if principal operations have not commenced</span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8317B0AB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The use of estimates in the preparation of the entity's financial statements </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8317B1F7-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Significant concentrations in certain aspects of the entity's operations. </span></span> </div> </li> </ol> </div> </div>","snippet":"The central feature of this Subtopic's disclosure requirements is selectivity: specified criteria serve to screen the host of risks and uncertainties that affect every entity so that required disclosures are limited to m…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:39114595033e7cb81e272abbc4545a045c50365fba2b15454042114dee6d8145","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}},{"citation":"275-10-05-3","para":"05-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8317B308-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Subtopic does not prohibit disclosure of matters it does not require to be disclosed either because they do not meet the specified screening criteria or because they relate to risks and uncertainties that are outside the scope of this Subtopic. </span></span> </div> </div>","snippet":"This Subtopic does not prohibit disclosure of matters it does not require to be disclosed either because they do not meet the specified screening criteria or because they relate to risks and uncertainties that are outsid…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c811b5fb2f12a0e1379c1644019cf921ff9941e033c0a6b1da2c87156eec6191","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5b5bbece20159d368f0af087d9e628531dedf29ed41b8d9bc63774aad470f8ec","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}},{"block":null,"heading":"Nature of Operations","paragraphs":[{"citation":"275-10-05-4","para":"05-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8317B3ED-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure of the locations of a business entity's or not-for-profit entity's (NFP's) principal markets provides information useful in assessing risks and uncertainties related to the environments in which the entity operates. The risks and the uncertainties associated with selling products and services in various regions in the United States may differ significantly. And they do differ significantly from the risks and the uncertainties in selling products and services outside the United States. </span></span> <span class=\"sfragment\" id=\"sfr_8317B4C6-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Knowing those environments in which an entity sells its products or provides services helps users of financial statements to assess certain risks based on day-to-day national and world events. </span></span> </div> </div>","snippet":"Disclosure of the locations of a business entity's or not-for-profit entity's (NFP's) principal markets provides information useful in assessing risks and uncertainties related to the environments in which the entity ope…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d428de789b7e0e039832da68294feea7110b03cfe53cfc3dd1a8c8b727173deb","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}},{"citation":"275-10-05-5","para":"05-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8317B59B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Information about the nature of operations is helpful because the various kinds of businesses in which reporting entities operate have diverse degrees and kinds of risks. Certain of these risks are inherent to the business in which an entity is engaged. By knowing the nature of an entity's business and the principal markets for its products or services, a financial statement user is alerted, indirectly, about the risks common to that business. </span></span> </div> </div>","snippet":"Information about the nature of operations is helpful because the various kinds of businesses in which reporting entities operate have diverse degrees and kinds of risks. Certain of these risks are inherent to the busine…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ae042b769a1a5369838b2b537fd5feb6f422cefd58ca50d0822a939749bf4561","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3d17ee5b3489be038a44457ff7337cd30725c97bec6818a6a9e75d5db691dab1","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}},{"block":null,"heading":"Use of Estimates in the Preparation of Financial Statements","paragraphs":[{"citation":"275-10-05-6","para":"05-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8317B675-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">There is a need to communicate explicitly to users of financial reports that the inescapable use of estimates in the preparation of financial information, including the estimation of <a href=\"/glossary/f/#fair-value\" class=\"term\" title=\"The price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date.\"><span>fair values</span></a> for assets carried at such a basis, results in the reporting of values that are approximations rather than exact amounts. If users understand better the inherent limitations on precision in financial statements, they will be better able to make decisions. </span></span> </div> </div>","snippet":"There is a need to communicate explicitly to users of financial reports that the inescapable use of estimates in the preparation of financial information, including the estimation of fair values for assets carried at suc…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:27cd1a63d99e3af787e6ee6a3e73ca4837b0264b9841d90547ef0ae07de223f8","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}},{"citation":"275-10-05-7","para":"05-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8317B747-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Estimates inherent in the current financial reporting process inevitably involve assumptions about future events. </span></span> <span class=\"sfragment\" id=\"sfr_8317B817-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For example, estimating and constraining estimates of variable consideration to be included in the <a href=\"/glossary/t/#transaction-price\" class=\"term\" title=\"The amount of consideration to which an entity expects to be entitled in exchange for transferring promised goods or services to a customer, excluding amounts collected on behalf of third parties.\"><span>transaction price</span></a> for a <a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>contract</span></a> with a <a href=\"/glossary/c/#customer\" class=\"term\" title=\"A party that has contracted with an entity to obtain goods or services that are an output of the entity's ordinary activities in exchange for consideration.\"><span>customer</span></a> in accordance with paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/606/10/#606-10-32-5\" class=\"xref\">606-10-32-5 through 32-14</a></div> and measuring progress toward complete satisfaction of a <a href=\"/glossary/p/#performance-obligation\" class=\"term\" title=\"A promise in a contract with a customer to transfer to the customer either: A good or service (or a bundle of goods or services) that is distinct A series of distinct goods or services that are substantially the same and that have the same pattern of transfer to the customer.\"><span>performance obligation</span></a> in accordance with paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/606/10/#606-10-25-31\" class=\"xref\">606-10-25-31 through 25-37</a></div>. </span></span> <span class=\"sfragment\" id=\"sfr_8317B906-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For another example, carrying inventories measured using first-in, first-out (FIFO) at the lower of cost and <a href=\"/glossary/n/#net-realizable-value\" class=\"term\" title=\"Estimated selling prices in the ordinary course of business, less reasonably predictable costs of completion, disposal, and transportation.\"><span>net realizable value</span></a> is based on an assumption that there will be sufficient demand for that product in the future to be able to sell the quantity on hand without incurring losses on the sales or, if net realizable value is used, that it can be estimated. Making reliable estimates for those matters is often difficult even in periods of economic stability; it is more so in periods of economic volatility. Although many users of financial statements are aware of that aspect of financial reporting, others often assume an unwarranted degree of reliability in financial statements. The disclosure required by this Subtopic should help dispel any of those erroneous assumptions. </span></span> </div> </div>","snippet":"Estimates inherent in the current financial reporting process inevitably involve assumptions about future events. For example, estimating and constraining estimates of variable consideration to be included in the transac…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5e669d1ec2c6e2b8438fc62daa56305a8cb4e9dd402eb8e96b0b542ca72fbfd9","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b9e187983319d1474b87ace18e02ec921bb2bfb75cb4ca9ef8ad9e6dd9fc12b5","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}},{"block":null,"heading":"Current Vulnerability Due to Certain Concentrations","paragraphs":[{"citation":"275-10-05-8","para":"05-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8317B9E0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> This Subtopic provides guidance on disclosure of current vulnerability due to certain concentrations but stops short of requiring disclosure of all concentrations. </span></span> </div> </div>","snippet":"This Subtopic provides guidance on disclosure of current vulnerability due to certain concentrations but stops short of requiring disclosure of all concentrations.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:675a12bb7ae5dedecf3c7a5808baafd7e2ee07502520da028e7874148ef47c06","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:99adb691cc09c1472747a20ea59bcb1f25a1425faf5e682a3d520b754ae94ec8","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f2e4f28bd235f22a7cd1b48c191c6e19eddfc4db45abdfc6dffeb71e066d3096","downloaded_from":"2026-09-09T23:21:58.399Z","last_downloaded_at":"2026-09-09T23:21:58.399Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482764","source_sha256":"14f2c2311d4f0b677756f5850a5b537f720baf9b1540dfca8bf646878aadcb0e"}},{"number":"10","label":"10 Objectives","anchor":"10-objectives","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"275-10-10-1","para":"10-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_8322CF8D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosing information to help users assess major risks and uncertainties is consistent with the established objectives of financial reporting. </span></span></div></div>","snippet":"Disclosing information to help users assess major risks and uncertainties is consistent with the established objectives of financial reporting.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cd9ea3d5de8eb338b962fabdf5ffaf093cc834fc81722460936641d6f7229bfc","downloaded_from":"2026-09-09T23:22:01.770Z","last_downloaded_at":"2026-09-09T23:22:01.770Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482741","source_sha256":"3c51636bdab1ad38c767e48ed25b4f14b177a8a63f9562440e0d77f435a46d79"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6acc02ed730aa5bdb9de3f1e6b79408eedb79b6efeaf7e3da35533f1c15627a5","downloaded_from":"2026-09-09T23:22:01.770Z","last_downloaded_at":"2026-09-09T23:22:01.770Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482741","source_sha256":"3c51636bdab1ad38c767e48ed25b4f14b177a8a63f9562440e0d77f435a46d79"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1998405dc186ad7e1c0fd61e21e0e613bd709d20367008ff865df20053f53a0a","downloaded_from":"2026-09-09T23:22:01.770Z","last_downloaded_at":"2026-09-09T23:22:01.770Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482741","source_sha256":"3c51636bdab1ad38c767e48ed25b4f14b177a8a63f9562440e0d77f435a46d79"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"275-10-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The Scope Section of the Overall Subtopic establishes the pervasive scope for the Risks and Uncertainties Topic.</div></div>","snippet":"The Scope Section of the Overall Subtopic establishes the pervasive scope for the Risks and Uncertainties Topic.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:33927bc7223de0eb318cd81a2443be0169b7d372f5c6135c3de3ab043d676bd7","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:10f8faca9555a386d88ba15ab36bb44588172422730409460f05f835d54a50fc","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}},{"block":null,"heading":"Entities","paragraphs":[{"citation":"275-10-15-2","para":"15-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">The guidance in the Risks and Uncertainties Topic applies to all entities.</div></div>","snippet":"The guidance in the Risks and Uncertainties Topic applies to all entities.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d6a22be514118f08df2b19e75cc0bc565d5c78804e335149d3c89dcd90f0135d","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f56279c22c7fa76c163b952e935e53a8b352a308486b4c874f1ea7e63442d8de","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}},{"block":null,"heading":"Other Considerations","paragraphs":[{"citation":"275-10-15-3","para":"15-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_832F08E6-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The guidance in the Risks and Uncertainties Topic applies to financial statements prepared in conformity with generally accepted accounting principles (GAAP) and applies to all entities that issue such statements. While the guidance in this Topic applies to complete interim financial statements, it does not apply to condensed or summarized interim financial statements. If comparative financial statements are presented, the disclosure requirements apply only to the financial statements for the most recent fiscal period presented. </span></span></div><div class=\"div pending-text\" id=\"d3e5674-108591__GUID-A4DD483B-3B12-4881-BD90-E1F71D487C1E\"><div class=\"div date-effective\"><span class=\"transition-header\">Transition date:</span><span class=\"p-alphabet\">(P) December 16, 2027; (N) December 16, 2028</span><span class=\"transition-header pipe-separator\">Transition guidance:</span></div><a href=\"/asc/270/10/#270-10-65-1\" class=\"xref\">270-10-65-1</a><span class=\"sfragment\" id=\"GUID-805D3881-BBB0-43DB-8815-19176F7FFDDB\"><span class=\"sfragment-source\">The guidance in the Risks and Uncertainties Topic applies to financial statements prepared in conformity with generally accepted accounting principles (GAAP) and applies to all entities that issue such statements. While the guidance in this Topic applies to complete interim financial statements, it does not apply to </span></span><span class=\"sfragment\" id=\"GUID-7D51B9BD-1BE8-418F-9048-457ACD4CDA70\"><span class=\"sfragment-source\"><a href=\"/glossary/c/#condensed-statements\" class=\"term\" title=\"(P) December 16, 2027; (N) December 16, 2028 270-10-65-1 Financial statements that are presented at a level that is more aggregated than the annual financial statements or have limited notes subject to the disclosure requirements in Topic 270 or both. (U.S. Securities and Exchange Commission [SEC] registrants are required to consider the guidance in paragraph 270-10-S45-2. See Regulation S-X Rule 10-01 [17 CFR 210.10-01] and Regulation S-X Rule 8-03 [17 CFR 210.8-03].)\"><span>condensed statements</span></a>. </span></span><span class=\"sfragment\" id=\"GUID-ED454944-1E04-41C0-A009-57419D77A993\"><span class=\"sfragment-source\">If comparative financial statements are presented, the disclosure requirements apply only to the financial statements for the most recent fiscal period presented. </span></span></div></div>","snippet":"The guidance in the Risks and Uncertainties Topic applies to financial statements prepared in conformity with generally accepted accounting principles (GAAP) and applies to all entities that issue such statements. While …","pending":true,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b7a32687435182d035cdc5f03625c8e847c2b6f6f28a3e95e1c53f9bd8705754","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}},{"citation":"275-10-15-4","para":"15-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_832F0BA0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The disclosure requirements do not encompass risks and uncertainties that might be associated with any of the following: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_832F0D82-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Management or key personnel </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_832F0F44-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Proposed changes in government regulations </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_832F10F9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Proposed changes in accounting principles </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">d</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_832F12AE-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Deficiencies in the internal control structure </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">e</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_832F145C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The possible effects of acts of God, war, or sudden catastrophes. </span></span></div></li></ol></div></div>","snippet":"The disclosure requirements do not encompass risks and uncertainties that might be associated with any of the following:\n(a) Management or key personnel\n(b) Proposed changes in government regulations\n(c) Proposed changes…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c56d3b26e1bcd305c193ae5d1d7d102042fdde5ec8a2f93f4551e003b1898763","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}},{"citation":"275-10-15-5","para":"15-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_832F1616-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Certain disclosure requirements in this Topic supplement the requirements of other authoritative Topics. In many cases, however, the disclosure requirements in this Topic, particularly those relating to certain significant estimates, will be met or partly met by compliance with such other Topics. </span></span></div></div>","snippet":"Certain disclosure requirements in this Topic supplement the requirements of other authoritative Topics. In many cases, however, the disclosure requirements in this Topic, particularly those relating to certain significa…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:174026df42603bf6cc6b30c84afe309d1d8f518da06d7fafc34a42427893feec","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}},{"citation":"275-10-15-6","para":"15-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_832F17D5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The disclosure requirements of this Topic in many circumstances are similar to or overlap the disclosure requirements in other Topics, for example, Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a> and, for public entities, Subtopic <a altsource=\"GUID-C4F02D90-E8CE-47A3-AEA6-8CC0DF6EAFD9.ditamap\" class=\"ditamap\">280-10</a>. The disclosure requirements of this Topic in many circumstances also are similar to or overlap the disclosure requirements of the Securities and Exchange Commission (SEC). This Topic does not alter the requirements of any other Topic or any SEC requirement. </span></span></div></div>","snippet":"The disclosure requirements of this Topic in many circumstances are similar to or overlap the disclosure requirements in other Topics, for example, Topic 450 and, for public entities, Subtopic 280-10. The disclosure requ…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0608f328020289b1817b64d3b7c822b668618e74bb77b359ff01d080cfe2a0be","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9c4a5d7a4b5ab64acd97a8084ff138a9b56c7184a7f8d4755332d4de74877a62","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0aa5b0e4cd7f9683519b15bb7f97d18e8484ea6c886c10a4a2741f8dca797470","downloaded_from":"2026-09-09T23:22:03.852Z","last_downloaded_at":"2026-09-09T23:22:03.852Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482912","source_sha256":"c0d0f07c3f6a597d969a1fdada9b93e1fd2145ccc55d777c6b02b45c3f23ecf8"}},{"number":"50","label":"50 Disclosure","anchor":"50-disclosure","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"275-10-50-1","para":"50-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359829B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">All of the disclosures required by this Subtopic shall be included in the basic financial statements. </span></span> <span class=\"sfragment\" id=\"sfr_83598429-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Reporting entities shall make disclosures in their financial statements about the risks and uncertainties existing as of the date of those statements in the following areas: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_83598563-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Nature of operations</span></span> <span class=\"sfragment\" id=\"sfr_83598667-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">, including the activities in which the entity is currently engaged if principal operations have not commenced</span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359875A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Use of estimates in the preparation of financial statements </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_835989B5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Certain significant estimates </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">d</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_83598AF9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Current vulnerability due to certain concentrations. </span></span> </div> </li> </ol> <span class=\"sfragment\" id=\"sfr_83598BFC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">These four areas of disclosure are not mutually exclusive. The information required by some may overlap. Accordingly, the disclosures required by this Subtopic may be combined in various ways, grouped together, or placed in diverse parts of the financial statements, or included as part of the disclosures made pursuant to the requirements of other Topics. </span></span> </div> </div>","snippet":"All of the disclosures required by this Subtopic shall be included in the basic financial statements. Reporting entities shall make disclosures in their financial statements about the risks and uncertainties existing as …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cb50b9398e126791e7754d586b259b9e890e0f8a356571560d0dbe483a3e269b","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:975ede39130f99dac50aadbb763f6026516489d53fd0d9ef2d5541961879bb48","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"block":null,"heading":"Nature of Operations/Activities","paragraphs":[{"citation":"275-10-50-2","para":"50-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_83598D46-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If an entity has commenced planned principal operations, the entity's </span></span> <span class=\"sfragment\" id=\"sfr_83598EA6-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">financial statements shall include a description of the major products or services the reporting entity sells or provides and its principal markets, including the locations of those markets. If the entity operates in more than one business, the disclosure also shall indicate the relative importance of its operations in each business and the basis for this determination—for example, assets, revenues, or earnings. Not-for-profit entities' (NFPs') disclosures should briefly describe the principal services performed by the entity and the revenue sources for the entity's services. Disclosures about the nature of operations or activities need not be quantified; relative importance could be conveyed by use of terms such as predominately, about equally, or major and other. </span></span> </div> </div>","snippet":"If an entity has commenced planned principal operations, the entity's financial statements shall include a description of the major products or services the reporting entity sells or provides and its principal markets, i…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6aff5260ad706c05d050bc0db98162e2de91aebe133f9d5d77ef5a6fb8c67ad3","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-2A","para":"50-2A","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_83599011-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity that has not commenced principal operations shall provide disclosures about the risks and uncertainties related to the activities in which the entity is currently engaged and an understanding of what those activities are being directed toward.</span></span> </div> </div>","snippet":"An entity that has not commenced principal operations shall provide disclosures about the risks and uncertainties related to the activities in which the entity is currently engaged and an understanding of what those acti…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f0571fcd8fb89fd50dc0290d7ccbb2cca9ce770c6b77aadeb3ce91c4010f56b6","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-3","para":"50-3","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Examples 1 through 2 (paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/275/10/#275-10-55-2\" class=\"xref\">275-10-55-2 through 55-5</a></div>) for illustrations of disclosure requirements for nature of operations.</div> </div>","snippet":"See Examples 1 through 2 (paragraphs 275-10-55-2 through 55-5) for illustrations of disclosure requirements for nature of operations.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:607b5e5aa928d33ca3ebfe4c3a6f4b476f5b57999f2839719f081240835179c5","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:096f895d89851a66cc04327ba40fcccc79c07774baef04df55ff713a8bbe711a","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"block":null,"heading":"Use of Estimates in the Preparation of Financial Statements","paragraphs":[{"citation":"275-10-50-4","para":"50-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359917A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Financial statements shall include an explanation that the preparation of financial statements in conformity with generally accepted accounting principles (GAAP) requires the use of management's estimates. </span></span> </div> </div>","snippet":"Financial statements shall include an explanation that the preparation of financial statements in conformity with generally accepted accounting principles (GAAP) requires the use of management's estimates.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2733f984db6be1d3b6ec77e85fbfc994bce811caa4bdc9cc40b3c10c0f8a4a08","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-5","para":"50-5","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Example 3 (paragraph <a href=\"/asc/275/10/#275-10-55-6\" class=\"xref\">275-10-55-6</a>) for an illustration of the disclosure requirements of the pervasiveness of estimates in the preparation of financial statements.</div> </div>","snippet":"See Example 3 (paragraph 275-10-55-6) for an illustration of the disclosure requirements of the pervasiveness of estimates in the preparation of financial statements.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:073dda69c54855d3ba982acf2acd690da9f8497b24de57da6a33d76b16ee6d95","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3583eabb03b5b7b3285740563fa6cf34ad73091db7c08d4b0f5cf7cc657e2652","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"block":null,"heading":"Certain Significant Estimates","paragraphs":[{"citation":"275-10-50-6","para":"50-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_835992E1-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Subtopic requires discussion of estimates when, based on known information available before the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>), it is <a href=\"/glossary/r/#reasonably-possible\" class=\"term\" title=\"The chance of the future event or events occurring is more than remote but less than likely.\"><span>reasonably possible</span></a> that the estimate will change in the <a href=\"/glossary/n/#near-term\" class=\"term\" title=\"A period of time not to exceed one year from the date of the financial statements.\"><span>near term</span></a> and the effect of the change will be material. The estimate of the effect of a change in a condition, situation, or set of circumstances that existed at the date of the financial statements shall be disclosed and the evaluation shall be based on known information available before the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>). </span></span> </div> </div>","snippet":"This Subtopic requires discussion of estimates when, based on known information available before the financial statements are issued or are available to be issued (as discussed in Section 855-10-25), it is reasonably pos…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0228a2ea0925f49fcb755777170b11d77b6cff45efd9829fba9905863a821ebb","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-7","para":"50-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359944D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Various Topics require disclosures about uncertainties addressed by those Topics. In particular, Subtopic <a altsource=\"GUID-E13146CA-1337-48D7-BF5C-574604DA8631.ditamap\" class=\"ditamap\">450-20</a> specifies disclosures to be made about contingencies that exist at the date of the financial statements. In addition to disclosures required by Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a> and other accounting Topics, this Subtopic requires disclosures regarding estimates used in the determination of the carrying amounts of assets or liabilities or in disclosure of gain or loss contingencies, as described below. </span></span> </div> </div>","snippet":"Various Topics require disclosures about uncertainties addressed by those Topics. In particular, Subtopic 450-20 specifies disclosures to be made about contingencies that exist at the date of the financial statements. In…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7a3d83ada3bdef5813dde4d4fa120329bd2fab9163d30ed790f33118610b144a","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-8","para":"50-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359958E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure regarding an estimate shall be made when known information available before the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>) indicates that both of the following criteria are met: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_83599680-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">It is at least reasonably possible that the estimate of the effect on the financial statements of a condition, situation, or set of circumstances that existed at the date of the financial statements will change in the near term due to one or more future confirming events. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_835997A4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The effect of the change would be material to the financial statements. </span></span> </div> </li> </ol> </div> </div>","snippet":"Disclosure regarding an estimate shall be made when known information available before the financial statements are issued or are available to be issued (as discussed in Section 855-10-25) indicates that both of the foll…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c721cd6f7346bbf313e07605a24758dcf3a0c5a9b7a703ef79d4daaab9aab0de","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-9","para":"50-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_83599912-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The disclosure shall indicate the nature of the uncertainty and include an indication that it is at least reasonably possible that a change in the estimate will occur in the near term. If the estimate involves a loss contingency covered by Subtopic <a altsource=\"GUID-E13146CA-1337-48D7-BF5C-574604DA8631.ditamap\" class=\"ditamap\">450-20</a>, the disclosure also shall include an estimate of the possible loss or range of loss, or state that such an estimate cannot be made. Disclosure of the factors that cause the estimate to be sensitive to change is encouraged but not required. </span></span> <span class=\"sfragment\" id=\"sfr_83599A53-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The words reasonably possible need not be used in the disclosures required by this Subtopic. </span></span> </div> </div>","snippet":"The disclosure shall indicate the nature of the uncertainty and include an indication that it is at least reasonably possible that a change in the estimate will occur in the near term. If the estimate involves a loss con…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b7d051b7093bbb6833729b2ac4fc044a1f6ab8f9b84d4099d7939ae39cb0c948","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-10","para":"50-10","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_83599B9A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Many entities use risk-reduction techniques to mitigate losses or the uncertainty that may result from future events. If the entity determines that the criteria in paragraph <a href=\"/asc/275/10/#275-10-50-8\" class=\"xref\">275-10-50-8</a> are not met as a result of risk-reduction techniques, the disclosures described in the preceding paragraph and disclosure of the risk-reduction techniques are encouraged but not required. </span></span> </div> </div>","snippet":"Many entities use risk-reduction techniques to mitigate losses or the uncertainty that may result from future events. If the entity determines that the criteria in paragraph 275-10-50-8 are not met as a result of risk-re…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ea43f28122887275c7369a684f500b495e1ea3c74dfb333530eb4cd9bc569f30","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-11","para":"50-11","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_83599D16-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Subtopic's disclosure requirements are separate from and do not change in any way the disclosure requirements or criteria of Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a>; rather, the disclosures required under this Subtopic supplement the disclosures required under that Topic as follows: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_83599EC2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If an estimate (including estimates that involve contingencies covered by Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a>) meets the criteria for disclosure under paragraph <a href=\"/asc/275/10/#275-10-50-8\" class=\"xref\">275-10-50-8</a>, this Subtopic requires disclosure of an indication that it is at least reasonably possible that a change in the estimate will occur in the near term; Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a> does not distinguish between near-term and long-term contingencies. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359A069-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An estimate that does not involve a contingency covered by Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a>, such as estimates associated with long-term operating assets and amounts reported under profitable long-term contracts, may meet the criteria in paragraph <a href=\"/asc/275/10/#275-10-50-8\" class=\"xref\">275-10-50-8</a>. This Subtopic requires disclosure of the nature of the estimate and an indication that it is at least reasonably possible that a change in the estimate will occur in the near term. </span></span> </div> </li> </ol> </div> </div>","snippet":"This Subtopic's disclosure requirements are separate from and do not change in any way the disclosure requirements or criteria of Topic 450; rather, the disclosures required under this Subtopic supplement the disclosures…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e30083f52fbfee373ae0b72b2405c57cf901f620e4e6b763cafd6e5221730803","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-12","para":"50-12","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359A201-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If a loss contingency meets the criteria for disclosure under both Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a> and paragraph <a href=\"/asc/275/10/#275-10-50-8\" class=\"xref\">275-10-50-8</a>, this Subtopic requires disclosure that it is at least reasonably possible that future events confirming the fact of the loss or the change in the estimated amount of the loss will occur in the near term. </span></span> </div> </div>","snippet":"If a loss contingency meets the criteria for disclosure under both Topic 450 and paragraph 275-10-50-8, this Subtopic requires disclosure that it is at least reasonably possible that future events confirming the fact of …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7c1e90bdaf58bc54b004d353f8f92d149dbe5112da298187438921799e1e912f","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-13","para":"50-13","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359A370-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The requirements of paragraph <a href=\"/asc/275/10/#275-10-50-8\" class=\"xref\">275-10-50-8</a> are applicable to long-lived assets whose value may become impaired in the near term (see Subtopic <a altsource=\"GUID-709FAAEC-8DFC-4054-A41F-EFA6FC5A716C.ditamap\" class=\"ditamap\">360-10</a>). </span></span> </div> </div>","snippet":"The requirements of paragraph 275-10-50-8 are applicable to long-lived assets whose value may become impaired in the near term (see Subtopic 360-10).","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b362bb37a12774c6d7449bb6e98bbade3d3d4772c3b9f276336a874c937f9e6e","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-14","para":"50-14","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359A4C8-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Whether an estimate meets the criteria for disclosure under this Subtopic does not depend on the amount that has been reported in the financial statements, but rather on the materiality of the effect that using a different estimate would have had on the financial statements. Simply because an estimate resulted in the recognition of a small financial statement amount, or no amount, does not mean that disclosure is not required under this Subtopic. </span></span> </div> </div>","snippet":"Whether an estimate meets the criteria for disclosure under this Subtopic does not depend on the amount that has been reported in the financial statements, but rather on the materiality of the effect that using a differe…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:31c545e07fcde738ed0730f2464915641f641838583de467c76e100a47e462bb","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-15","para":"50-15","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359A648-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The following are examples of assets and liabilities and related revenues and expenses, and of disclosure of gain or loss contingencies included in financial statements that, based on facts and circumstances existing at the date of the financial statements, may be based on estimates that are particularly sensitive to change in the near term: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359A7A2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Inventory subject to rapid technological obsolescence </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359A8B3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Specialized equipment subject to technological obsolescence </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359A9B2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Valuation allowances for deferred tax assets based on future taxable income </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">d</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359AB09-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Capitalized motion picture film production costs </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">e</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359ACC2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Capitalized computer software costs </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">f</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359AE2C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Deferred policy acquisition costs of insurance entities </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">g</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359AFA5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Valuation allowances for commercial and real estate loans </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">h</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359B0EC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Environmental remediation-related obligations </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">i</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359B229-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Litigation-related obligations </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">j</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359B345-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Contingent liabilities for obligations of other entities </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">k</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359B49F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Amounts reported for long-term obligations, such as amounts reported for pensions and postemployment benefits </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">l</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359B60B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Estimated net proceeds recoverable, the provisions for expected loss to be incurred, or both, on disposition of a business or assets </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">m</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359B76D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Amounts reported for long-term contracts. </span></span> </div> </li> </ol> <span class=\"sfragment\" id=\"sfr_8359B8E9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The above list is not intended to be all-inclusive. See Section <a altsource=\"GUID-89400F54-E7CB-4E5D-8715-E9EFA3F657BA.ditamap\" class=\"ditamap\">275-10-60</a> for links to illustrations of the disclosure requirements that are contained in other Topics. </span></span> </div> </div>","snippet":"The following are examples of assets and liabilities and related revenues and expenses, and of disclosure of gain or loss contingencies included in financial statements that, based on facts and circumstances existing at …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ce8af8456f552f7595bb4de3ce704f1edbc9d5cc049caaadb58375074565b05a","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-15A","para":"50-15A","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359BA7E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In determining whether disclosure about an estimate of the useful life of an intangible asset is required under paragraph <a href=\"/asc/275/10/#275-10-50-8\" class=\"xref\">275-10-50-8</a>, the criterion in item (b) of that paragraph shall be considered met if the effect of either of the following would be material to the financial statements, either individually or in aggregate by major intangible asset class:</span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359BC0F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A change in the useful life of an intangible</span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359BD72-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A change in the expected likelihood of renewal or extension of an intangible asset.</span></span> </div> </li> </ol> </div> </div>","snippet":"In determining whether disclosure about an estimate of the useful life of an intangible asset is required under paragraph 275-10-50-8, the criterion in item (b) of that paragraph shall be considered met if the effect of …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:201b63ae69d21fae4cb00c21523602b117bf7fd8b7e8c491c27a56406ae5423d","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:58cebadd197e7a14670c72ab456035afe1d064bdb101e378d625990d6eb89d8e","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"block":null,"heading":"Current Vulnerability Due to Certain Concentrations","paragraphs":[{"citation":"275-10-50-16","para":"50-16","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359BF09-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Vulnerability from concentrations arises because an entity is exposed to risk of loss greater than it would have had it mitigated its risk through diversification. Such risks of loss manifest themselves differently, depending on the nature of the concentration, and vary in significance. </span></span> <span class=\"sfragment\" id=\"sfr_8359C055-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Financial statements shall disclose the concentrations described in paragraph <a href=\"/asc/275/10/#275-10-50-18\" class=\"xref\">275-10-50-18</a> if, based on information known to management before the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>), all of the following criteria are met: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359C1B7-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The concentration exists at the date of the financial statements. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359C319-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The concentration makes the entity vulnerable to the risk of a near-term <a href=\"/glossary/s/#severe-impact\" class=\"term\" title=\"(Used in reference to current vulnerability due to certain concentrations.) A significant financially disruptive effect on the normal functioning of an entity. Severe impact is a higher threshold than material. Matters that are important enough to influence a user's decisions are deemed to be material, yet they may not be so significant as to disrupt the normal functioning of the entity. Some events are material to an investor because they might affect the price of an entity's capital stock or its debt securities, but they would not necessarily have a severe impact on (disrupt) the entity itself. The concept of severe impact, however, includes matters that are less than catastrophic. Matters that are catastrophic include, for example, those that would result in bankruptcy.\"><span>severe impact</span></a>. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359C475-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">It is at least reasonably possible that the events that could cause the severe impact will occur in the near term. </span></span> </div> </li> </ol> </div> </div>","snippet":"Vulnerability from concentrations arises because an entity is exposed to risk of loss greater than it would have had it mitigated its risk through diversification. Such risks of loss manifest themselves differently, depe…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f4bbd06c97fb5d4243c3b8c413617802d63aa3e1c76ba79bb4468def504b0340","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-17","para":"50-17","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359C578-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Subtopic requires disclosure of certain defined concentrations known to management rather than a wider range of concentrations based on information of which management is reasonably expected to have knowledge. </span></span> </div> </div>","snippet":"This Subtopic requires disclosure of certain defined concentrations known to management rather than a wider range of concentrations based on information of which management is reasonably expected to have knowledge.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8031e975dfac2402d9528a2081fba11856f1e36ecb5c307efcff712aff221693","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-18","para":"50-18","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359C66C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Concentrations, including known group concentrations, described below require disclosure if they meet the criteria of paragraph <a href=\"/asc/275/10/#275-10-50-16\" class=\"xref\">275-10-50-16</a>. (Group concentrations exist if a number of counterparties or items that have similar economic characteristics collectively expose the reporting entity to a particular kind of risk.) Some concentrations may fall into more than one of the following categories: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359C764-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Concentrations in the volume of business transacted with a particular customer, supplier, lender, grantor, or contributor. The potential for the severe impact can result, for example, from total or partial loss of the business relationship. For purposes of this Subtopic, it is always considered at least reasonably possible that any customer, grantor, or contributor will be lost in the near term. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359C85C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Concentrations in revenue from particular products, services, or fund-raising events. The potential for the severe impact can result, for example, from volume or price changes or the loss of patent protection for the particular source of revenue. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359C9AE-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Concentrations in the available sources of supply of materials, labor, or services, or of licenses or other rights used in the entity's operations. The potential for the severe impact can result, for example, from changes in the availability to the entity of a resource or a right. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">d</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359CB16-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Concentrations in the market or geographic area in which an entity conducts its operations. The potential for the severe impact can result, for example, from negative effects of the economic and political forces within the market or geographic area. For purposes of this Subtopic, it is always considered at least reasonably possible that operations located outside an entity's home country will be disrupted in the near term. </span></span> </div> </li> </ol> </div> </div>","snippet":"Concentrations, including known group concentrations, described below require disclosure if they meet the criteria of paragraph 275-10-50-16. (Group concentrations exist if a number of counterparties or items that have s…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7ffc42178d319b9085c87a3570194833a7ceb3d88c67d5d17fee1aa5cf11b2de","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-19","para":"50-19","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359CC2F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Concentrations of financial instruments, and other concentrations not described in the preceding paragraph, are not addressed in this Subtopic. However, these other concentrations may be required to be disclosed pursuant to other Topics, such as Subtopic <a altsource=\"GUID-949FE0F4-4A71-425B-8009-76B1AB716B1C.ditamap\" class=\"ditamap\">825-10</a> . </span></span> </div> </div>","snippet":"Concentrations of financial instruments, and other concentrations not described in the preceding paragraph, are not addressed in this Subtopic. However, these other concentrations may be required to be disclosed pursuant…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4d9eb60c7f00a97e4d20c4d3810e53777fba81e0b282a480fa0f48949d29a51d","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-20","para":"50-20","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359CD23-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure of concentrations meeting the criteria of paragraph <a href=\"/asc/275/10/#275-10-50-16\" class=\"xref\">275-10-50-16</a> shall include information that is adequate to inform users of the general nature of the risk associated with the concentration. For those concentrations of labor (see paragraph <a href=\"/asc/275/10/#275-10-50-18\" class=\"xref\">275-10-50-18(c)</a>) subject to collective bargaining agreements and concentrations of operations located outside of the entity's home country (see paragraph <a href=\"/asc/275/10/#275-10-50-18\" class=\"xref\">275-10-50-18(d)</a>) that meet the criteria in paragraph <a href=\"/asc/275/10/#275-10-50-16\" class=\"xref\">275-10-50-16</a>, the following specific disclosures are required: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359CE15-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For labor subject to collective bargaining agreements, disclosure shall include both the percentage of the labor force covered by a collective bargaining agreement and the percentage of the labor force covered by a collective bargaining agreement that will expire within one year. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_8359CEEC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For operations located outside the entity's home country, disclosure shall include the carrying amounts of net assets and the geographic areas in which they are located. </span></span> </div> </li> </ol> <span class=\"sfragment\" id=\"sfr_8359CFDD-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> This Subtopic does not, however, prohibit entities from also stating in disclosures of concentrations related to customers, grantors, or contributors or operations located outside the entity's home country that the entity does not expect that the business relationship will be lost or does not expect that the foreign operations will be disrupted if such is the case. </span></span> </div> </div>","snippet":"Disclosure of concentrations meeting the criteria of paragraph 275-10-50-16 shall include information that is adequate to inform users of the general nature of the risk associated with the concentration. For those concen…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dbd652c1d0e2067dc57d1756963f43fb0b3e7c5a5c1e125f63b8bd9af0677824","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-21","para":"50-21","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359D106-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Adequate information about some concentrations may already be presented in other parts of the financial statements. For example, adequate information about assets or operations located outside the entity's home country may be included in disclosures made to comply with Subtopic <a altsource=\"GUID-C4F02D90-E8CE-47A3-AEA6-8CC0DF6EAFD9.ditamap\" class=\"ditamap\">280-10</a>. In accordance with the guidance in this Subtopic, such information need not be repeated. </span></span> </div> </div>","snippet":"Adequate information about some concentrations may already be presented in other parts of the financial statements. For example, adequate information about assets or operations located outside the entity's home country m…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:aac012b32433dda0e7985e9fd0538a23589a93cbd9b0b3cd27b685bc10d8f6d4","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"citation":"275-10-50-22","para":"50-22","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Examples 2 and 4 through 8 (paragraphs <a href=\"/asc/275/10/#275-10-55-4\" class=\"xref\">275-10-55-4</a> and <div class=\"xref-range displayInline\"><a href=\"/asc/275/10/#275-10-55-8\" class=\"xref\">275-10-55-8 through 55-19</a></div>) for illustrations of the disclosure requirements for current vulnerability due to certain concentrations.</div> </div>","snippet":"See Examples 2 and 4 through 8 (paragraphs 275-10-55-4 and 275-10-55-8 through 55-19) for illustrations of the disclosure requirements for current vulnerability due to certain concentrations.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a54e64eaad307c165c4a6773c0ff79137281f4c9d346ff823c5d9a3d2b86431b","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:31f5b25c1960ce195d26290597e986cadd41136d6d7be23f157dc7be7f932c72","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"block":null,"heading":"Application of Disclosure Criteria","paragraphs":[{"citation":"275-10-50-23","para":"50-23","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_8359D203-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An assessment of whether a disclosure is required should not be found to be in error simply as a result of future events. For example, reporting a concentration not followed by a severe impact does not imply that the disclosure should not have been made, because something that has only a reasonably possible chance of occurring obviously might not occur. Similarly, the occurrence of a severe impact related to a concentration not disclosed in the prior-year financial statements would not suggest noncompliance with the requirements of this Subtopic if an appropriate judgment had been made that a near-term severe impact was not at least reasonably possible at the prior reporting date. In addition, a severe impact may arise from a concentration of which management did not have knowledge at the time the financial statements were issued. </span></span> </div> </div>","snippet":"An assessment of whether a disclosure is required should not be found to be in error simply as a result of future events. For example, reporting a concentration not followed by a severe impact does not imply that the dis…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:119daecd1a3d12357a13d4a1284ebb04ec88f802f7dc58c3e7a93bd602917cc2","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8f9cfe98bdf85ab43f7e61875e365d65ab56d96626c8c05751e40a3a4268e8ed","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c903ccece4bdaa301684590b2d6ca5c648a4b1dc1d4ebb0f77391d7cb88373fb","downloaded_from":"2026-09-09T23:22:11.404Z","last_downloaded_at":"2026-09-09T23:22:11.404Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482861","source_sha256":"b710ee76c036aa15caa502417d2def1bc01746ffec07a782629851c884d0cb7b"}},{"number":"55","label":"55 Implementation Guidance and Illustrations","anchor":"55-implementation-guidance-and-illustrations","is_sec":false,"groups":[{"block":null,"heading":"Illustrations","paragraphs":[{"citation":"275-10-55-1","para":"55-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837DF220-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The kinds of disclosures required by this Subtopic are illustrated in this Section. </span></span><span class=\"sfragment\" id=\"sfr_837DF37F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Each consists of a situation in which the disclosure would likely be made or not made and a discussion of how and why the illustrative disclosure complies with the requirements of this Subtopic or why no disclosure is required by this Subtopic. </span></span><span class=\"sfragment\" id=\"sfr_837DF484-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Some of the concentrations described in the Examples may illustrate more than one of the categories of concentrations given in paragraph <a href=\"/asc/275/10/#275-10-50-18\" class=\"xref\">275-10-50-18(a) through (d)</a>. </span></span></div></div>","snippet":"The kinds of disclosures required by this Subtopic are illustrated in this Section. Each consists of a situation in which the disclosure would likely be made or not made and a discussion of how and why the illustrative d…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:90837006cac2a3887e352387291ec5fa19db9428759f49438704bedcecdad6e2","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-2","para":"55-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837DF58D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Example illustrates the disclosures required by paragraph <a href=\"/asc/275/10/#275-10-50-2\" class=\"xref\">275-10-50-2</a>. Conglomerate, Inc. is a U.S.-based multinational entity. Conglomerate's principal lines of business are automotive products, aerospace products and technologies, textiles, and nonprescription health-care products. The principal markets for Conglomerate's automotive and aerospace products and technologies are European- and Far East-based industrial concerns. Textiles are sold primarily to U.S. clothing manufacturers, while nonprescription health-care products are sold to wholesale and retail distributors worldwide. The operations of Conglomerate in any one country are not significant in relation to its overall operations. The following illustrates disclosure of the nature of operations required by this Subtopic. </span></span><ul class=\"ul simple\" id=\"d3e6957-108593__GUID-B01221C0-0A43-45EB-A64E-33A98975A00C\"><li class=\"li\" id=\"d3e6957-108593__SL6295857-108593\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837DF693-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Conglomerate, Inc. is a multinational manufacturer and engineering concern. The entity's principal lines of business are automotive products, aerospace products and technologies, textiles, and nonprescription health-care products, all of which are about equal in size based on sales. The principal markets for the automotive and aerospace products and technologies are European- and Far East-based industrial concerns. Textiles are sold primarily to domestic clothing manufacturers, while nonprescription health-care products are sold primarily to wholesale and retail distributors worldwide. </span></span></div></li></ul></div></div>","snippet":"This Example illustrates the disclosures required by paragraph 275-10-50-2. Conglomerate, Inc. is a U.S.-based multinational entity. Conglomerate's principal lines of business are automotive products, aerospace products …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9469e5103c873fb0bbf702d4de4912ee5a0bbe374108bed91fefc368bccbac12","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-3","para":"55-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837DF78E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This disclosure provides all of the following: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837DF87E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Information necessary for users not familiar with the operations of Conglomerate to identify and consider the broad risks and uncertainties associated with the businesses and markets in which it operates and competes. From the disclosures provided, financial statement users having a general knowledge of business matters should be able to assess that Conglomerate's product lines are subject to different and varied risks. Those financial statement users familiar with the businesses recognize the general risks associated with each of these businesses and their related markets. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837DF972-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Information that facilitates the overall understanding of the financial information presented. This kind of disclosure could provide users with a basis for comparing an entity's financial information with that of competitors or with applicable industry statistics. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837DFAD3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Insight into the location of Conglomerate's principal markets, although on a broad scale. Because Conglomerate's markets are so diverse, it likely would not be useful to enumerate the specific locations of the entity's markets. For this reason, the manner in which the information is disclosed in the illustrative disclosure is sufficient to meet the broad objectives of this Subtopic. </span></span></div></li></ol></div></div>","snippet":"This disclosure provides all of the following:\n(a) Information necessary for users not familiar with the operations of Conglomerate to identify and consider the broad risks and uncertainties associated with the businesse…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:53392a929047251ba193ffc7a38fe0d40a4ff03db29c05ac5fcbbde282c8dfee","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-3A","para":"55-3A","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837DFBC6-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Example illustrates one way to comply with the disclosures required by paragraph <a href=\"/asc/275/10/#275-10-50-2\" class=\"xref\">275-10-50-2</a>. NewCompany, Inc. (Company) is a business that has not commenced planned principal operations. The Company is designed to develop and manufacture specialized environmental test equipment for measuring air quality. The Company's first product is a rapid-result test kit to identify certain airborne contaminants in high-risk environments. The Company's activities since inception have consisted principally of acquiring technology patents, raising capital, and performing research and development activities. The following illustrates disclosure required by this Subtopic of the nature of activities for an entity that has not commenced principal operations.</span></span><ul class=\"ul simple\" id=\"SL51808927-108593__GUID-CF8F4F2E-9932-464E-AB2D-76236E0DE45B\"><li class=\"li\" id=\"SL51808927-108593__SL51808949-108593\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837DFCAF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">NewCompany, Inc. (Company) is a business whose planned principal operations are the design, engineering, and manufacturing of air quality test equipment. The Company is currently conducting research and development activities to operationalize certain patented technology that the Company owns so it can manufacture rapid-result test kits for certain airborne contaminants in high-risk environments. </span></span></div></li><li class=\"li\" id=\"SL51808927-108593__SL51808950-108593\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837DFE0A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">During the last year, the Company secured a research facility in Norwalk, Connecticut, which houses all of its employees and research and development activities. The Company also is in the process of raising additional equity capital to support the completion of its development activities to begin manufacturing the test kits as soon as possible. </span></span></div></li><li class=\"li\" id=\"SL51808927-108593__SL51808951-108593\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837DFEDF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The Company's activities are subject to significant risks and uncertainties, including failing to secure additional funding to operationalize the Company's current technology before another company develops similar technology and test kits. </span></span></div></li></ul></div></div>","snippet":"This Example illustrates one way to comply with the disclosures required by paragraph 275-10-50-2. NewCompany, Inc. (Company) is a business that has not commenced planned principal operations. The Company is designed to …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1d1b28f880fbc658a4981828df0307657463c6566d658e0bc94cedd6d6157c5c","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-3B","para":"55-3B","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837DFFB6-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The disclosure in paragraph <a href=\"/asc/275/10/#275-10-55-3A\" class=\"xref\">275-10-55-3A</a> provides all of the following:</span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E0088-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Information necessary for financial statement users not familiar with the activities of the Company to identify and consider the broad risks and uncertainties associated with businesses that have activities that are similar to those in which the Company is engaged. From the disclosures provided, financial statement users that have a general knowledge of business matters should be able to assess both of the following: </span></span></div><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">1</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E015A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">That the Company's activities are subject to different and varied risks, including the risk that the entity may be affected by the rapidly changing and intensely competitive technology market </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">2</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E022C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">That the Company is dependent on additional capital resources for the continuation and expansion of its business activities.</span></span></div></li></ol></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E02FA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Information that facilitates the overall understanding of the financial information provided. That kind of disclosure could provide users with a basis for understanding the Company's financial information and comparing that information with similar entities or other relevant statistics.</span></span></div></li></ol></div></div>","snippet":"The disclosure in paragraph 275-10-55-3A provides all of the following:\n(a) Information necessary for financial statement users not familiar with the activities of the Company to identify and consider the broad risks and…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b24da5c762d53dca486f151bd536ad47aaf58eb6742fc7f037efef668b071822","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-4","para":"55-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E03E7-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Example illustrates the disclosures required by paragraphs <a href=\"/asc/275/10/#275-10-50-2\" class=\"xref\">275-10-50-2</a> and <a href=\"/asc/275/10/#275-10-50-16\" class=\"xref\">275-10-50-16</a>. Smith Corporation, formerly Smith Munitions Corporation, was founded in 1940. At that time, Smith's principal business was the design and manufacture of artillery ammunition and other explosives. In 1959, commensurate with the evolution of its principal business to the design, engineering, and manufacture of military aircraft for sale to the U.S. government, Smith changed its name to Smith Corporation. Smith has one factory, located in New York. The following illustrates disclosure of the nature of operations required by this Subtopic. </span></span><ul class=\"ul simple\" id=\"d3e6985-108593__GUID-D20C0276-13B7-41E7-AFEC-1D1EFD33F411\"><li class=\"li\" id=\"d3e6985-108593__SL6295861-108593\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E04E9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Smith Corporation is engaged principally in the design, engineering, and manufacturing of military aircraft and related peripheral equipment for sale primarily to the U.S. government. </span></span></div></li></ul></div></div>","snippet":"This Example illustrates the disclosures required by paragraphs 275-10-50-2 and 275-10-50-16. Smith Corporation, formerly Smith Munitions Corporation, was founded in 1940. At that time, Smith's principal business was the…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:86b04b3098d8f44292771ebd6e9d867b067f68275abaad35d9a10b66e81f3496","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-5","para":"55-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E05FB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This disclosure provides all of the following: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E0702-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Information needed by users who are not familiar with the operations of Smith Corporation to identify and consider the broad risks and uncertainties faced by all or most entities operating in a specific business or market, which in this case is the defense contracting business. From this disclosure, financial statement users having a general knowledge of business matters should know that Smith's business may be heavily affected by future changes in U.S. defense and foreign policies. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E081F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Information that aids in the overall understanding of the other financial information presented. Certain accounting procedures involving estimation may apply only to particular industries or may be relevant in comparing a business entity's financial statements with those of business entities in other industries. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E0933-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Insight into the location of Smith's principal product markets and information about its current vulnerability due to concentrations. Users would be able to recognize and assess Smith's dependency on sales to the U.S. government (assuming the loss of the government as a customer would result in a <a href=\"/glossary/n/#near-term\" class=\"term\" title=\"A period of time not to exceed one year from the date of the financial statements.\"><span>near-term</span></a> <a href=\"/glossary/s/#severe-impact\" class=\"term\" title=\"(Used in reference to current vulnerability due to certain concentrations.) A significant financially disruptive effect on the normal functioning of an entity. Severe impact is a higher threshold than material. Matters that are important enough to influence a user's decisions are deemed to be material, yet they may not be so significant as to disrupt the normal functioning of the entity. Some events are material to an investor because they might affect the price of an entity's capital stock or its debt securities, but they would not necessarily have a severe impact on (disrupt) the entity itself. The concept of severe impact, however, includes matters that are less than catastrophic. Matters that are catastrophic include, for example, those that would result in bankruptcy.\"><span>severe impact</span></a> to Smith Corporation). </span></span></div></li></ol></div></div>","snippet":"This disclosure provides all of the following:\n(a) Information needed by users who are not familiar with the operations of Smith Corporation to identify and consider the broad risks and uncertainties faced by all or most…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dd37f122d20676190e1cc1f829a07912ede97948845f50542de4fc509018f1b8","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-6","para":"55-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E0A41-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The following illustrates disclosure of the pervasiveness of estimates in the financial statements of all reporting entities as required by paragraph <a href=\"/asc/275/10/#275-10-50-4\" class=\"xref\">275-10-50-4</a>. </span></span><ul class=\"ul simple\" id=\"d3e7075-108593__GUID-2724008C-02FC-473D-8667-DEC400657D0C\"><li class=\"li\" id=\"d3e7075-108593__SL6295865-108593\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E0B3C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The preparation of financial statements in conformity with generally accepted accounting principles (GAAP) requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates. </span></span></div></li></ul></div></div>","snippet":"The following illustrates disclosure of the pervasiveness of estimates in the financial statements of all reporting entities as required by paragraph 275-10-50-4.\nThe preparation of financial statements in conformity wit…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c5208f307d710cd08665125ac7626c4d27e874198e435ae1dbc043851f8dfd0c","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-7","para":"55-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E0C3E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This disclosure is intended to inform users of the inherent uncertainties in measuring assets and liabilities and related revenues and expenses and contingent assets and liabilities, and that subsequent resolution of some matters could differ significantly from the resolution that is currently expected. Such disclosure alerts users that uncertainties are present in the financial statements of all reporting entities. </span></span></div></div>","snippet":"This disclosure is intended to inform users of the inherent uncertainties in measuring assets and liabilities and related revenues and expenses and contingent assets and liabilities, and that subsequent resolution of som…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d5ed82a6971a79342306c8cb0129bb3f166b18f4391c0cdf365eb6ad5907fdb0","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-8","para":"55-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E0D7E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Example illustrates the disclosures required by paragraph <a href=\"/asc/275/10/#275-10-50-16\" class=\"xref\">275-10-50-16</a>. Hi-Tech Corporation is a manufacturer of electronic equipment in which integrated circuits are an important component. Substantially all of Hi-Tech's customers require that only those vendors that meet quality criteria be used as sources for integrated circuits. Hi-Tech currently buys all of its integrated circuits from one manufacturer in the Far East, and no long-term supply contract exists. There are only a limited number of manufacturers of these particular integrated circuits, and a change of supplier could significantly disrupt the business due to the time it would take to locate and qualify a new vendor. The following illustrates the disclosure required by this Subtopic. </span></span><ul class=\"ul simple\" id=\"d3e7098-108593__GUID-C41B59B6-B297-459C-8000-209DFB238571\"><li class=\"li\" id=\"d3e7098-108593__SL6295866-108593\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E0EFA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> The entity currently buys all of its integrated circuits, an important component of its products, from one supplier. Although there are a limited number of manufacturers of the particular integrated circuits, management believes that other suppliers could provide similar integrated circuits on comparable terms. A change in suppliers, however, could cause a delay in manufacturing and a possible loss of sales, which would affect operating results adversely. </span></span></div></li></ul></div></div>","snippet":"This Example illustrates the disclosures required by paragraph 275-10-50-16. Hi-Tech Corporation is a manufacturer of electronic equipment in which integrated circuits are an important component. Substantially all of Hi-…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2234a94cc89862d1dadb1a25834d83408e403b2b983da19137a51f05e058a5f7","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-9","para":"55-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E1075-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Although other sources of supply of this particular kind of integrated circuit are currently available, the limited number of such sources and the time it takes to qualify new vendors makes Hi-Tech currently vulnerable to the risk of a near-term severe impact. </span></span><span class=\"sfragment\" id=\"sfr_837E1192-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Disclosure is required because it is considered at least <a href=\"/glossary/r/#reasonably-possible\" class=\"term\" title=\"The chance of the future event or events occurring is more than remote but less than likely.\"><span>reasonably possible</span></a>, based on information known to management before the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>), that the events that could cause the severe impact will occur. </span></span></div></div>","snippet":"Although other sources of supply of this particular kind of integrated circuit are currently available, the limited number of such sources and the time it takes to qualify new vendors makes Hi-Tech currently vulnerable t…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9a3c1f4aed71b27ea8ef64639e7a7c623923725a5f9d4fff406cd3fdcafced4f","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-10","para":"55-10","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E1296-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Example illustrates the disclosures required by paragraph <a href=\"/asc/275/10/#275-10-50-16\" class=\"xref\">275-10-50-16</a>. Minnesota Company manufactures various products in which wheat is an important raw material. It currently buys 80 percent of its wheat from one supplier, but numerous alternate sources of supply are readily available on comparable terms. </span></span></div></div>","snippet":"This Example illustrates the disclosures required by paragraph 275-10-50-16. Minnesota Company manufactures various products in which wheat is an important raw material. It currently buys 80 percent of its wheat from one…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5e08db635944eac9dedb44a510100314074e1d0f7aa1bcde0e4a300e2aef8605","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-11","para":"55-11","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E138C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">No disclosure is required. </span></span></div></div>","snippet":"No disclosure is required.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8db324e2e8fafa9eba60c1165b510b828580106d7a85a59742850f757589b701","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-12","para":"55-12","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E14B1-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The concentration exists at the date of the financial statements, and an inability to obtain wheat could result in a near-term severe impact. No disclosure is required, however, because numerous alternative suppliers are available and, therefore, it is not considered at least reasonably possible that events that could cause a near-term severe impact will occur. </span></span></div></div>","snippet":"The concentration exists at the date of the financial statements, and an inability to obtain wheat could result in a near-term severe impact. No disclosure is required, however, because numerous alternative suppliers are…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e2028686227a6a15c065d2116a16fa593d3932129896892f6aeef50978452e0d","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-13","para":"55-13","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E15EF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Example illustrates the disclosures required by paragraph <a href=\"/asc/275/10/#275-10-50-16\" class=\"xref\">275-10-50-16</a>. Felt Pharmaceutical Company is a national pharmaceutical manufacturer headquartered in Atlanta, Georgia. Felt markets a wide range of pharmaceutical products. One of its better-known name-brand products, a significant source of profits and cash flow, is an antibiotic on which there is a patent that will expire in six months. Competitors are preparing to enter the market with generic alternatives when Felt's patent expires, and the concentration therefore has the potential for a severe impact. The following illustrates the disclosure required by this Subtopic. </span></span><ul class=\"ul simple\" id=\"d3e7152-108593__GUID-119EFA07-20A0-4F00-8A83-9CC9EBB0E35D\"><li class=\"li\" id=\"d3e7152-108593__SL6295867-108593\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E16E9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Felt Pharmaceutical Company is a national pharmaceutical manufacturer with sales throughout the United States. The patent on one of its major products expires next year. This product accounts for approximately one-third [or \"a significant portion\"] of the entity's revenues and a higher percentage of its gross profit. </span></span></div></li></ul></div></div>","snippet":"This Example illustrates the disclosures required by paragraph 275-10-50-16. Felt Pharmaceutical Company is a national pharmaceutical manufacturer headquartered in Atlanta, Georgia. Felt markets a wide range of pharmaceu…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bd306ed47546e17a54656a35a787ff287a81fb0a6a904b3bf7ebe43d06d5a881","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-14","para":"55-14","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E17E3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The disclosure focuses on the nature of the business and on Felt's current vulnerability due to a concentration of its patented products. Disclosure is required because the concentration exists at the date of the financial statements, because the effect on Felt's cash flows and profitability of competitors entering the market when the patent expires could be a severe impact, and because it is considered at least reasonably possible that the events that could cause the severe impact will occur in the near term. </span></span><span class=\"sfragment\" id=\"sfr_837E18D0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Because the risk is evident from the description of the concentration, no further explanation of the risk is necessary. </span></span></div></div>","snippet":"The disclosure focuses on the nature of the business and on Felt's current vulnerability due to a concentration of its patented products. Disclosure is required because the concentration exists at the date of the financi…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f7beeb50987585ae50689a6ac0b54bde12b54f74371274da6fb8604e938b3a56","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-15","para":"55-15","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E19C5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Example illustrates the disclosures required by paragraph <a href=\"/asc/275/10/#275-10-50-16\" class=\"xref\">275-10-50-16</a>. Team Company is a manufacturer of industrial hardware. The contract with the union representing Team's labor force is due to expire in the coming year. Over the past 30 years, Team has, in rare instances, been affected by work stoppages in the course of contract negotiations; the stoppages have always been of short duration, and none has had a significant effect on Team's financial statements. Although management expects that there will initially be some differences between its offer to the union and union demands, based on preliminary discussions with union leaders, management believes it is very unlikely that those differences will result in a protracted conflict. </span></span></div></div>","snippet":"This Example illustrates the disclosures required by paragraph 275-10-50-16. Team Company is a manufacturer of industrial hardware. The contract with the union representing Team's labor force is due to expire in the comi…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1ec66939c4f29aa2a22c269fb54f22a2260a2f21f09d4421265a3a9862cff481","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-16","para":"55-16","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E1AA2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">No disclosure is required. </span></span></div></div>","snippet":"No disclosure is required.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3fe9f5be0c0ba663b92df9e515de72462019527f483c648cce0f8bce37ed24c2","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-17","para":"55-17","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E1B7F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Although the concentration of labor exists at the date of the financial statements and it could result in a severe impact in the near term due to the potential of a protracted work stoppage, no disclosure is required because it is not considered at least reasonably possible in the light of past experience and current conditions that a protracted work stoppage will take place. </span></span></div></div>","snippet":"Although the concentration of labor exists at the date of the financial statements and it could result in a severe impact in the near term due to the potential of a protracted work stoppage, no disclosure is required bec…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5bdc5c927b2f317870a68caa51ea061e14f2f15fb85d62e363cbe691c9be9663","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-18","para":"55-18","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E1C89-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Example illustrates the disclosures required by paragraph <a href=\"/asc/275/10/#275-10-50-16\" class=\"xref\">275-10-50-16</a>. Offshore Productions, Inc., a Delaware corporation, designs and manufactures optical lenses, which it markets throughout the United States. Substantially all of its manufacturing operations are carried out in a single facility, which is located in Switzerland and which is owned by Offshore's subsidiary. Offshore does not carry insurance for risks of loss. Offshore's consolidated balance sheet includes $20 million representing the net assets of those operations. The following illustrates the disclosure required by this Subtopic. </span></span><ul class=\"ul simple\" id=\"d3e7211-108593__GUID-A2C1502F-58CF-4585-8234-C8EE12B6CE81\"><li class=\"li\" id=\"d3e7211-108593__SL6295868-108593\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_837E1DD1-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Included in the entity's consolidated balance sheet at December 31, 20X4, are the net assets of the entity's manufacturing operations, all of which are located in a single facility in Switzerland and which total approximately $20 million. </span></span></div></li></ul></div></div>","snippet":"This Example illustrates the disclosures required by paragraph 275-10-50-16. Offshore Productions, Inc., a Delaware corporation, designs and manufactures optical lenses, which it markets throughout the United States. Sub…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3f2b6b22051a28e4ad4c2678090647e58b3228a2a4751e8718795b12528a6236","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"citation":"275-10-55-19","para":"55-19","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_837E1F27-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">All of Offshore's specialized manufacturing capacity is concentrated in a single facility. As noted in paragraph <a href=\"/asc/275/10/#275-10-50-18\" class=\"xref\">275-10-50-18</a>, it is always considered at least reasonably possible that the use of a facility located outside of an entity's home country could be disrupted in the near term. Due to the specialized nature of the assets, it would not be possible to find replacement capacity quickly. Accordingly, loss of the facility could produce a near-term severe impact to Offshore. This disclosure informs financial statement users of that concentration of operations in a particular geographic area and informs them of the risks and uncertainties associated with the concentration. Because the concentration is one of operations located outside of Offshore's home country, the disclosure also sets forth the carrying amount of the net assets, as required by this Subtopic. </span></span></div></div>","snippet":"All of Offshore's specialized manufacturing capacity is concentrated in a single facility. As noted in paragraph 275-10-50-18, it is always considered at least reasonably possible that the use of a facility located outsi…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ab6896edd01583a14cfd343c5fb8b0f5ab72489a2aaac91a9a4bf6510cf84036","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5441e9c24fc6979140c6a33059b307f660dc7b13902b566e0edf4ec543c918b2","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:37696d8d247e683d563d3e436af2067d07bd46c82c30ad6ab43823319cf65612","downloaded_from":"2026-09-09T23:22:15.046Z","last_downloaded_at":"2026-09-09T23:22:15.046Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482836","source_sha256":"ba0dd813002088cd2c1344b412b82764963c745da7e341824c92b5859f44cd51"}},{"number":"60","label":"60 Relationships","anchor":"60-relationships","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"275-10-60-1","para":"60-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/maintenance-updates-2018/\" class=\"xref\">Paragraph superseded by Maintenance Update 2018-02</a>.</div></div>","snippet":"Paragraph superseded by Maintenance Update 2018-02.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6438743332dd3d36f34277c9639dbf84968e4406d4b7d13b51c2596de3f0ffd6","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4753541d6a6a5f95cdfc78a65d6f94142e50a8225de5836cfe3d5a106b508e4f","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Interim Reporting","paragraphs":[{"citation":"275-10-60-2","para":"60-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">See paragraph <a href=\"/asc/270/10/#270-10-50-6\" class=\"xref\">270-10-50-6</a> for guidance on disclosure of contingencies in summarized interim financial information of publicly traded entities.</div><div class=\"div pending-text\" id=\"d3e7422-108594__GUID-F44BD814-F20A-4F61-8741-255027BD8EE5\"><div class=\"div date-effective\"><span class=\"transition-header\">Transition date:</span><span class=\"p-alphabet\">(P) December 16, 2027; (N) December 16, 2028</span><span class=\"transition-header pipe-separator\">Transition guidance:</span></div><a href=\"/asc/270/10/#270-10-65-1\" class=\"xref\">270-10-65-1</a><span class=\"sfragment\" id=\"GUID-E53C1508-CB10-4409-8F10-166E1529E68A\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/270/10/#270-10-50-69\" class=\"xref\">270-10-50-69</a> for guidance on disclosure of contingencies in interim financial </span></span><span class=\"sfragment\" id=\"GUID-1FCA7413-1A01-4FEE-BAB0-38FA4CB5B5BE\"><span class=\"sfragment-source\">statements and notes in accordance with generally accepted accounting principles.</span></span></div></div>","snippet":"See paragraph 270-10-50-6 for guidance on disclosure of contingencies in summarized interim financial information of publicly traded entities.Transition date:(P) December 16, 2027; (N) December 16, 2028Transition guidanc…","pending":true,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bdf4b84c448c81a0df55e11a9c142192224f4a8d72deb799d7155cbdaf4cc9cb","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ce021fc080f0049ce67e4111670e0cb011a6558a248576efb4450fc89f5eb8d2","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Inventory","paragraphs":[{"citation":"275-10-60-3","para":"60-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_83A82138-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See Example 1 (paragraph <a href=\"/asc/330/10/#330-10-55-8\" class=\"xref\">330-10-55-8</a>) for an illustration of the kinds of disclosures required for risks and uncertainties related to inventory. </span></span></div></div>","snippet":"See Example 1 (paragraph 330-10-55-8) for an illustration of the kinds of disclosures required for risks and uncertainties related to inventory.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f1ea45d2cd5c9201112421aafa8b2050ae43d44baae45b78774246fa4074bded","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dece1d72ff5290aeadb23e4328b22fa527b08da35225c008e7fbc148184da353","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Property, Plant, and Equipment","paragraphs":[{"citation":"275-10-60-3A","para":"60-3A","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Example 12 (paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/360/10/#360-10-55-50\" class=\"xref\">360-10-55-50 through 55-54</a></div>) for an illustration of the kinds of disclosures required for risks and uncertainties related to specialized manufacturing equipment.</div></div>","snippet":"See Example 12 (paragraphs 360-10-55-50 through 55-54) for an illustration of the kinds of disclosures required for risks and uncertainties related to specialized manufacturing equipment.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:42606558039abb70d6b3cd8c664667967c5df83526f5c400b3c995d3e22439df","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8625020fee54aa5a8e4039ae861fdeb3da9610b1f5b472c9baccd6e5258845d7","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Asset Retirement and Environmental Obligations","paragraphs":[{"citation":"275-10-60-4","para":"60-4","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Example 1 (paragraph <a href=\"/asc/410/30/#410-30-55-7\" class=\"xref\">410-30-55-7</a>) for an illustration of the kinds of disclosures required for risks and uncertainties related to environmental remediation liabilities.</div></div>","snippet":"See Example 1 (paragraph 410-30-55-7) for an illustration of the kinds of disclosures required for risks and uncertainties related to environmental remediation liabilities.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fb11732d4f151c605e041a4ece8fe326d4ac7583734af57bc7ca2dcca434044c","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4fa75824d9404d89ed761f329f4a1fa83d21eedb55f725edc7e257d647f90321","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Contingencies","paragraphs":[{"citation":"275-10-60-5","para":"60-5","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Example 3 (paragraphs <a href=\"/asc/450/20/#450-20-55-36\" class=\"xref\">450-20-55-36</a>) for an illustration of the kinds of disclosures required for risks and uncertainties related to loss contingencies.</div></div>","snippet":"See Example 3 (paragraphs 450-20-55-36) for an illustration of the kinds of disclosures required for risks and uncertainties related to loss contingencies.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:eee5e46a411957ef0f1b7a5da89cd0da458efa9f0c72eec995c514f124d129ef","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:28feed6d54c654872db1c8574629d7ee7d894990e8916429611c6e1cd6c3278a","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Guarantees","paragraphs":[{"citation":"275-10-60-6","para":"60-6","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Example 1 (paragraph <a href=\"/asc/460/10/#460-10-55-25\" class=\"xref\">460-10-55-25</a>) for an illustration of the kinds of disclosures required for risks and uncertainties related to guarantees of debt.</div></div>","snippet":"See Example 1 (paragraph 460-10-55-25) for an illustration of the kinds of disclosures required for risks and uncertainties related to guarantees of debt.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d33e82fde7eb34d81ce1f7ce30ec5506f21d3491a398429e44ec17046ae3c030","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bade1807bc58da594d578bb2827b738d0b8b5392d2985ed36b7561e6f97da2f3","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Revenue Recognition","paragraphs":[{"citation":"275-10-60-7","para":"60-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_83A8227E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/606/10/#606-10-50-1\" class=\"xref\">606-10-50-1 through 50-23</a></div> for disclosures of <a href=\"/glossary/r/#revenue\" class=\"term\" title=\"Inflows or other enhancements of assets of an entity or settlements of its liabilities (or a combination of both) from delivering or producing goods, rendering services, or other activities that constitute the entity's ongoing major or central operations.\"><span>revenue</span></a> from <a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>contracts</span></a> with <a href=\"/glossary/c/#customer\" class=\"term\" title=\"A party that has contracted with an entity to obtain goods or services that are an output of the entity's ordinary activities in exchange for consideration.\"><span>customers</span></a>.</span></span></div></div>","snippet":"See paragraphs 606-10-50-1 through 50-23 for disclosures of revenue from contracts with customers.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:afdfdc680b5a45ce01b7cd38fdd2d477667bab83e58d3bb4ce441830567ab579","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:44e85efb27c6fca6e4088f65456ac81e0982d808fb7067d82e71c0cc135a590a","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Income Taxes","paragraphs":[{"citation":"275-10-60-8","para":"60-8","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Example 31 (paragraph <a href=\"/asc/740/10/#740-10-55-218\" class=\"xref\">740-10-55-218</a>) for an illustration of the kinds of disclosures required for risks and uncertainties related to income taxes.</div></div>","snippet":"See Example 31 (paragraph 740-10-55-218) for an illustration of the kinds of disclosures required for risks and uncertainties related to income taxes.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:eab60c12505e432a0b55f74694b755bd9a67776e5c6479b8e44c16e2ddab34ea","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"citation":"275-10-60-9","para":"60-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2012-04/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2012-04</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2012-04.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fcfd7b757eb524e3e24015538cbc8cc4c7b4598315e8a2ec01d02f3c570931c6","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:002ca07c0366d1e0cde9e0a6a79960e7bbf1e45925c81161fbf0f9542a8be793","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Not-for-Profit Entities","paragraphs":[{"citation":"275-10-60-10","para":"60-10","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Example 12 (paragraph <a href=\"/asc/605/958/#605-958-55-69\" class=\"xref\">958-605-55-69</a>) for an illustration of the kinds of disclosures required for risks and uncertainties related to contributions.</div></div>","snippet":"See Example 12 (paragraph 958-605-55-69) for an illustration of the kinds of disclosures required for risks and uncertainties related to contributions.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7d68b6a433168f698627d52954ad26f932c0dbd5caa22f84f33089d2b52229f2","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b2b287c24c8fa033eb6e30a12a9477fb7fc08257d548332fdd940c24eb10f098","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}},{"block":null,"heading":"Software","paragraphs":[{"citation":"275-10-60-11","para":"60-11","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Example 1 (paragraph <a href=\"/asc/985/20/#985-20-55-23\" class=\"xref\">985-20-55-23</a>) for an illustration of the kinds of disclosures for risks and uncertainties related to capitalized software costs.</div></div>","snippet":"See Example 1 (paragraph 985-20-55-23) for an illustration of the kinds of disclosures for risks and uncertainties related to capitalized software costs.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5b07b0dacb4013b7ede484bd68c5bcb42ddb8f0ec3ec5fc78add04a435d66447","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:630dc8c0ad1281e09c5dba2fdaa07ad0cbe424f9e74eafe82a724c176cfcf5d3","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:296ca246fe6e45d0dce89b961f1944dda11bbda89ab9097a94574dfc5d839229","downloaded_from":"2026-09-09T23:22:17.586Z","last_downloaded_at":"2026-09-09T23:22:17.586Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482811","source_sha256":"8f9e9362f788c7c0eba801deb644c0c3931be06c511e1f26620bc2ddb7edcc93"}}],"enrichment":{"summary":"ASC 275-10 requires all entities to disclose, in the basic financial statements, information about risks and uncertainties existing at the balance sheet date in four areas: nature of operations (or, if principal operations have not commenced, current activities), the pervasive use of management estimates, certain significant estimates, and current vulnerability due to certain concentrations (275-10-50-1). The hallmark of the Subtopic is selectivity — disclosure is triggered only when specified screening criteria are met, generally when it is at least reasonably possible that a change or severe impact will occur in the near term and the effect would be material or severe (275-10-50-8; 275-10-50-16). It excludes risks from management/key personnel, proposed regulatory or accounting changes, internal control deficiencies, and acts of God, war, or sudden catastrophes (275-10-15-4).","key_points":["Four required disclosure areas, all in the basic financial statements: nature of operations (including activities if principal operations have not commenced), use of estimates, certain significant estimates, and current vulnerability due to certain concentrations (275-10-50-1).","Nature of operations disclosure must describe major products/services, principal markets and their locations, and, if the entity operates in more than one business, the relative importance of each and the basis (assets, revenues, or earnings); it need not be quantified (275-10-50-2), and an entity that has not commenced principal operations describes its current activities and what they are directed toward (275-10-50-2A).","Financial statements must include an explanation that preparation under GAAP requires the use of management's estimates (275-10-50-4; illustrated at 275-10-55-6).","A significant estimate must be disclosed when known information available before issuance indicates both that (a) it is at least reasonably possible the estimate of the effect of a condition existing at the balance sheet date will change in the near term due to future confirming events and (b) the effect of the change would be material (275-10-50-8); the disclosure states the nature of the uncertainty and the near-term reasonable possibility, and for Topic 450 loss contingencies also an estimate of possible loss or range or a statement that none can be made (275-10-50-9).","Disclosure of a significant estimate does not depend on the amount recognized — a small or zero recorded amount does not excuse disclosure if a different estimate would have had a material effect (275-10-50-14); examples of sensitive estimates are listed at 275-10-50-15.","Concentrations described in 275-10-50-18 (customer/supplier/lender/grantor/contributor volume; revenue from particular products, services or fund-raising events; sources of supply, labor, licenses; market or geographic area) must be disclosed if the concentration exists at the balance sheet date, makes the entity vulnerable to a near-term severe impact, and it is at least reasonably possible the triggering events will occur in the near term (275-10-50-16); loss of a customer, grantor, or contributor and disruption of operations outside the home country are always deemed at least reasonably possible.","Specific quantitative disclosures are required for labor subject to collective bargaining agreements (percentage of labor force covered and percentage expiring within one year) and for operations outside the home country (carrying amounts of net assets and geographic areas) (275-10-50-20)."],"categories":["Disclosure","Financial statement presentation","Contingencies and guarantees","Presentation"],"audience_level":"intermediate","student_note":"This is the source of the boilerplate \"use of estimates\" note and concentration-of-credit/customer disclosures you see in almost every set of financial statements; the common mistake is assuming a small or zero recorded balance excuses disclosure (275-10-50-14) or confusing ASC 275's near-term \"reasonably possible change in estimate\" trigger with ASC 450's loss-contingency trigger — the two are separate and additive.","related_topics":["450-20","280-10","855-10","360-10","825-10","270-10"],"key_concepts":["risks and uncertainties disclosure","nature of operations","use of estimates","significant estimates","near-term severe impact","concentrations","reasonably possible","group concentrations"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b0a6e744a48ade464df2c2ee95a06efbc2a2a9926f55c6f68b5c51e2216dce38","downloaded_from":"2026-09-09T23:21:55.847Z","last_downloaded_at":"2026-09-09T23:22:20.205Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"450-20","title":"Loss Contingencies","topic_title":"Contingencies","score":0.8211,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:76659af81f3047d6fd3fbf34b0ab47e7857460dce9568f05c1709d22df09d60d","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"235-10","title":"Overall","topic_title":"Notes to Financial Statements","score":0.7827,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:98e7e8aab6e23d9cbe7963394d38883c9c053f18c517c25123ae132417d65c89","downloaded_from":"2026-09-09T23:14:08.789Z","last_downloaded_at":"2026-09-09T23:14:35.922Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"825-10","title":"Overall","topic_title":"Financial Instruments","score":0.7817,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:88820dc680617bba62c6771221523f8d1c2135a5a101e31b97727ea63202a4ac","downloaded_from":"2026-09-10T01:44:11.504Z","last_downloaded_at":"2026-09-10T01:44:42.941Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-10","title":"Overall","topic_title":"Contingencies","score":0.7806,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ca1a437de5496cfbc571c6fa38fee25e6a49673a96f1278db1efe5c4687ef1fc","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"270-10","title":"Overall","topic_title":"Interim Reporting","score":0.7651,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7831be7e62ea0d2e75a6c54da633f93a04e8c6f8d273831f41ed0b1292468266","downloaded_from":"2026-09-09T23:19:37.216Z","last_downloaded_at":"2026-09-09T23:20:17.142Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"850-10","title":"Overall","topic_title":"Related Party Disclosures","score":0.7646,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:488989c5bd8912a5ce641a5d105852887c08df63d24104214dc4e6000b9cbf0c","downloaded_from":"2026-09-10T02:02:17.059Z","last_downloaded_at":"2026-09-10T02:02:39.436Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"274-10","title":"Overall","topic_title":"Personal Financial Statements","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:08812f69abdab71192733ce0b1a164f13eb7d52e6bd91464765285d9833a27ca","downloaded_from":"2026-09-09T23:21:27.622Z","last_downloaded_at":"2026-09-09T23:21:52.593Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"275-912","title":"Contractors—Federal Government","topic_title":"Risks and Uncertainties","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f227c948ca8ca100898ada93a84dc9d2584344848acfc364ce272e149b6e55e3","downloaded_from":"2026-09-09T23:22:22.572Z","last_downloaded_at":"2026-09-09T23:22:31.368Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:199e45e557006c110078addbf96f397c27ef3de2693b628b674972c0920db2e0","downloaded_from":"2026-09-09T23:21:55.847Z","last_downloaded_at":"2026-09-09T23:22:20.205Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"275-912","topic":"275","title":"Contractors—Federal Government","area":"Presentation","paragraphs":10,"summary":"This Subtopic requires federal government contractors to make incremental disclosures about the risks and uncertainties arising from the government's unilateral right to terminate contracts for its convenience. The effect of a termination is reflected in the period the termination occurs (or earlier if it is a subsequent event attributable to balance-sheet-date conditions), with only the reasonably estimable portions of a termination claim recognized and the remainder disclosed. Controversial or undeterminable claim elements are stated at amounts estimated to be collectible or excluded and disclosed.","concepts":["termination for convenience","termination claim","government contractor risk","reasonable estimate","subsequent events","known controversial items","note disclosure of potential termination"],"categories":["Disclosure","Contingencies and guarantees","Industry-specific","Presentation"],"level":"intermediate","topic_title":"Risks and Uncertainties","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"275-912-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div> <div class=\"norm-text\"> <table class=\"asc-table\" id=\"SL51799847-165667\"> <tr> <td class=\"entry\"> <strong class=\"ph b\">Paragraph</strong> </td> <td class=\"entry\"> <strong class=\"ph b\">Action</strong> </td> <td class=\"entry\"> <strong class=\"ph b\">Accounting Standards Update</strong> </td> <td class=\"entry\"> <strong class=\"ph b\">Date</strong> </td> </tr> <tr> <td class=\"entry\"></td> <td class=\"entry\"></td> <td class=\"entry\"></td> <td class=\"entry\"></td> </tr> <tr> <td class=\"entry\"> <a href=\"/asc/275/912/#275-912-05-1\" class=\"xref\">912-275-05-1</a> </td> <td class=\"entry\">Amended</td> <td class=\"entry\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a> </td> <td class=\"entry\">05/28/2014</td> </tr> <tr> <td class=\"entry\"> <a href=\"/asc/275/912/#275-912-50-1\" class=\"xref\">912-275-50-1</a> </td> <td class=\"entry\">Superseded</td> <td class=\"entry\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a> </td> <td class=\"entry\">05/28/2014</td> </tr> <tr> <td class=\"entry\"> <a href=\"/asc/275/912/#275-912-50-2\" class=\"xref\">912-275-50-2</a> </td> <td class=\"entry\">Amended</td> <td class=\"entry\"> <a href=\"/asc-pdf/GUID-8C0B93FE-237A-4BFA-8880-FE749B3CAFCB.pdf\" class=\"pdf-link\" target=\"_blank\" rel=\"noopener\">Maintenance Update 2016-11 (PDF)</a> </td> <td class=\"entry\">06/27/2016</td> </tr> <tr> <td class=\"entry\"> <a href=\"/asc/275/912/#275-912-50-4\" class=\"xref\">912-275-50-4</a> </td> <td class=\"entry\">Amended</td> <td class=\"entry\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a> </td> <td class=\"entry\">05/28/2014</td> </tr> </table> </div> </div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\n912-275-05-1 | Amended | Accounting Standards Update No. 2014-09 | 05/28/2014 |\n912-275-…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:efc8382e17c1bb0d8c0957ca65bffe18f5db523a8de9489139586ffd27f08269","downloaded_from":"2026-09-09T23:22:22.572Z","last_downloaded_at":"2026-09-09T23:22:22.572Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478045","source_sha256":"c3e08001c9701960bce5425284529c759a18c4fc88e5fb097227ccc23d5e4d7b"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d0f9248262327269d8bd748eb42d99303526735406a45f452e91161b003f7c7a","downloaded_from":"2026-09-09T23:22:22.572Z","last_downloaded_at":"2026-09-09T23:22:22.572Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478045","source_sha256":"c3e08001c9701960bce5425284529c759a18c4fc88e5fb097227ccc23d5e4d7b"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8aea5403d405e36fec6fa972cc8bcfc9ca82e56723c877c845a932919fcb6756","downloaded_from":"2026-09-09T23:22:22.572Z","last_downloaded_at":"2026-09-09T23:22:22.572Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478045","source_sha256":"c3e08001c9701960bce5425284529c759a18c4fc88e5fb097227ccc23d5e4d7b"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"275-912-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic provides guidance to government contractors related to incremental disclosures about risks and uncertainties associated with contracts terminated for the convenience of the government.</div></div>","snippet":"This Subtopic provides guidance to government contractors related to incremental disclosures about risks and uncertainties associated with contracts terminated for the convenience of the government.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:917b207c3b1e37cabe45b03da0a92a68e61a6e3c6248f3befc6c7bcb6cda32be","downloaded_from":"2026-09-09T23:22:25.275Z","last_downloaded_at":"2026-09-09T23:22:25.275Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478447","source_sha256":"f7a006377cbf86fdc96dc598bf7ecaf5fa0855c530ae408bc0fd3e5b74f6ccfe"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7e5549ee28edc11aca32c8398b8b8ebd9f5bbe315534d7ec2fb025f610cb88a5","downloaded_from":"2026-09-09T23:22:25.275Z","last_downloaded_at":"2026-09-09T23:22:25.275Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478447","source_sha256":"f7a006377cbf86fdc96dc598bf7ecaf5fa0855c530ae408bc0fd3e5b74f6ccfe"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6f7f09427e5dce27edb0dd95a8732bcca5d44001ab3edd7b6eb63e17702ad17b","downloaded_from":"2026-09-09T23:22:25.275Z","last_downloaded_at":"2026-09-09T23:22:25.275Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478447","source_sha256":"f7a006377cbf86fdc96dc598bf7ecaf5fa0855c530ae408bc0fd3e5b74f6ccfe"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"275-912-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section <a altsource=\"GUID-EFF9C8BB-54F8-4F3B-8687-D616705EBFFA.ditamap\" class=\"ditamap\">912-10-15</a>.</div></div>","snippet":"This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 912-10-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e1fa174f999d4edd5a44486c40af746ed55ff3b6361611cf04553b0982fe56a3","downloaded_from":"2026-09-09T23:22:26.892Z","last_downloaded_at":"2026-09-09T23:22:26.892Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478335","source_sha256":"7ee35b2d97806aa8e8d23c0595087f40bb30a09c0cd4cd861237e305a3951dbe"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ffd75be8b70852b6f28ebc00661bb6e3f34b9ee6ebf34be21c07f6616bf4519a","downloaded_from":"2026-09-09T23:22:26.892Z","last_downloaded_at":"2026-09-09T23:22:26.892Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478335","source_sha256":"7ee35b2d97806aa8e8d23c0595087f40bb30a09c0cd4cd861237e305a3951dbe"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3933b1bf2ce3394b57ecb41bccf9c1c9e3c13e8de185c7b58658c28877f1e119","downloaded_from":"2026-09-09T23:22:26.892Z","last_downloaded_at":"2026-09-09T23:22:26.892Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478335","source_sha256":"7ee35b2d97806aa8e8d23c0595087f40bb30a09c0cd4cd861237e305a3951dbe"}},{"number":"50","label":"50 Disclosure","anchor":"50-disclosure","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"275-912-50-1","para":"50-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-09</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-09.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f9622f965c1a645ed39426e4c6fade8aa8c01e90a1ff824ad86ca1768f4c1c19","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:286690395630eea04e85bc746dee56ff4222fc473a6adfbdd962a0198bda2974","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}},{"block":null,"heading":"Termination Claims","paragraphs":[{"citation":"275-912-50-2","para":"50-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_D6DCB247-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In some circumstances it will be impossible to make a reasonable estimate of a termination claim in time for inclusion in the financial statements of the period in which the termination occurs. Effect may then be given in the statements to those parts of the termination claim that are determinable with reasonable certainty and disclosure made, by note or otherwise, of the status of the remainder. </span></span></div></div>","snippet":"In some circumstances it will be impossible to make a reasonable estimate of a termination claim in time for inclusion in the financial statements of the period in which the termination occurs. Effect may then be given i…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8cf43bf1f7f4322d5523baa529f898577436772c203a3a4b594b4c5a2a3c5bdd","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}},{"citation":"275-912-50-3","para":"50-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_D6DCB443-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the contractor's claim includes items of known controversial nature it shall be stated at the amount estimated to be collectible. If a particular termination claim or part thereof is so uncertain in amount that it cannot be reasonably estimated, it is preferable not to give effect to that part of the claim in the financial statements. If the total of such undeterminable elements is material, the circumstances shall be disclosed in statements issued or available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>) before the removal of the uncertainty. </span></span><span class=\"sfragment\" id=\"sfr_D6DCB5AE-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In an extreme circumstance involving undeterminable claims, consideration shall be given to delaying the issuance of financial statements until necessary data are available. </span></span></div></div>","snippet":"If the contractor's claim includes items of known controversial nature it shall be stated at the amount estimated to be collectible. If a particular termination claim or part thereof is so uncertain in amount that it can…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:67515c15252dc707f1d049c6bf9ba90c5e2684b992f962f5ff55c3236994e712","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}},{"citation":"275-912-50-4","para":"50-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_D6DCB721-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The effect of a contract termination shall be reflected in the financial statements of the contractor in the period in which the termination occurs, or earlier if the termination is a subsequent event occurring before the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>) and attributable to conditions that existed at the date of the balance sheet. If sufficient information is not available to predict the effect of a very recent termination, then the best information available shall be disclosed in the notes to financial statements in conformity with Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a>. </span></span><span class=\"sfragment\" id=\"sfr_D6DCB86F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The effective date of termination shall be the date at which the contractor acquires the right to receive payment on the terminated portion of the contract. </span></span></div></div>","snippet":"The effect of a contract termination shall be reflected in the financial statements of the contractor in the period in which the termination occurs, or earlier if the termination is a subsequent event occurring before th…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6791a3ef1c1d7bb3eb13cdd87c57e1725b994df6602c24ae581d90da7e48cd9e","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}},{"citation":"275-912-50-5","para":"50-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_D6DCB9B4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Significant items of a known controversial nature also shall be disclosed in the notes to financial statements, although estimates of ultimate amounts to be realized may not be determinable. </span></span></div></div>","snippet":"Significant items of a known controversial nature also shall be disclosed in the notes to financial statements, although estimates of ultimate amounts to be realized may not be determinable.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ed4f5636dd20872f03da8a3fad000af18a9249650e6e2be4fd1e2e6f4b3603fa","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}},{"citation":"275-912-50-6","para":"50-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_D6DCBAF3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The government contractor is subject to a degree of risk different from its commercial counterpart because of the unilateral contract right of the government to terminate a contract. </span></span><span class=\"sfragment\" id=\"sfr_D6DCBC4A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If there are indications that a contract termination may occur and the termination would have a material effect on the contractor's operations, disclosure of the circumstances and the potential effects shall be made in the notes to financial statements. </span></span><span class=\"sfragment\" id=\"sfr_D6DCBD7D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Indicators of a potential contract termination include notice of a possible termination, contract performance problems, procurement cutbacks, and so forth. </span></span></div></div>","snippet":"The government contractor is subject to a degree of risk different from its commercial counterpart because of the unilateral contract right of the government to terminate a contract. If there are indications that a contr…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:544ceb592a8919a7acadabe4d1a76b4332670d095a29bd46cfd3cdadd3f068fd","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}},{"citation":"275-912-50-7","para":"50-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_D6DCBEBA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraph <a href=\"/asc/420/10/#420-10-50-1\" class=\"xref\">420-10-50-1</a> provides guidance on information about contract terminations to be disclosed in notes to financial statements. </span></span></div></div>","snippet":"Paragraph 420-10-50-1 provides guidance on information about contract terminations to be disclosed in notes to financial statements.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2da2fabb2b233671f49996f659bf554ad7b51267d59f96610925699580011712","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:85402f681f381d132076ae4006921e855dee85b928976afef368d1f32337bc11","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3aac94d5ff773236ca914a658d4537d8e815d4bc245712777fee358b1fc64208","downloaded_from":"2026-09-09T23:22:29.312Z","last_downloaded_at":"2026-09-09T23:22:29.312Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479072","source_sha256":"320352489e8e1278997b06324486d707c80288c5898b1fe2bdc52c0ec2afb2f4"}}],"enrichment":{"summary":"This Subtopic requires federal government contractors to make incremental disclosures about the risks and uncertainties arising from the government's unilateral right to terminate contracts for its convenience. The effect of a termination is reflected in the period the termination occurs (or earlier if it is a subsequent event attributable to balance-sheet-date conditions), with only the reasonably estimable portions of a termination claim recognized and the remainder disclosed. Controversial or undeterminable claim elements are stated at amounts estimated to be collectible or excluded and disclosed.","key_points":["Effect may be given to the parts of a termination claim determinable with reasonable certainty, with note disclosure of the status of the remainder when a reasonable estimate cannot be made in time (275-912-50-2).","Claim items of a known controversial nature shall be stated at the amount estimated to be collectible; parts too uncertain to be reasonably estimated are preferably not given effect, and if material, the circumstances shall be disclosed before the uncertainty is removed (275-912-50-3).","In extreme circumstances involving undeterminable claims, consideration shall be given to delaying issuance of the financial statements until necessary data are available (275-912-50-3).","A contract termination is reflected in the period it occurs, or earlier if it is a subsequent event before issuance attributable to conditions existing at the balance sheet date; the effective date of termination is when the contractor acquires the right to receive payment on the terminated portion (275-912-50-4).","If information is insufficient to predict the effect of a very recent termination, the best available information shall be disclosed in the notes in conformity with Topic 450 (275-912-50-4).","Significant items of a known controversial nature shall be disclosed in the notes even if ultimate amounts realizable are not determinable (275-912-50-5).","If indicators (notice of possible termination, performance problems, procurement cutbacks) suggest a termination that would materially affect operations, the circumstances and potential effects shall be disclosed in the notes (275-912-50-6)."],"categories":["Disclosure","Contingencies and guarantees","Industry-specific","Presentation"],"audience_level":"intermediate","student_note":"Exam traps here are timing and measurement: the termination is recognized when the contractor acquires the right to payment (or earlier as a Type I subsequent event), and only reasonably estimable amounts are recorded — uncertain or controversial elements get disclosed, not accrued. Students often forget that mere indicators of a possible termination (not just an actual one) trigger disclosure if the effect would be material.","related_topics":["912-10","855-10","450","420-10","275-10","606"],"key_concepts":["termination for convenience","termination claim","government contractor risk","reasonable estimate","subsequent events","known controversial items","note disclosure of potential termination"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5cd45d531f14647fd4b56e28d9f64a295dfc7931dcbeb6d549c531ba7d0d227b","downloaded_from":"2026-09-09T23:22:22.572Z","last_downloaded_at":"2026-09-09T23:22:31.368Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"310-912","title":"Contractors—Federal Government","topic_title":"Receivables","score":0.7941,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:226835abf3d5278774e2d33739666c788b307cdff13c6102fd3994799b792ad6","downloaded_from":"2026-09-09T23:28:22.756Z","last_downloaded_at":"2026-09-09T23:28:44.996Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"912-20","title":"Contract Costs","topic_title":"Contractors—Federal Government","score":0.7901,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:864ebdecad47960f2d0da61289d1f8ce8d13458d4a3982ccd247bf267f7d38fd","downloaded_from":"2026-09-10T02:10:07.952Z","last_downloaded_at":"2026-09-10T02:10:28.388Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"405-912","title":"Contractors—Federal Government","topic_title":"Liabilities","score":0.7696,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5d9488cf1a8579063e27996c337d35a415d87f312a154f05e8b2f9f51155c3b4","downloaded_from":"2026-09-10T00:16:17.263Z","last_downloaded_at":"2026-09-10T00:16:37.609Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-912","title":"Contractors—Federal Government","topic_title":"Contingencies","score":0.7684,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:41e895c0483e9446bd41a0d22518de4972154d39e81e487afb4ab37beffa1a4d","downloaded_from":"2026-09-10T00:28:13.837Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"220-912","title":"Contractors—Federal Government","topic_title":"Income Statement—Reporting Comprehensive Income","score":0.7242,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d492a2c18cf78c2696c03a5ac47aa1f3d0c44d6219a8f79d47a1ccd6255289cf","downloaded_from":"2026-09-09T23:05:16.949Z","last_downloaded_at":"2026-09-09T23:05:24.159Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"912-10","title":"Overall","topic_title":"Contractors—Federal Government","score":0.7115,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6509fe442afdb111eee6e0b6badc54d8008efd1bdfce468fea79ab88f6d39c9c","downloaded_from":"2026-09-10T02:09:56.619Z","last_downloaded_at":"2026-09-10T02:10:05.382Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"275-10","title":"Overall","topic_title":"Risks and Uncertainties","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:558f3fba6069591f94be7f488185587c715095c6bf833ae297a91b0807c837d2","downloaded_from":"2026-09-09T23:21:55.847Z","last_downloaded_at":"2026-09-09T23:22:20.205Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"280-10","title":"Overall","topic_title":"Segment Reporting","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:afb31c52e181bb9093eda47817ddc1b4c88fb55420d7979697c235e64b856612","downloaded_from":"2026-09-09T23:22:33.842Z","last_downloaded_at":"2026-09-09T23:23:07.457Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e3dbc9cddd1fa67d9f27a399d6d47b2c60d0650af792bb8da42b89382734673c","downloaded_from":"2026-09-09T23:22:22.572Z","last_downloaded_at":"2026-09-09T23:22:31.368Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"paragraphs":84,"summary":"ASC 275 governs disclosure of risks and uncertainties that exist at the balance sheet date. The general Subtopic (275-10) requires all entities to disclose four things in the basic financial statements — nature of operations (or, if principal operations have not commenced, current activities), the pervasive use of management's estimates, certain significant estimates, and current vulnerability from certain concentrations — but only when screening criteria are met: generally that it is at least reasonably possible a change or severe impact will occur in the near term and the effect would be material or severe (275-10-50-1; 50-8; 50-16). The industry Subtopic (275-912) layers on incremental disclosures for federal government contractors exposed to the government's unilateral right to terminate for convenience, requiring recognition only of the reasonably estimable portions of a termination claim with the remainder disclosed. The core idea is selectivity: ASC 275 is a disclosure-only standard that does not change recognition or measurement, and it expressly excludes risks such as management/key personnel, proposed regulatory or accounting changes, internal control weaknesses, and acts of God or war (275-10-15-4).","concepts":["nature of operations disclosure","use of estimates","certain significant estimates","concentrations and severe impact","reasonably possible near-term change","government contract termination for convenience","disclosure in basic financial statements","loss contingency interaction with topic 450"],"categories":["Disclosure","Contingencies and guarantees","Industry-specific","Financial statement presentation"],"level":"intermediate","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fe212a550db3b6259a21e659f2de8ac65f164dd1d8de7e4bfe7d1d5b07950d7a","downloaded_from":"2026-09-09T23:21:55.847Z","last_downloaded_at":"2026-09-09T23:22:31.368Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}