# ASC 340-10-55: Other Assets and Deferred Costs — Overall — 55 Implementation Guidance and Illustrations

Source: FASB Accounting Standards Codification, Basic View

[Read online](https://asc.understandingaccounting.org/asc/340/10/#55-implementation-guidance-and-illustrations)

Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.

Tables and mathematical or amendment markup are retained as HTML where Markdown would lose structure.

Source downloaded (UTC): 2026-09-09T23:54:35.789Z to 2026-09-09T23:54:35.789Z

Record version: sha256:074dbcb089d024fd98e446aa003e8ddee81de9822eb2f9b89391cded6a3cc940

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 340-10-55: 55 Implementation Guidance and Illustrations

[Read section](https://asc.understandingaccounting.org/asc/340/10/#55-implementation-guidance-and-illustrations)

SEC content: no

##### [340-10-55-1](https://asc.understandingaccounting.org/asc/340/10/#340-10-55-1)

Pending content: no

Source downloaded (UTC): 2026-09-09T23:54:35.789Z to 2026-09-09T23:54:35.789Z

Record version: sha256:1604c9ab3445bf538c7a03ca48804908658943ca455addeeb0a782033e9d733a

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


[Paragraph not used](https://asc.understandingaccounting.org/updates/page-1833002/).

#### Illustrations

##### [340-10-55-2](https://asc.understandingaccounting.org/asc/340/10/#340-10-55-2)

Pending content: no

Source downloaded (UTC): 2026-09-09T23:54:35.789Z to 2026-09-09T23:54:35.789Z

Record version: sha256:7a2ca96e29141f37075d1c3fa1a35cae09b66ddd29fedb73678f82b5a11f3e4e

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Example illustrates the recognition guidance in paragraphs

[340-10-25-1 through 25-3](https://asc.understandingaccounting.org/asc/340/10/#340-10-25-1)

. It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It is also assumed that the supply arrangement is legally enforceable. An entity enters into a long-term arrangement with a supplier in which the entity agrees to reimburse the supplier for preproduction design and development costs incurred under the arrangement, up to a maximum reimbursement of $1,000,000. Under this arrangement, the amount of reimbursement for design and development costs can be objectively measured and verified. The supplier shall recognize the design and development costs as an asset as costs are incurred, up to a maximum of $1,000,000.

##### [340-10-55-3](https://asc.understandingaccounting.org/asc/340/10/#340-10-55-3)

Pending content: no

Source downloaded (UTC): 2026-09-09T23:54:35.789Z to 2026-09-09T23:54:35.789Z

Record version: sha256:e492d100ab17b43659ed185afdaf263aab7be511d18f7e3a46cf963f5d549d72

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Example illustrates the recognition guidance in paragraphs

[340-10-25-1 through 25-3](https://asc.understandingaccounting.org/asc/340/10/#340-10-25-1)

. It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It is also assumed that the supply arrangement is legally enforceable. An entity enters into a long-term arrangement with a supplier in which the entity agrees to pay the supplier $55 per part for the first 200,000 parts produced and $50 for every part thereafter. No agreement exists concerning reimbursement of the supplier's design and development costs if fewer than 200,000 parts are produced under the arrangement. Under this arrangement, the amount of reimbursement for design and development costs cannot be objectively measured and verified. The supplier shall expense the preproduction design and development costs as incurred.

##### [340-10-55-4](https://asc.understandingaccounting.org/asc/340/10/#340-10-55-4)

Pending content: no

Source downloaded (UTC): 2026-09-09T23:54:35.789Z to 2026-09-09T23:54:35.789Z

Record version: sha256:be0030735087fe29b9cf338dc22cba157b8e4822dbf69b470a4b0bfaa6c92839

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Example illustrates the recognition guidance in paragraphs

[340-10-25-1 through 25-3](https://asc.understandingaccounting.org/asc/340/10/#340-10-25-1)

. It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It is also assumed that the supply arrangement is legally enforceable. An entity enters into a long-term arrangement with a supplier in which the entity agrees to pay the supplier $55 per part for the first 200,000 parts produced and $50 for every part thereafter. The arrangement provides that if fewer than 200,000 parts are produced, the supplier will be reimbursed for design and development costs incurred under the arrangement, up to a maximum reimbursement of $1,000,000 reduced by $5 per part for each part produced under the supply arrangement. For example, if 190,000 parts are produced under the supply arrangement, in addition to the $55 per part received for the parts produced, the supplier would be reimbursed for design and development costs incurred under the arrangement, up to a maximum of $50,000 \[$1,000,000 - ($5 X 190,000)\]. Under this agreement, the amount of reimbursement for design and development costs can be objectively measured and verified. The supplier shall recognize the design and development costs as an asset as costs are incurred, up to a maximum of $1,000,000.

##### [340-10-55-5](https://asc.understandingaccounting.org/asc/340/10/#340-10-55-5)

Pending content: no

Source downloaded (UTC): 2026-09-09T23:54:35.789Z to 2026-09-09T23:54:35.789Z

Record version: sha256:f25cdc611a3e1804897c606c636f80f0e8850f0a2df65ef550520d2d76b21708

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Example illustrates the recognition guidance in paragraphs

[340-10-25-1 through 25-3](https://asc.understandingaccounting.org/asc/340/10/#340-10-25-1)

. It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It is also assumed that the supply arrangement is legally enforceable. An entity enters into a long-term arrangement with a supplier in which the entity agrees to pay the supplier $52.50 per part. The arrangement requires that a minimum of 400,000 parts be produced. If fewer than 400,000 parts are produced under the arrangement, the supplier will receive a payment of $52.50 per part not produced under the arrangement, up to a maximum of 400,000 parts. Under this arrangement, the amount of reimbursement for design and development costs cannot be objectively measured and verified. The supplier shall expense the design and development costs as incurred.
