{"schema_version":2,"canonical_url":"https://asc.understandingaccounting.org/asc/325/40/","source":"FASB Accounting Standards Codification, Basic View","usage":"Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.","number":"325-40","topic":"325","title":"Beneficial Interests in Securitized Financial Assets","area":"Assets","paragraphs":49,"summary":"ASC 325-40 governs how a holder recognizes interest income on beneficial interests in securitized financial assets — both a transferor's retained interests in securitizations accounted for as sales under Topic 860 and purchased beneficial interests. The holder measures accretable yield at acquisition as the excess of cash flows expected to be collected (or contractual cash flows, for PCD beneficial interests) over the initial investment (or initial amortized cost basis), and accretes it into interest income using the effective yield method. Expected cash flows must be updated each period; favorable or adverse changes are run first through the credit loss guidance in Topic 326, with any residual change adjusting accretable yield prospectively.","concepts":["beneficial interests","securitized financial assets","accretable yield","effective yield method","cash flows expected to be collected","purchased financial assets with credit deterioration","reference amount","cost recovery method"],"categories":["Financial instruments","Subsequent measurement","Impairment","Initial measurement"],"level":"advanced","topic_title":"Investments—Other","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"325-40-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" frame=\"all\" id=\"SL6773833-161569\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/glossary/b/#beneficial-interests\" class=\"term\" title=\"Rights to receive all or portions of specified cash inflows received by a trust or other entity, including, but not limited to, all of the following: Senior and subordinated shares of interest, principal, or other cash inflows to be passed-through or paid-through Premiums due to guarantors Commercial paper obligations Residual interests, whether in the form of debt or equity.\"><span>Beneficial Interests</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr><tr><td class=\"entry\"><a href=\"/glossary/d/#debt-security\" class=\"term\" title=\"Any security representing a creditor relationship with an entity. The term debt security also includes all of the following: Preferred stock that by its terms either must be redeemed by the issuing entity or is redeemable at the option of the investor A collateralized mortgage obligation (or other instrument) that is issued in equity form but is required to be accounted for as a nonequity instrument regardless of how that instrument is classified (that is, whether equity or debt) in the issuer's statement of financial position U.S. Treasury securities U.S. government agency securities Municipal securities Corporate bonds Convertible debt Commercial paper All securitized debt instruments, such as collateralized mortgage obligations and real estate mortgage investment conduits Interest-only and principal-only strips. The term debt security excludes all of the following: Option contracts Financial futures contracts Forward contracts Lease contracts Receivables that do not meet the definition of security and, so, are not debt securities, for example: Trade accounts receivable arising from sales on credit by industrial or commercial entities Loans receivable arising from consumer, commercial, and real estate lending activities of financial institutions.\"><span>Debt Security</span></a> (1st def.)</td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><strong class=\"ph b\">Financial Asset</strong> (1st def.)</td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><strong class=\"ph b\">Financial Asset</strong> (1st def.)</td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/f/#financial-asset\" class=\"term\" title=\"Cash, evidence of an ownership interest in an entity, or a contract that conveys to one entity a right to do either of the following: Receive cash or another financial instrument from a second entity Exchange other financial instruments on potentially favorable terms with the second entity.\"><span>Financial Asset</span></a> (2nd def.)</td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/p/#purchased-financial-assets-with-credit-deterioration\" class=\"term\" title=\"Acquired individual financial assets (or acquired groups of financial assets with similar risk characteristics) that as of the date of acquisition have experienced a more-than-insignificant deterioration in credit quality since origination, as determined by an acquirer's assessment. See paragraph 326-20-55-5 for more information on the meaning of similar risk characteristics for assets measured on an amortized cost basis.\"><span>Purchased Financial Assets with Credit Deterioration</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/p/#purchased-financial-assets-with-credit-deterioration\" class=\"term\" title=\"Acquired individual financial assets (or acquired groups of financial assets with similar risk characteristics) that as of the date of acquisition have experienced a more-than-insignificant deterioration in credit quality since origination, as determined by an acquirer's assessment. See paragraph 326-20-55-5 for more information on the meaning of similar risk characteristics for assets measured on an amortized cost basis.\"><span>Purchased Financial Assets with Credit Deterioration</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-05-1\" class=\"xref\">325-40-05-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-15-2\" class=\"xref\">325-40-15-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-15-3\" class=\"xref\">325-40-15-3</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-15-4\" class=\"xref\">325-40-15-4</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-15-5\" class=\"xref\">325-40-15-5</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2012-04/\" class=\"xref\">Accounting Standards Update No. 2012-04</a></td><td class=\"entry\">10/01/2012</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-15-6\" class=\"xref\">325-40-15-6</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-01/\" class=\"xref\">Accounting Standards Update No. 2016-01</a></td><td class=\"entry\">01/05/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-25-2\" class=\"xref\">325-40-25-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-25-2\" class=\"xref\">325-40-25-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-01/\" class=\"xref\">Accounting Standards Update No. 2016-01</a></td><td class=\"entry\">01/05/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-30-1\" class=\"xref\">325-40-30-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-30-1A\" class=\"xref\">325-40-30-1A</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-30-2\" class=\"xref\">325-40-30-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-30-4\" class=\"xref\">325-40-30-4</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-1\" class=\"xref\">325-40-35-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2025-12/\" class=\"xref\">Accounting Standards Update No. 2025-12</a></td><td class=\"entry\">12/17/2025</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-2\" class=\"xref\">325-40-35-2</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-2\" class=\"xref\">325-40-35-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-01/\" class=\"xref\">Accounting Standards Update No. 2016-01</a></td><td class=\"entry\">01/05/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-3\" class=\"xref\">325-40-35-3</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><div class=\"xref-range displayInline\"><a href=\"/asc/325/40/#325-40-35-4\" class=\"xref\">325-40-35-4 through 35-4B</a></div></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2025-12/\" class=\"xref\">Accounting Standards Update No. 2025-12</a></td><td class=\"entry\">12/17/2025</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-4\" class=\"xref\">325-40-35-4</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><div class=\"xref-range displayInline\"><a href=\"/asc/325/40/#325-40-35-4A\" class=\"xref\">325-40-35-4A through 35-4C</a></div></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-6\" class=\"xref\">325-40-35-6</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-6A\" class=\"xref\">325-40-35-6A</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-7\" class=\"xref\">325-40-35-7</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-8\" class=\"xref\">325-40-35-8</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-9\" class=\"xref\">325-40-35-9</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-10\" class=\"xref\">325-40-35-10</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2025-12/\" class=\"xref\">Accounting Standards Update No. 2025-12</a></td><td class=\"entry\">12/17/2025</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-10\" class=\"xref\">325-40-35-10</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-10A\" class=\"xref\">325-40-35-10A</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-10B\" class=\"xref\">325-40-35-10B</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-11\" class=\"xref\">325-40-35-11</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-12\" class=\"xref\">325-40-35-12</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-13\" class=\"xref\">325-40-35-13</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-14\" class=\"xref\">325-40-35-14</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-14\" class=\"xref\">325-40-35-14</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-35-15\" class=\"xref\">325-40-35-15</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-55-1\" class=\"xref\">325-40-55-1</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-55-1\" class=\"xref\">325-40-55-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2015-10/\" class=\"xref\">Accounting Standards Update No. 2015-10</a></td><td class=\"entry\">06/12/2015</td></tr><tr><td class=\"entry\"><a href=\"/asc/325/40/#325-40-55-2\" class=\"xref\">325-40-55-2 through 55-25</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Accounting Standards Update No. 2009-16</a></td><td class=\"entry\">12/23/2009</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\nBeneficial Interests | Amended | Accounting Standards Update No. 2009-16 | 12/23/2009 |\n…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6f5b419b5487ea51d7e54b7a2984a5baed637ffb5289eaf3b656393046984ee3","downloaded_from":"2026-09-09T23:44:27.827Z","last_downloaded_at":"2026-09-09T23:44:27.827Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481601","source_sha256":"798f088346a2e2dc323858af434ed718d842635e393044cf44459fe8b67a0369"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cc4cc28662d0e6310dc7146fa6b641d0da2517df495a1ec082d61e83bb8f8445","downloaded_from":"2026-09-09T23:44:27.827Z","last_downloaded_at":"2026-09-09T23:44:27.827Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481601","source_sha256":"798f088346a2e2dc323858af434ed718d842635e393044cf44459fe8b67a0369"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:25713605f76da2cde993f46589e474fd7a3d2eabc58daefbf00c9822afa4faa9","downloaded_from":"2026-09-09T23:44:27.827Z","last_downloaded_at":"2026-09-09T23:44:27.827Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481601","source_sha256":"798f088346a2e2dc323858af434ed718d842635e393044cf44459fe8b67a0369"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"325-40-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4A4C36A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Subtopic addresses accounting for a transferor's interests in securitized transactions accounted for as sales (see Topic <a altsource=\"GUID-E53370AF-0D20-4F9A-BBE9-2A4A9016D32F.ditamap\" class=\"ditamap\">860</a>) and purchased <a href=\"/glossary/b/#beneficial-interests\" class=\"term\" title=\"Rights to receive all or portions of specified cash inflows received by a trust or other entity, including, but not limited to, all of the following: Senior and subordinated shares of interest, principal, or other cash inflows to be passed-through or paid-through Premiums due to guarantors Commercial paper obligations Residual interests, whether in the form of debt or equity.\"><span>beneficial interests</span></a>. Collectively, these interests are referred to in this Subtopic as beneficial interests. </span></span></div></div>","snippet":"This Subtopic addresses accounting for a transferor's interests in securitized transactions accounted for as sales (see Topic 860) and purchased beneficial interests. Collectively, these interests are referred to in this…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c63f23d3dcaa7947dacb758b217e032d21329728470ae9e43ff73393776ade60","downloaded_from":"2026-09-09T23:44:30.336Z","last_downloaded_at":"2026-09-09T23:44:30.336Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481571","source_sha256":"e18e3174744a6350c0e58b2648b5f2f83f8fe28efac57a5c51de824b6d41f976"}},{"citation":"325-40-05-2","para":"05-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4A4C68D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Changes in cash flows expected to be collected might arise from prepayments, from credit concerns, from changes in interest rates, or for other reasons. </span></span></div></div>","snippet":"Changes in cash flows expected to be collected might arise from prepayments, from credit concerns, from changes in interest rates, or for other reasons.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:de108eb5868dd66ee4a74566070ae6378a3e577b1a3ba32f0f57bccb0a25f86e","downloaded_from":"2026-09-09T23:44:30.336Z","last_downloaded_at":"2026-09-09T23:44:30.336Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481571","source_sha256":"e18e3174744a6350c0e58b2648b5f2f83f8fe28efac57a5c51de824b6d41f976"}},{"citation":"325-40-05-3","para":"05-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/page-1833002/\" class=\"xref\">Paragraph not used</a>.</div></div>","snippet":"Paragraph not used.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5c215ccb4afa96a7ecc32537ba8ed9b8b8295830ac6e432f7cd5067f845dd0ad","downloaded_from":"2026-09-09T23:44:30.336Z","last_downloaded_at":"2026-09-09T23:44:30.336Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481571","source_sha256":"e18e3174744a6350c0e58b2648b5f2f83f8fe28efac57a5c51de824b6d41f976"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e78808b8a63f4949a31bbb234cf5982737cec736338c8f1595aeeae16db9d74f","downloaded_from":"2026-09-09T23:44:30.336Z","last_downloaded_at":"2026-09-09T23:44:30.336Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481571","source_sha256":"e18e3174744a6350c0e58b2648b5f2f83f8fe28efac57a5c51de824b6d41f976"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8025cbf047785469f09131afa8a7ab4968eb70cfdad16f57afdc693338512982","downloaded_from":"2026-09-09T23:44:30.336Z","last_downloaded_at":"2026-09-09T23:44:30.336Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481571","source_sha256":"e18e3174744a6350c0e58b2648b5f2f83f8fe28efac57a5c51de824b6d41f976"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Entities","paragraphs":[{"citation":"325-40-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The guidance in this Subtopic applies to all entities.</div></div>","snippet":"The guidance in this Subtopic applies to all entities.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f6d6545d5f2508f25518500713e8901d558e640a6b592767e439de5c00d214b2","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:efc40fec1839026edbca13eee48a2f201137c038e3fbdfe4964d56fa67399685","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}},{"block":null,"heading":"Instruments","paragraphs":[{"citation":"325-40-15-2","para":"15-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4CDA743-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The guidance in this Subtopic applies to a transferor's interests in securitization transactions that are accounted for as sales under Topic <a altsource=\"GUID-E53370AF-0D20-4F9A-BBE9-2A4A9016D32F.ditamap\" class=\"ditamap\">860</a> and purchased <a href=\"/glossary/b/#beneficial-interests\" class=\"term\" title=\"Rights to receive all or portions of specified cash inflows received by a trust or other entity, including, but not limited to, all of the following: Senior and subordinated shares of interest, principal, or other cash inflows to be passed-through or paid-through Premiums due to guarantors Commercial paper obligations Residual interests, whether in the form of debt or equity.\"><span>beneficial interests</span></a> in securitized financial assets. </span></span></div></div>","snippet":"The guidance in this Subtopic applies to a transferor's interests in securitization transactions that are accounted for as sales under Topic 860 and purchased beneficial interests in securitized financial assets.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cb4a98600e989d05c8942e8ccb051c43896ae33c640bf368860f3412e2e48890","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}},{"citation":"325-40-15-3","para":"15-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4CDB394-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The guidance in this Subtopic applies to beneficial interests that have all of the following characteristics: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_B4CDB49D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Are either debt securities under Subtopic <a altsource=\"GUID-4811AE12-D9DA-4108-91FD-E9559A6B63BE.ditamap\" class=\"ditamap\">320-10</a> or required to be accounted for like debt securities under that Subtopic pursuant to paragraph <a href=\"/asc/860/20/#860-20-35-2\" class=\"xref\">860-20-35-2</a>. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_B4CDB5A7-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Involve securitized financial assets that have contractual cash flows (for example, loans, receivables, debt securities, and guaranteed lease residuals, among other items). </span></span><span class=\"sfragment\" id=\"sfr_B4CDB693-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Thus, the guidance in this Subtopic does not apply to securitized financial assets that do not involve contractual cash flows (for example, common stock equity securities, among other items). </span></span><span class=\"sfragment\" id=\"sfr_B4CDB780-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/320/10/#320-10-35-38\" class=\"xref\">320-10-35-38</a> for guidance on beneficial interests involving securitized financial assets that do not involve contractual cash flows. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_B4CDB90B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Do not result in consolidation of the entity issuing the beneficial interest by the holder of the beneficial interests. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">d</span><div class=\"p\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Subparagraph superseded by Accounting Standards Update No. 2016-13</a>. </div></li><li class=\"li-norm\"><span class=\"linum\">e</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_B4CDB9FC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Are not beneficial interests in securitized financial assets that have both of the following characteristics: </span></span></div><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">1</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_B4CDBAEB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Are of high credit quality (for example, guaranteed by the U.S. government, its agencies, or other creditworthy guarantors, and loans or securities sufficiently collateralized to ensure that the possibility of credit loss is remote) </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">2</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_B4CDBBD4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Cannot contractually be prepaid or otherwise settled in such a way that the holder would not recover substantially all of its recorded investment. </span></span></div></li></ol></li></ol></div></div>","snippet":"The guidance in this Subtopic applies to beneficial interests that have all of the following characteristics:\n(a) Are either debt securities under Subtopic 320-10 or required to be accounted for like debt securities unde…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8d33a9eb5fcaaa0b0759ac0e49d6116b87b40ac072b7d2be60dc88e2f11857c5","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}},{"citation":"325-40-15-4","para":"15-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4CDBDEB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For guidance on recognition of interest income on beneficial interests that have both of the characteristics described in (e) in the preceding paragraph, see Subtopic <a altsource=\"GUID-4811AE12-D9DA-4108-91FD-E9559A6B63BE.ditamap\" class=\"ditamap\">320-10</a>. For guidance on determining the allowance for credit losses on beneficial interests that have both of the characteristics described in (e) in the preceding paragraph (other than trading debt securities), see Topic <a altsource=\"GUID-625589DC-9B5F-442F-8EE2-DE0905FB7CE6.ditamap\" class=\"ditamap\">326</a> on measurement of credit losses. </span></span></div></div>","snippet":"For guidance on recognition of interest income on beneficial interests that have both of the characteristics described in (e) in the preceding paragraph, see Subtopic 320-10. For guidance on determining the allowance for…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0eb515d51923fa4b814011aea67575382f51f33187991af5718589177bd61f07","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}},{"citation":"325-40-15-5","para":"15-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4CDBF3C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A beneficial interest in securitized financial assets that is in equity form may meet the definition of a <a href=\"/glossary/d/#debt-security\" class=\"term\" title=\"Any security representing a creditor relationship with an entity. The term debt security also includes all of the following: Preferred stock that by its terms either must be redeemed by the issuing entity or is redeemable at the option of the investor A collateralized mortgage obligation (or other instrument) that is issued in equity form but is required to be accounted for as a nonequity instrument regardless of how that instrument is classified (that is, whether equity or debt) in the issuer's statement of financial position U.S. Treasury securities U.S. government agency securities Municipal securities Corporate bonds Convertible debt Commercial paper All securitized debt instruments, such as collateralized mortgage obligations and real estate mortgage investment conduits Interest-only and principal-only strips. The term debt security excludes all of the following: Option contracts Financial futures contracts Forward contracts Lease contracts Receivables that do not meet the definition of security and, so, are not debt securities, for example: Trade accounts receivable arising from sales on credit by industrial or commercial entities Loans receivable arising from consumer, commercial, and real estate lending activities of financial institutions.\"><span>debt security</span></a>. </span></span><span class=\"sfragment\" id=\"sfr_B4CDC064-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For example, some beneficial interests issued in the form of equity represent solely a right to receive a stream of future cash flows to be collected under preset terms and conditions (that is, a creditor relationship), while others, according to the terms of the special-purpose entity, must be redeemed by the issuing entity or must be redeemable at the option of the investor. </span></span><span class=\"sfragment\" id=\"sfr_B4CDC16D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Consequently, those beneficial interests would be within the scope of both this Subtopic and Topic <a altsource=\"GUID-A9CFFB3B-63C1-4D60-AEE3-DA1A278C07C2.ditamap\" class=\"ditamap\">320</a> because they are required to be accounted for as debt securities under that Topic.</span></span></div></div>","snippet":"A beneficial interest in securitized financial assets that is in equity form may meet the definition of a debt security. For example, some beneficial interests issued in the form of equity represent solely a right to rec…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2370e314d24aef6a4211b1781e3047a2166694e7747ae17ba9a6e15ffa28d989","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}},{"citation":"325-40-15-6","para":"15-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4CDC263-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Beneficial interests issued in the form of equity that do not meet the criteria in the preceding paragraph shall be accounted for under the applicable provisions of Subtopic <a altsource=\"GUID-364345EC-08A6-4C30-85E5-9C78C181792D.ditamap\" class=\"ditamap\">323-10</a>, the applicable consolidation guidance (see, for example, Subtopic <a altsource=\"GUID-9B4F57B8-8A6A-4E11-A70A-756C69E6D16B.ditamap\" class=\"ditamap\">810-10</a>), or Subtopic <a altsource=\"GUID-5BED207F-EC16-4957-89D8-E6E66E966B07.ditamap\" class=\"ditamap\">321-10</a>. </span></span></div></div>","snippet":"Beneficial interests issued in the form of equity that do not meet the criteria in the preceding paragraph shall be accounted for under the applicable provisions of Subtopic 323-10, the applicable consolidation guidance …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:65a1df9542d62fb129b413f9c67f3fb27bba83d2e954a0d3a7a02d0b1437aa43","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}},{"citation":"325-40-15-7","para":"15-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4CDC34B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For income recognition purposes, beneficial interests classified as trading are included in the scope of this Subtopic because it is practice for certain industries (such as banks and investment companies) to report interest income as a separate item in their income statements, even though the investments are accounted for at fair value. </span></span></div></div>","snippet":"For income recognition purposes, beneficial interests classified as trading are included in the scope of this Subtopic because it is practice for certain industries (such as banks and investment companies) to report inte…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b6e5702a2a2996ba8e9631615385573d998a6f7fc217cd1afdb3c6507fb2f00f","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}},{"citation":"325-40-15-8","para":"15-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4CDC43F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Included in the scope of this Subtopic are the host contract portion of a hybrid beneficial interest that requires separate accounting for an embedded derivative under paragraphs <a href=\"/asc/815/15/#815-15-25-1\" class=\"xref\">815-15-25-1</a>; <div class=\"xref-range displayInline\"><a href=\"/asc/815/15/#815-15-25-11\" class=\"xref\">815-15-25-11 through 25-14</a></div>; and <div class=\"xref-range displayInline\"><a href=\"/asc/815/15/#815-15-25-26\" class=\"xref\">815-15-25-26 through 25-29</a></div> when the host contract otherwise meets the scope of this Subtopic. </span></span><span class=\"sfragment\" id=\"sfr_B4CDC516-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The issue of when and how a hybrid contract is to be separated into its component parts is an implementation issue of Topic <a altsource=\"GUID-128369CC-8E3A-4A7E-8F25-33E42B0761E4.ditamap\" class=\"ditamap\">815</a> and, therefore, not within the scope of this Subtopic. </span></span></div></div>","snippet":"Included in the scope of this Subtopic are the host contract portion of a hybrid beneficial interest that requires separate accounting for an embedded derivative under paragraphs 815-15-25-1; 815-15-25-11 through 25-14; …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7ef1a6d0605754ab910ded2c6b1befd25a3b2132a3e14802182167cabebdec25","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}},{"citation":"325-40-15-9","para":"15-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4CDC5E5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The guidance in this Subtopic does not apply to hybrid beneficial interests measured at fair value pursuant to paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/815/15/#815-15-25-4\" class=\"xref\">815-15-25-4 through 25-6</a></div> for which the transferor does not report interest income as a separate item in its income statements. </span></span></div></div>","snippet":"The guidance in this Subtopic does not apply to hybrid beneficial interests measured at fair value pursuant to paragraphs 815-15-25-4 through 25-6 for which the transferor does not report interest income as a separate it…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:633c6c362bb02f84ce0778bcb62c24f925b268f1b7ab65b8f252c5e9f67bc051","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5b923f1b4de88bb116432f6e85109209bb247178bcd2ebe39f4eaf5366d063f2","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e47dd3909fbc701038203d69548c11a4abfa68209bbe26dfa54e073956c208f5","downloaded_from":"2026-09-09T23:44:33.248Z","last_downloaded_at":"2026-09-09T23:44:33.248Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481541","source_sha256":"1320329c6bc6e425d0190bec3996b54caba249b369030c4eb136cccdd8a65221"}},{"number":"25","label":"25 Recognition","anchor":"25-recognition","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"325-40-25-1","para":"25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4EF9723-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The carrying amount of the <a href=\"/glossary/b/#beneficial-interests\" class=\"term\" title=\"Rights to receive all or portions of specified cash inflows received by a trust or other entity, including, but not limited to, all of the following: Senior and subordinated shares of interest, principal, or other cash inflows to be passed-through or paid-through Premiums due to guarantors Commercial paper obligations Residual interests, whether in the form of debt or equity.\"><span>beneficial interest</span></a> used for purposes of measuring interest income shall be adjusted based on the application of the accounting model described in this Subtopic. </span></span></div></div>","snippet":"The carrying amount of the beneficial interest used for purposes of measuring interest income shall be adjusted based on the application of the accounting model described in this Subtopic.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c3b5fcbcb9438957e416ca703f6bf31fd0ba3b12a5b96075fd668b8a7149d8bc","downloaded_from":"2026-09-09T23:44:39.151Z","last_downloaded_at":"2026-09-09T23:44:39.151Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481487","source_sha256":"8767fb694f6a22ae9c1405fb106c3047e471426c4dfe22cd3d644398fd66f20f"}},{"citation":"325-40-25-2","para":"25-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4EF9A88-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The difference between the carrying amount and the fair value of a beneficial interest classified as a trading debt security shall be recorded through earnings as a gain or a loss. </span></span></div></div>","snippet":"The difference between the carrying amount and the fair value of a beneficial interest classified as a trading debt security shall be recorded through earnings as a gain or a loss.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:49e7a0be0c995b90f145ea5977b4b94bf9b57195e5c4609f865b38e29b660dc0","downloaded_from":"2026-09-09T23:44:39.151Z","last_downloaded_at":"2026-09-09T23:44:39.151Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481487","source_sha256":"8767fb694f6a22ae9c1405fb106c3047e471426c4dfe22cd3d644398fd66f20f"}},{"citation":"325-40-25-3","para":"25-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B4EF9B8D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraph <a href=\"/asc/325/40/#325-40-35-1\" class=\"xref\">325-40-35-1</a> addresses how the holder shall recognize </span></span><span class=\"sfragment\" id=\"sfr_B4EF9C88-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">accretable yield. </span></span></div></div>","snippet":"Paragraph 325-40-35-1 addresses how the holder shall recognize accretable yield.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7dc6c2a49b07969248f709b2dd7a37ce07849402914526b2ddbbaa51f88a1ee3","downloaded_from":"2026-09-09T23:44:39.151Z","last_downloaded_at":"2026-09-09T23:44:39.151Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481487","source_sha256":"8767fb694f6a22ae9c1405fb106c3047e471426c4dfe22cd3d644398fd66f20f"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:438ebd0bd37571e8619394d254b1e713c37d1d11a98014002e125a4f9f079d6e","downloaded_from":"2026-09-09T23:44:39.151Z","last_downloaded_at":"2026-09-09T23:44:39.151Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481487","source_sha256":"8767fb694f6a22ae9c1405fb106c3047e471426c4dfe22cd3d644398fd66f20f"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:169cff9af67a4a2486f25e65e97f9a20e343cedef38709775f7eabd4d32b82bf","downloaded_from":"2026-09-09T23:44:39.151Z","last_downloaded_at":"2026-09-09T23:44:39.151Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481487","source_sha256":"8767fb694f6a22ae9c1405fb106c3047e471426c4dfe22cd3d644398fd66f20f"}},{"number":"30","label":"30 Initial Measurement","anchor":"30-initial-measurement","is_sec":false,"groups":[{"block":null,"heading":"Initial Investment","paragraphs":[{"citation":"325-40-30-1","para":"30-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B50B8094-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the holder of the <a href=\"/glossary/b/#beneficial-interests\" class=\"term\" title=\"Rights to receive all or portions of specified cash inflows received by a trust or other entity, including, but not limited to, all of the following: Senior and subordinated shares of interest, principal, or other cash inflows to be passed-through or paid-through Premiums due to guarantors Commercial paper obligations Residual interests, whether in the form of debt or equity.\"><span>beneficial interest</span></a> is the transferor, the initial investment would be the fair value of the beneficial interest as of the date of transfer, as required by paragraph <a href=\"/asc/860/20/#860-20-30-1\" class=\"xref\">860-20-30-1</a>. </span></span></div></div>","snippet":"If the holder of the beneficial interest is the transferor, the initial investment would be the fair value of the beneficial interest as of the date of transfer, as required by paragraph 860-20-30-1.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5efb8678ad9ec802e1d6fb0020f99e44f075fda8278e9edbb1b9cd13b547db26","downloaded_from":"2026-09-09T23:44:41.675Z","last_downloaded_at":"2026-09-09T23:44:41.675Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481458","source_sha256":"dfab4021a9c132bc28f6876a2f3a5b087cc57b31f2e41d03f71a6e8bc55b4b79"}},{"citation":"325-40-30-1A","para":"30-1A","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B50B8206-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity shall apply the initial measurement guidance for <a href=\"/glossary/p/#purchased-financial-assets-with-credit-deterioration\" class=\"term\" title=\"Acquired individual financial assets (or acquired groups of financial assets with similar risk characteristics) that as of the date of acquisition have experienced a more-than-insignificant deterioration in credit quality since origination, as determined by an acquirer's assessment. See paragraph 326-20-55-5 for more information on the meaning of similar risk characteristics for assets measured on an amortized cost basis.\"><span>purchased financial assets with credit deterioration</span></a> in Subtopic <a altsource=\"GUID-B92DF57A-D31A-4A52-999E-127107B41EED.ditamap\" class=\"ditamap\">326-20</a> to a beneficial interest classified as held-to-maturity and in Subtopic <a altsource=\"GUID-211B0E0E-18E4-4F8C-88E5-6DB85C7C3515.ditamap\" class=\"ditamap\">326-30</a> to a beneficial interest classified as available for sale, if it meets either of the following conditions: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_B50B834A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">There is a significant difference between contractual cash flows and expected cash flows at the date of recognition. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_B50B846E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The beneficial interests meet the definition of purchased financial assets with credit deterioration. </span></span></div></li></ol></div></div>","snippet":"An entity shall apply the initial measurement guidance for purchased financial assets with credit deterioration in Subtopic 326-20 to a beneficial interest classified as held-to-maturity and in Subtopic 326-30 to a benef…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e1b11e2e98370156e2e7d5a1f06716eb62dc1eb3b6bed33ecb10709dade6db9c","downloaded_from":"2026-09-09T23:44:41.675Z","last_downloaded_at":"2026-09-09T23:44:41.675Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481458","source_sha256":"dfab4021a9c132bc28f6876a2f3a5b087cc57b31f2e41d03f71a6e8bc55b4b79"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d78e6f14ff521a7b8c053ee4fa621f644927cace8619bfbf78f7881124fe7388","downloaded_from":"2026-09-09T23:44:41.675Z","last_downloaded_at":"2026-09-09T23:44:41.675Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481458","source_sha256":"dfab4021a9c132bc28f6876a2f3a5b087cc57b31f2e41d03f71a6e8bc55b4b79"}},{"block":null,"heading":"Accretable Yield","paragraphs":[{"citation":"325-40-30-2","para":"30-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B50B91E7-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For beneficial interests that do not apply the accounting for purchased financial assets with credit deterioration, </span></span><span class=\"sfragment\" id=\"sfr_B50B9346-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">the holder shall measure accretable yield initially as the excess of <em class=\"ph i\">all cash flows expected to be collected</em> attributable to the beneficial interest </span></span><span class=\"sfragment\" id=\"sfr_B50B94C4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> estimated at the acquisition-transaction date (the transaction date) </span></span><span class=\"sfragment\" id=\"sfr_B50B965E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">over the initial investment. </span></span><span class=\"sfragment\" id=\"sfr_B50B9792-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For beneficial interests that apply the accounting for purchased financial assets with credit deterioration, the holder shall measure accretable yield initially as the excess of all contractual cash flows attributable to the beneficial interest at the acquisition-transaction date (the transaction date) over the amortized cost basis (the purchase price plus the initial allowance for credit losses). </span></span></div></div>","snippet":"For beneficial interests that do not apply the accounting for purchased financial assets with credit deterioration, the holder shall measure accretable yield initially as the excess of all cash flows expected to be colle…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c2cad393c129272cbb2623c5ccc2b06e9d9b5b5feac48e32a54fe54d8aa8eff0","downloaded_from":"2026-09-09T23:44:41.675Z","last_downloaded_at":"2026-09-09T23:44:41.675Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481458","source_sha256":"dfab4021a9c132bc28f6876a2f3a5b087cc57b31f2e41d03f71a6e8bc55b4b79"}},{"citation":"325-40-30-3","para":"30-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B50B98FC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">At the transaction date, <em class=\"ph i\">all cash flows expected to be collected</em> means the holder's estimate of the amount and timing of estimated future principal and interest cash flows used in determining the purchase price or the holder's fair value determination for purposes of determining a gain or loss under Topic <a altsource=\"GUID-E53370AF-0D20-4F9A-BBE9-2A4A9016D32F.ditamap\" class=\"ditamap\">860</a>. </span></span></div></div>","snippet":"At the transaction date, all cash flows expected to be collected means the holder's estimate of the amount and timing of estimated future principal and interest cash flows used in determining the purchase price or the ho…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6f3bcbe0a0da6eacd1dd11ac861cd70945cad4745854a6eef2ffe17c65b8d94e","downloaded_from":"2026-09-09T23:44:41.675Z","last_downloaded_at":"2026-09-09T23:44:41.675Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481458","source_sha256":"dfab4021a9c132bc28f6876a2f3a5b087cc57b31f2e41d03f71a6e8bc55b4b79"}},{"citation":"325-40-30-4","para":"30-4","html":"<div class=\"asc-body\"><div class=\"norm-text\">See paragraph <a href=\"/asc/325/40/#325-40-55-1\" class=\"xref\">325-40-55-1</a> for implementation guidance.</div></div>","snippet":"See paragraph 325-40-55-1 for implementation guidance.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7311e28f8e2d30d2e4391b3c07a5b2e42361a0f5935021f8fd14ef290c2514c1","downloaded_from":"2026-09-09T23:44:41.675Z","last_downloaded_at":"2026-09-09T23:44:41.675Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481458","source_sha256":"dfab4021a9c132bc28f6876a2f3a5b087cc57b31f2e41d03f71a6e8bc55b4b79"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4321fabeebf92f1102d193ece816b860daa7f2e63cb46b499687bfc93f684d7b","downloaded_from":"2026-09-09T23:44:41.675Z","last_downloaded_at":"2026-09-09T23:44:41.675Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481458","source_sha256":"dfab4021a9c132bc28f6876a2f3a5b087cc57b31f2e41d03f71a6e8bc55b4b79"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d1d25e137cf37f192db33829afba96a05b4d37b1cf48345ceae90f2854258b35","downloaded_from":"2026-09-09T23:44:41.675Z","last_downloaded_at":"2026-09-09T23:44:41.675Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481458","source_sha256":"dfab4021a9c132bc28f6876a2f3a5b087cc57b31f2e41d03f71a6e8bc55b4b79"}},{"number":"35","label":"35 Subsequent Measurement","anchor":"35-subsequent-measurement","is_sec":false,"groups":[{"block":null,"heading":"Accretable Yield","paragraphs":[{"citation":"325-40-35-1","para":"35-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B55416AB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The holder shall recognize accretable yield </span></span><span class=\"sfragment\" id=\"sfr_B554185F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">as interest income over the life of the <a href=\"/glossary/b/#beneficial-interests\" class=\"term\" title=\"Rights to receive all or portions of specified cash inflows received by a trust or other entity, including, but not limited to, all of the following: Senior and subordinated shares of interest, principal, or other cash inflows to be passed-through or paid-through Premiums due to guarantors Commercial paper obligations Residual interests, whether in the form of debt or equity.\"><span>beneficial interest</span></a> using the effective yield method. </span></span><span class=\"sfragment\" id=\"sfr_B554197C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The holder of a beneficial interest shall continue to update, over the life of the beneficial interest, the expectation of cash flows to be collected. </span></span></div><div class=\"div pending-text\" id=\"d3e44199-111616__GUID-0058668A-7C5C-45C1-9D07-92809485A6D2\"><div class=\"div date-effective\"><span class=\"transition-header\">Transition date:</span><span class=\"p-alphabet\">(P) December 16, 2026; (N) December 16, 2026</span><span class=\"transition-header pipe-separator\">Transition guidance:</span></div><a href=\"/asc/105/10/#105-10-65-10\" class=\"xref\">105-10-65-10</a><span class=\"sfragment\" id=\"GUID-CC9AE248-A3AE-4A38-B854-B9C71B5BFF47\"><span class=\"sfragment-source\">The holder shall recognize accretable yield </span></span><span class=\"sfragment\" id=\"GUID-3B3A1291-3E86-49BA-8CCA-A303711AD5F4\"><span class=\"sfragment-source\">as interest income over the life of the <a href=\"/glossary/b/#beneficial-interests\" class=\"term\" title=\"Rights to receive all or portions of specified cash inflows received by a trust or other entity, including, but not limited to, all of the following: Senior and subordinated shares of interest, principal, or other cash inflows to be passed-through or paid-through Premiums due to guarantors Commercial paper obligations Residual interests, whether in the form of debt or equity.\"><span>beneficial interest</span></a> using the effective yield method. </span></span><span class=\"sfragment\" id=\"GUID-854FB450-29B4-4CDC-82A7-BAD4B6825AD5\"><span class=\"sfragment-source\">Under the effective yield method, the current yield is applied to the amount determined as the initial investment (or initial amortized cost basis for beneficial interests that apply the accounting for <a href=\"/glossary/p/#purchased-financial-assets-with-credit-deterioration\" class=\"term\" title=\"Acquired individual financial assets (or acquired groups of financial assets with similar risk characteristics) that as of the date of acquisition have experienced a more-than-insignificant deterioration in credit quality since origination, as determined by an acquirer's assessment. See paragraph 326-20-55-5 for more information on the meaning of similar risk characteristics for assets measured on an amortized cost basis.\"><span>purchased financial assets with credit deterioration</span></a>) minus cash received to date minus writeoff of amortized cost basis plus the yield accreted to date. </span></span><span class=\"sfragment\" id=\"GUID-41F50301-7E36-400D-9DDC-6DDC937EE227\"><span class=\"sfragment-source\">The holder of a beneficial interest shall continue to update, over the life of the beneficial interest, the expectation of cash flows to be collected. </span></span></div></div>","snippet":"The holder shall recognize accretable yield as interest income over the life of the beneficial interest using the effective yield method. The holder of a beneficial interest shall continue to update, over the life of the…","pending":true,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e5ce9ff29d16741f9b2869e21b9ce58127e0624036977b330b605851549280aa","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-2","para":"35-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2016-13</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2016-13.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8c50fcc2607f5d0ff2accf8b5a26b2d4cc56cd0f1679d00efa57017cc02fdd09","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-3","para":"35-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5541E65-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">After the transaction date, cash flows expected to be collected are defined as the holder's estimate of the amount and timing of estimated principal and interest cash flows based on the holder's best estimate of current conditions and reasonable and supportable forecasts. </span></span></div></div>","snippet":"After the transaction date, cash flows expected to be collected are defined as the holder's estimate of the amount and timing of estimated principal and interest cash flows based on the holder's best estimate of current …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d9bd270a618de73349858e1f4a445b8d57e05f8af41542a862a3b31a48a3056e","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-4","para":"35-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5542D3C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If upon evaluation of a held-to-maturity classified beneficial interest there is a favorable (or an adverse) change in cash flows expected to be collected from the cash flows previously projected, the investor shall first apply the guidance in Subtopic <a altsource=\"GUID-B92DF57A-D31A-4A52-999E-127107B41EED.ditamap\" class=\"ditamap\">326-20</a> on financial instruments measured at amortized cost to account for that favorable (or adverse) change. After application of the guidance in Subtopic <a altsource=\"GUID-B92DF57A-D31A-4A52-999E-127107B41EED.ditamap\" class=\"ditamap\">326-20</a>, if the amount of the favorable (or adverse) change in cash flows expected to be collected from the cash flows previously projected is not reflected (either as an increase or as a decrease) in the allowance for credit losses in accordance with Subtopic <a altsource=\"GUID-B92DF57A-D31A-4A52-999E-127107B41EED.ditamap\" class=\"ditamap\">326-20</a>, the investor shall recalculate the amount of accretable yield for the beneficial interest on the date of evaluation as the excess of cash flows expected to be collected over the beneficial interest's reference amount. </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Subparagraph superseded by Accounting Standards Update No. 2016-13</a>. </div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Subparagraph superseded by Accounting Standards Update No. 2016-13</a>. </div></li></ol></div><div class=\"div pending-text\" id=\"d3e44199-111616__GUID-917CD44A-5C68-4096-BA42-C6ADFB1E6E6F\"><div class=\"div date-effective\"><span class=\"transition-header\">Transition date:</span><span class=\"p-alphabet\">(P) December 16, 2026; (N) December 16, 2026</span><span class=\"transition-header pipe-separator\">Transition guidance:</span></div><a href=\"/asc/105/10/#105-10-65-10\" class=\"xref\">105-10-65-10</a><span class=\"sfragment\" id=\"GUID-263AD745-735D-4714-8125-38BE314A1D15\"><span class=\"sfragment-source\">If upon evaluation of a held-to-maturity classified beneficial interest there is a favorable (or an adverse) change in cash flows expected to be collected from the cash flows previously projected, the investor shall first apply the guidance in Subtopic <a altsource=\"GUID-B92DF57A-D31A-4A52-999E-127107B41EED.ditamap\" class=\"ditamap\">326-20</a> on financial instruments measured at amortized cost to account for that favorable (or adverse) change. After application of the guidance in Subtopic <a altsource=\"GUID-B92DF57A-D31A-4A52-999E-127107B41EED.ditamap\" class=\"ditamap\">326-20</a>, if the amount of the favorable (or adverse) change in cash flows expected to be collected from the cash flows previously projected is not reflected (either as an increase or as a decrease) in the allowance for credit losses in accordance with Subtopic <a altsource=\"GUID-B92DF57A-D31A-4A52-999E-127107B41EED.ditamap\" class=\"ditamap\">326-20</a>, the investor shall recalculate the amount of accretable yield for the beneficial interest on the date of evaluation as the excess of cash flows expected to be collected over the beneficial interest's reference amount. </span></span><span class=\"sfragment\" id=\"GUID-47EAA2D8-26A0-4B7E-8CB3-898C8A08F322\"><span class=\"sfragment-source\">The investor shall recalculate the current yield on the date of the evaluation as the rate that equates the cash flows expected to be collected to the beneficial interest’s reference amount.</span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Subparagraph superseded by Accounting Standards Update No. 2016-13</a>. </div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Subparagraph superseded by Accounting Standards Update No. 2016-13</a>. </div></li></ol></div></div>","snippet":"If upon evaluation of a held-to-maturity classified beneficial interest there is a favorable (or an adverse) change in cash flows expected to be collected from the cash flows previously projected, the investor shall firs…","pending":true,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c7286eda879804faef795db5f44e502660f24f71b7e556c21bd043ef14c93fdd","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-4A","para":"35-4A","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5542E42-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If upon evaluation of an available-for-sale classified beneficial interest there is a favorable (or an adverse) change in cash flows expected to be collected from the cash flows previously projected, the investor shall apply the guidance in Subtopic <a altsource=\"GUID-211B0E0E-18E4-4F8C-88E5-6DB85C7C3515.ditamap\" class=\"ditamap\">326-30</a> on measuring credit losses on available-for-sale debt securities to account for that favorable (or adverse) change. After application of the guidance in Subtopic <a altsource=\"GUID-211B0E0E-18E4-4F8C-88E5-6DB85C7C3515.ditamap\" class=\"ditamap\">326-30</a>, if the amount of the favorable (or adverse) change in cash flows expected to be collected from the cash flows previously projected is not reflected (either as an increase or as a decrease) in the allowance for credit losses in accordance with Subtopic <a altsource=\"GUID-211B0E0E-18E4-4F8C-88E5-6DB85C7C3515.ditamap\" class=\"ditamap\">326-30</a>, the investor shall recalculate the amount of accretable yield for the beneficial interest on the date of evaluation as the excess of cash flows expected to be collected over the beneficial interest's reference amount. </span></span></div><div class=\"div pending-text\" id=\"d3e44199-111616__GUID-0D20ADF7-95CB-4086-A213-F508B6435929\"><div class=\"div date-effective\"><span class=\"transition-header\">Transition date:</span><span class=\"p-alphabet\">(P) December 16, 2026; (N) December 16, 2026</span><span class=\"transition-header pipe-separator\">Transition guidance:</span></div><a href=\"/asc/105/10/#105-10-65-10\" class=\"xref\">105-10-65-10</a><span class=\"sfragment\" id=\"GUID-BE2E20BD-6496-47B2-80EF-B7E1199B0A29\"><span class=\"sfragment-source\">If upon evaluation of an available-for-sale classified beneficial interest there is a favorable (or an adverse) change in cash flows expected to be collected from the cash flows previously projected, the investor shall apply the guidance in Subtopic <a altsource=\"GUID-211B0E0E-18E4-4F8C-88E5-6DB85C7C3515.ditamap\" class=\"ditamap\">326-30</a> on measuring credit losses on available-for-sale debt securities to account for that favorable (or adverse) change. After application of the guidance in Subtopic <a altsource=\"GUID-211B0E0E-18E4-4F8C-88E5-6DB85C7C3515.ditamap\" class=\"ditamap\">326-30</a>, if the amount of the favorable (or adverse) change in cash flows expected to be collected from the cash flows previously projected is not reflected (either as an increase or as a decrease) in the allowance for credit losses in accordance with Subtopic <a altsource=\"GUID-211B0E0E-18E4-4F8C-88E5-6DB85C7C3515.ditamap\" class=\"ditamap\">326-30</a>, the investor shall recalculate the amount of accretable yield for the beneficial interest on the date of evaluation as the excess of cash flows expected to be collected over the beneficial interest's reference amount. </span></span><span class=\"sfragment\" id=\"GUID-AB937EDA-6BB7-4083-BF43-B62911FCFC4F\"><span class=\"sfragment-source\">The investor shall recalculate the current yield on the date of the evaluation as the rate that equates the cash flows expected to be collected to the beneficial interest’s reference amount. </span></span></div></div>","snippet":"If upon evaluation of an available-for-sale classified beneficial interest there is a favorable (or an adverse) change in cash flows expected to be collected from the cash flows previously projected, the investor shall a…","pending":true,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e230f2aff23a8d3d0dfe2e0430f8cdf47abfb960625131780f425ee205ffb1f2","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-4B","para":"35-4B","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5542F42-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The reference amount in paragraphs <a href=\"/asc/325/40/#325-40-35-4\" class=\"xref\">325-40-35-4 through 35-4A</a> is equal to the initial investment (or initial amortized cost basis for beneficial interests that apply the accounting for purchased financial assets with credit deterioration) minus cash received to date minus writeoff of amortized cost basis plus the yield accreted to date. </span></span></div><div class=\"div pending-text\" id=\"d3e44199-111616__GUID-07E4FF1C-4822-41D8-B930-5416315168F8\"><div class=\"div date-effective\"><span class=\"transition-header\">Transition date:</span><span class=\"p-alphabet\">(P) December 16, 2026; (N) December 16, 2026</span><span class=\"transition-header pipe-separator\">Transition guidance:</span></div><a href=\"/asc/105/10/#105-10-65-10\" class=\"xref\">105-10-65-10</a><span class=\"sfragment\" id=\"GUID-E0A2E6FC-AF6B-4141-87A3-BD7E18357198\"><span class=\"sfragment-source\">The reference amount in paragraphs <a href=\"/asc/325/40/#325-40-35-4\" class=\"xref\">325-40-35-4 through 35-4A</a> is equal to the initial investment (or initial amortized cost basis for beneficial interests that apply the accounting for purchased financial assets with credit deterioration) minus cash received to date minus writeoff of amortized cost basis </span></span><span class=\"sfragment\" id=\"GUID-FD7AA97D-F29F-4C29-9F95-ADFE3C3468D1\"><span class=\"sfragment-source\">minus the allowance for credit losses </span></span><span class=\"sfragment\" id=\"GUID-281694D2-9038-487D-ABB6-F2A56CBB2315\"><span class=\"sfragment-source\">plus the yield accreted to date. </span></span></div></div>","snippet":"The reference amount in paragraphs 325-40-35-4 through 35-4A is equal to the initial investment (or initial amortized cost basis for beneficial interests that apply the accounting for purchased financial assets with cred…","pending":true,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:963e7c83b6b4cf48871efa01970b168bf8b9308cae6e1eedbeee9b1f9e4bdc63","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-4C","para":"35-4C","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5543022-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In this Subtopic, a favorable (or an adverse) change in cash flows expected to be collected is considered in the context of both timing and amount of the cash flows expected to be collected. </span></span><span class=\"sfragment\" id=\"sfr_B55430F9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Based on cash flows expected to be collected, interest income may be recognized on a beneficial interest even if the net investment in the beneficial interest is accreted to an amount greater than the amount at which the beneficial interest could be settled if prepaid immediately in its entirety. </span></span><span class=\"sfragment\" id=\"sfr_B55431D2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The adjustment shall be accounted for prospectively as a change in estimate in conformity with Topic <a altsource=\"GUID-2C19D78B-1169-4772-A984-E4C872339081.ditamap\" class=\"ditamap\">250</a>, with the amount of periodic accretion adjusted over the remaining life of the beneficial interest. </span></span></div></div>","snippet":"In this Subtopic, a favorable (or an adverse) change in cash flows expected to be collected is considered in the context of both timing and amount of the cash flows expected to be collected. Based on cash flows expected …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:eed5ea726d9b6ab12ba93278ef1dabb6980d0c4892c3b74e24986c7a4f10b6f9","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-5","para":"35-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B55432D5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Determining whether there has been a favorable (or an adverse) change in cash flows expected to be collected from the cash flows previously projected (taking into consideration both the timing and amount of the cash flows expected to be collected) involves comparing the present value of the remaining cash flows expected to be collected at the initial transaction date (or at the last date previously revised) against the present value of the cash flows expected to be collected at the current financial reporting date. </span></span></div></div>","snippet":"Determining whether there has been a favorable (or an adverse) change in cash flows expected to be collected from the cash flows previously projected (taking into consideration both the timing and amount of the cash flow…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:73c6b25edf7c70e183ca6e28782a09081afae391d0d1a577f7bf996cdee8aaf3","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-6","para":"35-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B55434D3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The cash flows, including the assessment of expected credit losses, shall be discounted at a rate equal to the current yield used to accrete the beneficial interest. </span></span></div></div>","snippet":"The cash flows, including the assessment of expected credit losses, shall be discounted at a rate equal to the current yield used to accrete the beneficial interest.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8628df9b7cae274eba1eac3b2643e9bc2f9024a284db3c535e773fbebdd0f0a8","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:eb4b2e076ec19df9f017b151b48aaaa32fd6cdcd6167b6493f26532a6a0ccb06","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"block":null,"heading":"Credit Losses","paragraphs":[{"citation":"325-40-35-6A","para":"35-6A","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B55435EE-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity shall account for credit losses on beneficial interests classified as held to maturity and available for sale in accordance with Topic <a altsource=\"GUID-625589DC-9B5F-442F-8EE2-DE0905FB7CE6.ditamap\" class=\"ditamap\">326</a>. </span></span></div></div>","snippet":"An entity shall account for credit losses on beneficial interests classified as held to maturity and available for sale in accordance with Topic 326.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:513960943d8aaeddb45d311f474977bdecdde1fc7695862093c9abf8c15d685e","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-7","para":"35-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5543806-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity shall use the present value of expected future cash flows technique to measure credit losses on beneficial interests. </span></span><span class=\"sfragment\" id=\"sfr_B55438F6-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the present value of the original estimate at the initial transaction date (or the last date previously revised) of cash flows expected to be collected is less than the present value of the current estimate of cash flows expected to be collected, the change is considered favorable. </span></span><span class=\"sfragment\" id=\"sfr_B55439DE-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the present value of the original estimate at the initial transaction date (or the last date previously revised) of cash flows expected to be collected is greater than the present value of the current estimate of cash flows expected to be collected, the change is considered adverse.</span></span></div></div>","snippet":"An entity shall use the present value of expected future cash flows technique to measure credit losses on beneficial interests. If the present value of the original estimate at the initial transaction date (or the last d…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c772e6daf811d2d321824c3fdac3ebf2ca622b275d90ee60b97fc66bab62cdcc","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-8","para":"35-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2016-13</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2016-13.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d3342491c94d51e0e1f484b428920d73161e30a4445695e293e86b0a475e9612","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-9","para":"35-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5543D05-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">However, unless the guidance in Topic <a altsource=\"GUID-625589DC-9B5F-442F-8EE2-DE0905FB7CE6.ditamap\" class=\"ditamap\">326</a> indicates that a credit loss has occurred, changes in the interest rate of a plain-vanilla, variable-rate beneficial interest generally should not result in the recognition and measurement of a credit loss (a plain-vanilla, variable-rate beneficial interest does not include those variable-rate beneficial interests with interest rate reset formulas that involve either leverage or an inverse floater). </span></span></div></div>","snippet":"However, unless the guidance in Topic 326 indicates that a credit loss has occurred, changes in the interest rate of a plain-vanilla, variable-rate beneficial interest generally should not result in the recognition and m…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:91c8bd3c745290062011b23ca5bed0ee0085a43b4b157454bda91a3d3dad58b5","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-10","para":"35-10","html":"<div class=\"asc-body\"><div class=\"norm-text\">See paragraph <a href=\"/asc/325/40/#325-40-55-1\" class=\"xref\">325-40-55-1</a> for implementation guidance.</div><div class=\"div pending-text\" id=\"SL82899338-111616__GUID-F53AB794-0CB0-488F-9FAC-24D64D904EA7\"><div class=\"div date-effective\"><span class=\"transition-header\">Transition date:</span><span class=\"p-alphabet\">(P) December 16, 2026; (N) December 16, 2026</span><span class=\"transition-header pipe-separator\">Transition guidance:</span></div><a href=\"/asc/105/10/#105-10-65-10\" class=\"xref\">105-10-65-10</a><a href=\"/updates/asu-2025-12/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2025-12</a>.</div></div>","snippet":"See paragraph 325-40-55-1 for implementation guidance.Transition date:(P) December 16, 2026; (N) December 16, 2026Transition guidance:105-10-65-10Paragraph superseded by Accounting Standards Update No. 2025-12.","pending":true,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2e7c0bd4f61bb4ffe8634e7ba94dd9bcebf55969cfb164d10a1ea672b269bcb6","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-10A","para":"35-10A","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5543F1C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">It is inappropriate to automatically conclude that no credit loss in a security exists because all of the scheduled payments to date have been received. However, it also is inappropriate to automatically conclude that every decline in fair value represents a credit loss. Further analysis and judgment are required to assess whether a decline in fair value is an indicator that the holder will not collect all of the contractual cash flows or cash flows expected to be collected from the security. The more severe the decline in fair value, the more persuasive the evidence that is needed to overcome the premise that the holder will not collect all of the contractual cash flows or cash flows expected to be collected from the issuer of the security.</span></span></div></div>","snippet":"It is inappropriate to automatically conclude that no credit loss in a security exists because all of the scheduled payments to date have been received. However, it also is inappropriate to automatically conclude that ev…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ba3dc30e9c0feddc550437faf425539750bf2a601289946130e5fb554255818e","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-10B","para":"35-10B","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2016-13</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2016-13.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:73d4e0573f00b5a46807b80650541ec9c01538d5acf6754a0b4b95b1dbec54c3","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-10C","para":"35-10C","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/page-1833002/\" class=\"xref\">Paragraph not used</a>.</div></div>","snippet":"Paragraph not used.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0366e096e86a5819481a6567dd35fd238c583bf89b518223938430dc997cabd7","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-10D","para":"35-10D","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/page-1833002/\" class=\"xref\">Paragraph not used</a>.</div></div>","snippet":"Paragraph not used.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b417793e946374913754350f0939e2a9a7d6819ddeb30cafdb7f0b00f0127351","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-11","para":"35-11","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2009-16</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2009-16.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:172252ebb56a2442280fa31b85cb9be3c080573b18bc91533d6ef537a3d8a0e5","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-12","para":"35-12","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2009-16</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2009-16.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:576e97f92227dae334138eaf43492fd2e12090a4d847be746dcf710fdc705f17","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-13","para":"35-13","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2016-13</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2016-13.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3cbbedadcf727aa19b520173fd6832aeecec96a457f8817d92510a56e45047ee","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-14","para":"35-14","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2016-13</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2016-13.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b94d30deaaf397893c8fbeda2ae3b69e5dc3b89e952839997d85183d5b53090a","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"citation":"325-40-35-15","para":"35-15","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2009-16/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2009-16</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2009-16.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0bb3403d39678f80ad5c0c4b41f5bf806fd00378f76e94064ae8c05cbcec1041","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7c39fd3699bbb6b6790dd178a46724135dda41ee0e2b8e8814d556d2e12ce193","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"block":null,"heading":"Nonaccrual Status—Cash Flows Not Reliably Estimable","paragraphs":[{"citation":"325-40-35-16","para":"35-16","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5544316-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Subtopic does not address when a holder of a beneficial interest would place that interest on nonaccrual status or when a holder cannot reliably estimate cash flows. </span></span><span class=\"sfragment\" id=\"sfr_B55443D8-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">However, for beneficial interests placed on nonaccrual status or when a holder cannot reliably estimate cash flows, the cost recovery method shall be used. </span></span></div></div>","snippet":"This Subtopic does not address when a holder of a beneficial interest would place that interest on nonaccrual status or when a holder cannot reliably estimate cash flows. However, for beneficial interests placed on nonac…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ca75abb05565597b6408b474e3f8d0f0cf41f043b1e0c17dcc0818fe706058a7","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d167388ca0305b7618387300eb6928a397c2c68fb2db9f71a2b5d587ae140557","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ce35ce09cc69867126623c1cc4e8fbeef477adeb5c8544a5a32125e2c291eb11","downloaded_from":"2026-09-09T23:44:45.377Z","last_downloaded_at":"2026-09-09T23:44:45.377Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481427","source_sha256":"1af5e2c2dbbb40bd1eb93f19c6d275e071aaa0ea024b5f416cdf74cc80da20cd"}},{"number":"45","label":"45 Other Presentation Matters","anchor":"45-other-presentation-matters","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"325-40-45-1","para":"45-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_B5617DA3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The amount of accretable yield shall not be displayed in the balance sheet. </span></span></div></div>","snippet":"The amount of accretable yield shall not be displayed in the balance sheet.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c44aa3512094723b77447fe6728ad4aec78720b534d4ae6c7ac2645f8db505cf","downloaded_from":"2026-09-09T23:44:49.329Z","last_downloaded_at":"2026-09-09T23:44:49.329Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481398","source_sha256":"a6aa5cb86c90aff045a4f42ad02d23ea85939486c95b04106537821e740ab05d"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ac47c7c915545b033d84d7d34a099a9e2d2c095d412a386a9f4302b746689d78","downloaded_from":"2026-09-09T23:44:49.329Z","last_downloaded_at":"2026-09-09T23:44:49.329Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481398","source_sha256":"a6aa5cb86c90aff045a4f42ad02d23ea85939486c95b04106537821e740ab05d"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9d43f7b2927856f2be10bc7431e91e4bda822b953ea9cf2f2beab42c2eab99ab","downloaded_from":"2026-09-09T23:44:49.329Z","last_downloaded_at":"2026-09-09T23:44:49.329Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481398","source_sha256":"a6aa5cb86c90aff045a4f42ad02d23ea85939486c95b04106537821e740ab05d"}},{"number":"55","label":"55 Implementation Guidance and Illustrations","anchor":"55-implementation-guidance-and-illustrations","is_sec":false,"groups":[{"block":null,"heading":"Implementation Guidance","paragraphs":[{"citation":"325-40-55-1","para":"55-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2016-13</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2016-13.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5b6ddc99f52c9d53b97ffc9ae5d27675942180c105d2c9a79f097ca7d65fb80f","downloaded_from":"2026-09-09T23:44:52.788Z","last_downloaded_at":"2026-09-09T23:44:52.788Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481369","source_sha256":"9c449d1faadf2ad4f0e79b903e89a6822799daa1b56fb06bf23c24330291ef96"}},{"citation":"325-40-55-2","para":"55-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/asc/325/40/#325-40-55-2\" class=\"xref\">Paragraphs 325-40-55-2 through 55-25 superseded by Accounting Standards Update No. 2009-16</a>.</div></div>","snippet":"Paragraphs 325-40-55-2 through 55-25 superseded by Accounting Standards Update No. 2009-16.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cf2fdfaf8aabad1dd658ad9e2819b4ad506c5356d157891ccc9cd79acdcefe8d","downloaded_from":"2026-09-09T23:44:52.788Z","last_downloaded_at":"2026-09-09T23:44:52.788Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481369","source_sha256":"9c449d1faadf2ad4f0e79b903e89a6822799daa1b56fb06bf23c24330291ef96"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:790217168f0af4f3bd6bf42a2656a5a759ffc86d629b65bdf84da48e17f5c3a1","downloaded_from":"2026-09-09T23:44:52.788Z","last_downloaded_at":"2026-09-09T23:44:52.788Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481369","source_sha256":"9c449d1faadf2ad4f0e79b903e89a6822799daa1b56fb06bf23c24330291ef96"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fcbdd6f5ca652e86213ff9d8c0b17ad6ef69bc4fde2dcd34a0a6408f677a3052","downloaded_from":"2026-09-09T23:44:52.788Z","last_downloaded_at":"2026-09-09T23:44:52.788Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481369","source_sha256":"9c449d1faadf2ad4f0e79b903e89a6822799daa1b56fb06bf23c24330291ef96"}},{"number":"65","label":"65 Transition and Open Effective Date Information","anchor":"65-transition-and-open-effective-date-information","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"325-40-65-1","para":"65-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">Paragraph superseded on 03/23/2010 after the end of the transition period stated in FSP EITF 99-20-1, <em class=\"ph i\">Amendments to the Impairment Guidance of EITF Issue No. 99-20</em>.</div></div>","snippet":"Paragraph superseded on 03/23/2010 after the end of the transition period stated in FSP EITF 99-20-1, Amendments to the Impairment Guidance of EITF Issue No. 99-20.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7c248bc782a01edef424f833af9cbb7865455ed65d78ca254adac0cf0bd3b43f","downloaded_from":"2026-09-09T23:44:56.279Z","last_downloaded_at":"2026-09-09T23:44:56.279Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481344","source_sha256":"a681442ea550afb3110172187bf1bb428dd8e2ec1734767c120f85e38456e7ae"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:da25966b8fddf630b51859f57844e8b7398c5faffcb0ff614cbdb7ab90c9c57f","downloaded_from":"2026-09-09T23:44:56.279Z","last_downloaded_at":"2026-09-09T23:44:56.279Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481344","source_sha256":"a681442ea550afb3110172187bf1bb428dd8e2ec1734767c120f85e38456e7ae"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:80b76e9fcc419a5b7cdfd944ef315c3ceed557ed3ee62fee7db57d6e00efa1a1","downloaded_from":"2026-09-09T23:44:56.279Z","last_downloaded_at":"2026-09-09T23:44:56.279Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481344","source_sha256":"a681442ea550afb3110172187bf1bb428dd8e2ec1734767c120f85e38456e7ae"}}],"enrichment":{"summary":"ASC 325-40 governs how a holder recognizes interest income on beneficial interests in securitized financial assets — both a transferor's retained interests in securitizations accounted for as sales under Topic 860 and purchased beneficial interests. The holder measures accretable yield at acquisition as the excess of cash flows expected to be collected (or contractual cash flows, for PCD beneficial interests) over the initial investment (or initial amortized cost basis), and accretes it into interest income using the effective yield method. Expected cash flows must be updated each period; favorable or adverse changes are run first through the credit loss guidance in Topic 326, with any residual change adjusting accretable yield prospectively.","key_points":["The Subtopic applies to beneficial interests that are (or must be accounted for as) debt securities under Subtopic 320-10, involve securitized assets with contractual cash flows, and do not result in consolidation of the issuing entity; high-credit-quality interests that cannot be prepaid in a way that prevents recovery of substantially all of the recorded investment are excluded (325-40-15-3).","A transferor's initial investment in a retained beneficial interest is the fair value at the transfer date under 860-20-30-1 (325-40-30-1), and PCD initial measurement under Subtopic 326-20 (HTM) or 326-30 (AFS) applies when there is a significant difference between contractual and expected cash flows or the interest meets the PCD definition (325-40-30-1A).","Accretable yield is initially the excess of all cash flows expected to be collected over the initial investment; for PCD beneficial interests it is the excess of all contractual cash flows over the amortized cost basis (purchase price plus initial allowance for credit losses) (325-40-30-2).","Accretable yield is recognized as interest income over the life of the interest using the effective yield method, and the holder must continually update its estimate of cash flows expected to be collected (325-40-35-1).","For a favorable or adverse change in expected cash flows, the investor first applies Subtopic 326-20 (HTM) or 326-30 (AFS); any change not reflected in the allowance for credit losses causes a recalculation of accretable yield as the excess of expected cash flows over the beneficial interest's reference amount (325-40-35-4, 35-4A, 35-4B).","Changes are identified by comparing the present value of previously projected remaining cash flows with the present value of currently expected cash flows, discounted at the current yield used to accrete the interest, and the resulting adjustment is prospective as a change in estimate under Topic 250 (325-40-35-5, 35-6, 35-4C).","The cost recovery method must be used when a beneficial interest is on nonaccrual status or the holder cannot reliably estimate cash flows (325-40-35-16), and accretable yield is never displayed on the balance sheet (325-40-45-1)."],"categories":["Financial instruments","Subsequent measurement","Impairment","Initial measurement"],"audience_level":"advanced","student_note":"This is the income-recognition companion to the CECL rules: after ASU 2016-13, credit deterioration goes through the Topic 326 allowance first, and only leftover changes in expected cash flows reset the accretable yield — a common mistake is still treating adverse changes as a direct yield/impairment write-down in the old EITF 99-20 fashion. Note also that a beneficial interest in equity form can still be inside this Subtopic if it meets the definition of a debt security.","related_topics":["860-20","320-10","326-20","326-30","815-15","310-30"],"key_concepts":["beneficial interests","securitized financial assets","accretable yield","effective yield method","cash flows expected to be collected","purchased financial assets with credit deterioration","reference amount","cost recovery method"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6908543d9a014ce9f48b6056c9b47a254b61710e9a33db1b23411d94f36cdda9","downloaded_from":"2026-09-09T23:44:27.827Z","last_downloaded_at":"2026-09-09T23:44:58.835Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"320-10","title":"Overall","topic_title":"Investments—Debt Securities","score":0.7933,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d2a9eb99fc548b3c26c1689c7fa2999d0a9981a91b4d74cc8c7b4fb62bb8201f","downloaded_from":"2026-09-09T23:34:37.849Z","last_downloaded_at":"2026-09-09T23:35:28.596Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"326-30","title":"Available-for-Sale Debt Securities","topic_title":"Financial Instruments—Credit Losses","score":0.7885,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cb8ac8148f74d5277f53257112f1b2245095f99a524b7359b2323d7cc6c3580d","downloaded_from":"2026-09-09T23:49:57.453Z","last_downloaded_at":"2026-09-09T23:50:26.688Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"860-30","title":"Secured Borrowing and Collateral","topic_title":"Transfers and Servicing","score":0.7744,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:18e3df6ac2e302b631b221b5a1619c9eea52be074c66457691ea4c57aaf23100","downloaded_from":"2026-09-10T02:06:50.852Z","last_downloaded_at":"2026-09-10T02:07:35.766Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"326-20","title":"Measured at Amortized Cost","topic_title":"Financial Instruments—Credit Losses","score":0.7729,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6aeedf65be9452a0d55739575c15359f19961a311d6c6deb9a9f131547caacab","downloaded_from":"2026-09-09T23:49:16.307Z","last_downloaded_at":"2026-09-09T23:49:55.257Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"310-10","title":"Overall","topic_title":"Receivables","score":0.7688,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0342f2af01722d99aba598b8612618e46799e38eb195309d35a79bdc3c0031ad","downloaded_from":"2026-09-09T23:24:42.337Z","last_downloaded_at":"2026-09-09T23:25:40.463Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"815-30","title":"Cash Flow Hedges","topic_title":"Derivatives and Hedging","score":0.7651,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5d092bf127dcdbe4ca37e096efa99ae8238fb48c578e772d852624e625cb97e7","downloaded_from":"2026-09-10T01:37:35.233Z","last_downloaded_at":"2026-09-10T01:38:16.160Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"325-30","title":"Investments in Insurance Contracts","topic_title":"Investments—Other","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:069c6af5c0e2033b2d03a68b664c9a61770d4b274c55cc58dfe05d6d10472a7c","downloaded_from":"2026-09-09T23:43:55.828Z","last_downloaded_at":"2026-09-09T23:44:24.209Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"325-905","title":"Agriculture","topic_title":"Investments—Other","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c7c8904e6838bf0dd941a7679ea798efcae7681797e79b6e8202a0a809c9996f","downloaded_from":"2026-09-09T23:45:01.186Z","last_downloaded_at":"2026-09-09T23:45:25.642Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c4d83e957dc12aa6c2c22ad0f8ca5d979b1dfe6f56a66150173d3514244963d4","downloaded_from":"2026-09-09T23:44:27.827Z","last_downloaded_at":"2026-09-09T23:44:58.835Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}