# ASC 330-910-40: Inventory — Contractors—Construction — 40 Derecognition

Source: FASB Accounting Standards Codification, Basic View

[Read online](https://asc.understandingaccounting.org/asc/330/910/#40-derecognition)

Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.

Tables and mathematical or amendment markup are retained as HTML where Markdown would lose structure.

Source downloaded (UTC): 2026-09-09T23:52:29.423Z to 2026-09-09T23:52:29.423Z

Record version: sha256:05cbd2c66b85fdbe13b12b736c0ae0963a93c7c29c383618f9e81b28c1bf1b53

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 330-910-40: 40 Derecognition

[Read section](https://asc.understandingaccounting.org/asc/330/910/#40-derecognition)

SEC content: no

##### [330-910-40-1](https://asc.understandingaccounting.org/asc/330/910/#330-910-40-1)

Pending content: no

Source downloaded (UTC): 2026-09-09T23:52:29.423Z to 2026-09-09T23:52:29.423Z

Record version: sha256:9713a52d362b020c1c620b7d1b2fb04f0e3e3cf89088720ae3b7bb7d89e46e7d

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


[Paragraph superseded by Maintenance Update No. 2019-01.](https://asc.understandingaccounting.org/updates/maintenance-updates-2019/)
