{"schema_version":2,"canonical_url":"https://asc.understandingaccounting.org/asc/340/10/","source":"FASB Accounting Standards Codification, Basic View","usage":"Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.","number":"340-10","topic":"340","title":"Overall","area":"Assets","paragraphs":49,"summary":"ASC 340-10 is the Overall subtopic for Other Assets and Deferred Costs, applicable to all entities. Its substantive guidance is limited to (1) describing prepaid expenses — amounts paid in advance (insurance, interest, rents, taxes, unused royalties, prepaid advertising service, operating supplies) that are used up within the normal operating cycle and classified as current assets — and (2) the recognition rules for preproduction design and development costs incurred under long-term supply arrangements. Costs deferred under other regimes (loan origination costs, internal-use software, environmental costs, broker-dealer and industry costs) are addressed by other Topics cross-referenced in Section 60.","concepts":["prepaid expenses","preproduction costs","long-term supply arrangement","design and development costs","molds, dies, and other tools","contractual guarantee of reimbursement","noncancelable right to use","planned major maintenance"],"categories":["Recognition","Inventory and PP&E","Subsequent measurement","Financial statement presentation"],"level":"intermediate","topic_title":"Other Assets and Deferred Costs","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"340-10-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" id=\"SL35746165-161710\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>Contract</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#customer\" class=\"term\" title=\"A party that has contracted with an entity to obtain goods or services that are an output of the entity's ordinary activities in exchange for consideration.\"><span>Customer</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/340/10/#340-10-05-1\" class=\"xref\">340-10-05-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/10/#340-10-60-1\" class=\"xref\">340-10-60-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/10/#340-10-60-5\" class=\"xref\">340-10-60-5</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/10/#340-10-60-6\" class=\"xref\">340-10-60-6</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/10/#340-10-60-8\" class=\"xref\">340-10-60-8</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/10/#340-10-60-9\" class=\"xref\">340-10-60-9</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-10/\" class=\"xref\">Accounting Standards Update No. 2014-10</a></td><td class=\"entry\">06/10/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/10/#340-10-60-15\" class=\"xref\">340-10-60-15</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2013-08/\" class=\"xref\">Accounting Standards Update No. 2013-08</a></td><td class=\"entry\">06/07/2013</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\nContract | Added | Accounting Standards Update No. 2014-09 | 05/28/2014 |\nCustomer | Add…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b93d5213c6af088d1fa588051ce582673e4e1b8ffe70f59e92fb61013d0af46d","downloaded_from":"2026-09-09T23:54:15.524Z","last_downloaded_at":"2026-09-09T23:54:15.524Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482978","source_sha256":"2becfb0f51c8fee3a7939d2411b341f5b2375be7471cee32ced30376fb84e551"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d961c1a7fe5cb5ca6ca3a9e7054b1e234e255dca10d0cbcabcdff6f294b0209c","downloaded_from":"2026-09-09T23:54:15.524Z","last_downloaded_at":"2026-09-09T23:54:15.524Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482978","source_sha256":"2becfb0f51c8fee3a7939d2411b341f5b2375be7471cee32ced30376fb84e551"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e254d50de5685d115c8872121d5d250200162cc780ead8e0c701ef1ba649ec7a","downloaded_from":"2026-09-09T23:54:15.524Z","last_downloaded_at":"2026-09-09T23:54:15.524Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482978","source_sha256":"2becfb0f51c8fee3a7939d2411b341f5b2375be7471cee32ced30376fb84e551"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"340-10-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The Other Assets and Deferred Costs Topic includes the following Subtopics:<ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\">Overall</div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Subparagraph superseded by Accounting Standards Update No. 2014-09</a>.</div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\">Insurance Contracts That Do Not Transfer Insurance Risk.</div></li><li class=\"li-norm\"><span class=\"linum\">d</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_652E0360-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"><a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>Contracts</span></a> with <a href=\"/glossary/c/#customer\" class=\"term\" title=\"A party that has contracted with an entity to obtain goods or services that are an output of the entity's ordinary activities in exchange for consideration.\"><span>Customers</span></a></span></span></div></li></ol></div></div>","snippet":"The Other Assets and Deferred Costs Topic includes the following Subtopics:\n(a) Overall\n(b) Subparagraph superseded by Accounting Standards Update No. 2014-09.\n(c) Insurance Contracts That Do Not Transfer Insurance Risk.…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0e26ad5a1738152e0119cafe1f74f72e9e5e5690b3a67153d9948455be4f3e6a","downloaded_from":"2026-09-09T23:54:18.589Z","last_downloaded_at":"2026-09-09T23:54:18.589Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482955","source_sha256":"2b299a896e453877f1c45a1a5b2b62880dcda4c10d787dfc4fa4ecdfd4a76438"}},{"citation":"340-10-05-2","para":"05-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">The Overall Subtopic addresses the accounting and reporting for certain deferred costs and prepaid expenses. The guidance in this Subtopic is limited to a discussion of the nature of prepaid expenses and preproduction costs related to long-term supply arrangements. The specific guidance for many other costs that have been deferred is included in various other financial, broad, and industry Topics. References to certain, but not all, of the guidance in other Topics are included in this Subtopic.</div></div>","snippet":"The Overall Subtopic addresses the accounting and reporting for certain deferred costs and prepaid expenses. The guidance in this Subtopic is limited to a discussion of the nature of prepaid expenses and preproduction co…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a4ff73ea0ef331222637772240bdd399a61106be880c4a92b5c340808816ca0f","downloaded_from":"2026-09-09T23:54:18.589Z","last_downloaded_at":"2026-09-09T23:54:18.589Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482955","source_sha256":"2b299a896e453877f1c45a1a5b2b62880dcda4c10d787dfc4fa4ecdfd4a76438"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fd7fd30b0d4995d9138717a6c83a8becad73648ec0760d5d260a8a7e5802c289","downloaded_from":"2026-09-09T23:54:18.589Z","last_downloaded_at":"2026-09-09T23:54:18.589Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482955","source_sha256":"2b299a896e453877f1c45a1a5b2b62880dcda4c10d787dfc4fa4ecdfd4a76438"}},{"block":null,"heading":"Deferred Costs Addressed in this Subtopic","paragraphs":[{"citation":"340-10-05-3","para":"05-3","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following provides background regarding certain items included in this Subtopic.</div></div>","snippet":"The following provides background regarding certain items included in this Subtopic.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:384b3a6e5ba4ef4e308ace85f73af8b0b3706f52b62055a0d23d5660a8a543ca","downloaded_from":"2026-09-09T23:54:18.589Z","last_downloaded_at":"2026-09-09T23:54:18.589Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482955","source_sha256":"2b299a896e453877f1c45a1a5b2b62880dcda4c10d787dfc4fa4ecdfd4a76438"}},{"citation":"340-10-05-4","para":"05-4","html":"<div class=\"asc-body\"><div class=\"norm-text\">Prepaid expenses are a category of assets that are typically used up or expire within the normal operating cycle of an entity. The term derives from the fact that they are paid in advance of their use or consumption.</div></div>","snippet":"Prepaid expenses are a category of assets that are typically used up or expire within the normal operating cycle of an entity. The term derives from the fact that they are paid in advance of their use or consumption.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4e9fda82cc3dd3db1d3032fee0711f47d21640660dba44cbdc25e4653a46ea11","downloaded_from":"2026-09-09T23:54:18.589Z","last_downloaded_at":"2026-09-09T23:54:18.589Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482955","source_sha256":"2b299a896e453877f1c45a1a5b2b62880dcda4c10d787dfc4fa4ecdfd4a76438"}},{"citation":"340-10-05-5","para":"05-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_652E04D4-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Prepaid expenses include items such as the following: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_652E05CC-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Insurance </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_652E06B0-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Interest </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_652E078B-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Rents </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">d</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_652E0861-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Taxes </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">e</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_652E093E-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Unused royalties </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">f</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_652E0A0A-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Current paid advertising service not yet received </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">g</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_652E0AE2-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Operating supplies. </span></span></div></li></ol></div></div>","snippet":"Prepaid expenses include items such as the following:\n(a) Insurance\n(b) Interest\n(c) Rents\n(d) Taxes\n(e) Unused royalties\n(f) Current paid advertising service not yet received\n(g) Operating supplies.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b9ab128e22612083a263ffeec4c2e7a53aab21e89998f8af468c7e5cbbd667b9","downloaded_from":"2026-09-09T23:54:18.589Z","last_downloaded_at":"2026-09-09T23:54:18.589Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482955","source_sha256":"2b299a896e453877f1c45a1a5b2b62880dcda4c10d787dfc4fa4ecdfd4a76438"}},{"citation":"340-10-05-6","para":"05-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_652E0BEB-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Manufacturers often incur preproduction costs related to products they will supply to their customers under long-term supply arrangements. For example, the manufacturer may incur costs to perform certain services related to the design and development of the products it will sell under long-term supply arrangements and may incur costs to design and develop molds, dies, and other tools that will be used in producing those products. </span></span><span class=\"sfragment\" id=\"sfr_652E0CAF-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">While practice varies from industry to industry, the supplier may be contractually guaranteed reimbursement of design and development costs, implicitly guaranteed reimbursement of design and development costs through the pricing of the product or other means, or not guaranteed reimbursement of the design and development costs incurred under the long-term supply arrangement. </span></span></div></div>","snippet":"Manufacturers often incur preproduction costs related to products they will supply to their customers under long-term supply arrangements. For example, the manufacturer may incur costs to perform certain services related…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e139d3d6a2d763f202631ab1b7059221273e16d386541a141bae2102376e0271","downloaded_from":"2026-09-09T23:54:18.589Z","last_downloaded_at":"2026-09-09T23:54:18.589Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482955","source_sha256":"2b299a896e453877f1c45a1a5b2b62880dcda4c10d787dfc4fa4ecdfd4a76438"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4bb5f6b164b6602d1cacc5c91c59b2a724b17db30f60caa77523c882a6de18ca","downloaded_from":"2026-09-09T23:54:18.589Z","last_downloaded_at":"2026-09-09T23:54:18.589Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482955","source_sha256":"2b299a896e453877f1c45a1a5b2b62880dcda4c10d787dfc4fa4ecdfd4a76438"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2ea6fe95163d7e35f059305f4b7128844f5a9f19109ba498a1206a9ec23e76fd","downloaded_from":"2026-09-09T23:54:18.589Z","last_downloaded_at":"2026-09-09T23:54:18.589Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482955","source_sha256":"2b299a896e453877f1c45a1a5b2b62880dcda4c10d787dfc4fa4ecdfd4a76438"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"340-10-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The Scope Section of the Overall Subtopic establishes the pervasive scope for all Subtopics of the Other Assets and Deferred Costs Topic. Unless explicitly addressed within specific Subtopics, the following scope guidance applies to all Subtopics of the Deferred Costs and Other Assets Topic.</div></div>","snippet":"The Scope Section of the Overall Subtopic establishes the pervasive scope for all Subtopics of the Other Assets and Deferred Costs Topic. Unless explicitly addressed within specific Subtopics, the following scope guidanc…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5e4aa9ef36f6e6035b213c6d9884a72fa875df53dd0e08b7b19b6be807350c23","downloaded_from":"2026-09-09T23:54:21.591Z","last_downloaded_at":"2026-09-09T23:54:21.591Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482931","source_sha256":"06c086f24e6a0501619a4ed210477a4a2c868d31650de8f9ce5cfb8e0b3fba2a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:25dedb74ae1170a31e205f3a1fe62e5060e2e17f744163927829ebfb399ca96e","downloaded_from":"2026-09-09T23:54:21.591Z","last_downloaded_at":"2026-09-09T23:54:21.591Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482931","source_sha256":"06c086f24e6a0501619a4ed210477a4a2c868d31650de8f9ce5cfb8e0b3fba2a"}},{"block":null,"heading":"Entities","paragraphs":[{"citation":"340-10-15-2","para":"15-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">The guidance in the Other Assets and Deferred Costs Topic applies to all entities.</div></div>","snippet":"The guidance in the Other Assets and Deferred Costs Topic applies to all entities.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2916e3e709d9969946c29f5d8c5164c5b74d73315934bd9a34ed3175ae7d09b6","downloaded_from":"2026-09-09T23:54:21.591Z","last_downloaded_at":"2026-09-09T23:54:21.591Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482931","source_sha256":"06c086f24e6a0501619a4ed210477a4a2c868d31650de8f9ce5cfb8e0b3fba2a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1874d72d631eff5f8a7b55a6dfbebd38cc1fff0d2a7948da49fcfab373ca6d02","downloaded_from":"2026-09-09T23:54:21.591Z","last_downloaded_at":"2026-09-09T23:54:21.591Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482931","source_sha256":"06c086f24e6a0501619a4ed210477a4a2c868d31650de8f9ce5cfb8e0b3fba2a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c067ee0f254256a6602efaea48466c6b9fc606c3ac02ec8bc95d8238900a6a11","downloaded_from":"2026-09-09T23:54:21.591Z","last_downloaded_at":"2026-09-09T23:54:21.591Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482931","source_sha256":"06c086f24e6a0501619a4ed210477a4a2c868d31650de8f9ce5cfb8e0b3fba2a"}},{"number":"25","label":"25 Recognition","anchor":"25-recognition","is_sec":false,"groups":[{"block":null,"heading":"Preproduction Costs Related to Long-Term Supply Arrangements","paragraphs":[{"citation":"340-10-25-1","para":"25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_6545F72C-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Design and development costs for products to be sold under long-term supply arrangements shall be expensed as incurred. Design and development costs for molds, dies, and other tools that a supplier will own and that will be used in producing the products under a long-term supply arrangement shall be capitalized as part of the molds, dies, and other tools (subject to an impairment assessment under the Impairment or Disposal of Long-Lived Assets Subsections of Subtopic <a altsource=\"GUID-709FAAEC-8DFC-4054-A41F-EFA6FC5A716C.ditamap\" class=\"ditamap\">360-10</a>) </span></span> <span class=\"sfragment\" id=\"sfr_6545F8EF-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> unless the design and development is for molds, dies, and other tools involving new technology, in which case, the costs shall be expensed as incurred in accordance with Subtopic <a altsource=\"GUID-146E5FDA-DB79-4838-B45B-CF40885137A1.ditamap\" class=\"ditamap\">730-10</a>. </span></span> </div> </div>","snippet":"Design and development costs for products to be sold under long-term supply arrangements shall be expensed as incurred. Design and development costs for molds, dies, and other tools that a supplier will own and that will…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ee85a5ecb6b74c2763ef011902f9e34066a3888f95beb135afe6de6ea27feb24","downloaded_from":"2026-09-09T23:54:26.698Z","last_downloaded_at":"2026-09-09T23:54:26.698Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483082","source_sha256":"8842eab15ee02b1ed39d488893f1ea09d24ab14fd7516d8dd1a74e8ddfb861a2"}},{"citation":"340-10-25-2","para":"25-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_6545FA71-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Design and development costs for molds, dies, and other tools that a supplier will not own and that will be used in producing the products under the long-term supply arrangement shall be capitalized (subject to an impairment assessment under the Impairment or Disposal of Long-Lived Assets Subsections of Subtopic <a altsource=\"GUID-709FAAEC-8DFC-4054-A41F-EFA6FC5A716C.ditamap\" class=\"ditamap\">360-10</a>) </span></span> <span class=\"sfragment\" id=\"sfr_6545FBCA-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> if the supply arrangement provides the supplier the noncancelable right (as long as the supplier is performing under the terms of the supply arrangement) to use the molds, dies, and other tools during the supply arrangement. Otherwise, those design and development costs shall be expensed as incurred, including costs incurred prior to the supplier's receiving the noncancelable right to use the molds, dies, and other tools during the supply arrangement. </span></span> </div> </div>","snippet":"Design and development costs for molds, dies, and other tools that a supplier will not own and that will be used in producing the products under the long-term supply arrangement shall be capitalized (subject to an impair…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:220ab825452b33bc775aec054ddd62a0de97f625a60d365e38bac9b5fd27934c","downloaded_from":"2026-09-09T23:54:26.698Z","last_downloaded_at":"2026-09-09T23:54:26.698Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483082","source_sha256":"8842eab15ee02b1ed39d488893f1ea09d24ab14fd7516d8dd1a74e8ddfb861a2"}},{"citation":"340-10-25-3","para":"25-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_6545FD21-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If a contractual guarantee for reimbursement exists for design and development costs that otherwise would be expensed based on the guidance in this Section, those costs shall be recognized as an asset as incurred. For purposes of this Subtopic, contractual guarantee means a legally enforceable agreement in which the amount of reimbursement can be objectively measured and verified. </span></span> </div> </div>","snippet":"If a contractual guarantee for reimbursement exists for design and development costs that otherwise would be expensed based on the guidance in this Section, those costs shall be recognized as an asset as incurred. For pu…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a46705b1b5528201cae8edea3669b4a06fb6685adac672070141d43dc3e42a09","downloaded_from":"2026-09-09T23:54:26.698Z","last_downloaded_at":"2026-09-09T23:54:26.698Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483082","source_sha256":"8842eab15ee02b1ed39d488893f1ea09d24ab14fd7516d8dd1a74e8ddfb861a2"}},{"citation":"340-10-25-4","para":"25-4","html":"<div class=\"asc-body\"><div class=\"norm-text\">See Examples 1 through 4 (paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/340/10/#340-10-55-2\" class=\"xref\">340-10-55-2 through 55-5</a></div>) for preproduction costs related to long-term supply arrangements.</div> </div>","snippet":"See Examples 1 through 4 (paragraphs 340-10-55-2 through 55-5) for preproduction costs related to long-term supply arrangements.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ce602046578f390700ea45c521e35205f995c5232a06d2e755e314e32c664b8a","downloaded_from":"2026-09-09T23:54:26.698Z","last_downloaded_at":"2026-09-09T23:54:26.698Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483082","source_sha256":"8842eab15ee02b1ed39d488893f1ea09d24ab14fd7516d8dd1a74e8ddfb861a2"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b178fa0806444ee9157675ec5be0e62d5352347f602bf767322a999138eee31f","downloaded_from":"2026-09-09T23:54:26.698Z","last_downloaded_at":"2026-09-09T23:54:26.698Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483082","source_sha256":"8842eab15ee02b1ed39d488893f1ea09d24ab14fd7516d8dd1a74e8ddfb861a2"}},{"block":null,"heading":"Planned Major Maintenance Activities","paragraphs":[{"citation":"340-10-25-5","para":"25-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_6545FE8B-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraph <a href=\"/asc/360/10/#360-10-25-5\" class=\"xref\">360-10-25-5</a> states that the use of the accrue-in-advance (accrual) method of accounting for planned major maintenance activities is prohibited in annual and interim financial reporting periods.</span></span> </div> </div>","snippet":"Paragraph 360-10-25-5 states that the use of the accrue-in-advance (accrual) method of accounting for planned major maintenance activities is prohibited in annual and interim financial reporting periods.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:60ffb6e9b2c8a525a5c4af58fd9f1a2d38c64b968b2218b64b5990df291e6919","downloaded_from":"2026-09-09T23:54:26.698Z","last_downloaded_at":"2026-09-09T23:54:26.698Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483082","source_sha256":"8842eab15ee02b1ed39d488893f1ea09d24ab14fd7516d8dd1a74e8ddfb861a2"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d95704f2e354de2057119cb27eb58f941262b1c576689fdf540ae3f374023553","downloaded_from":"2026-09-09T23:54:26.698Z","last_downloaded_at":"2026-09-09T23:54:26.698Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483082","source_sha256":"8842eab15ee02b1ed39d488893f1ea09d24ab14fd7516d8dd1a74e8ddfb861a2"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6906efd262ef7aee64ac270d0f52ddbeac4f4732decc79c96d399e13bb28e46d","downloaded_from":"2026-09-09T23:54:26.698Z","last_downloaded_at":"2026-09-09T23:54:26.698Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483082","source_sha256":"8842eab15ee02b1ed39d488893f1ea09d24ab14fd7516d8dd1a74e8ddfb861a2"}},{"number":"35","label":"35 Subsequent Measurement","anchor":"35-subsequent-measurement","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"340-10-35-1","para":"35-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">See paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/360/10/#360-10-15-4\" class=\"xref\">360-10-15-4 through 15-5</a></div> for a discussion of the applicability of the guidance on long-lived assets to be held and used or disposed of to long-term prepaid assets.</div> </div>","snippet":"See paragraphs 360-10-15-4 through 15-5 for a discussion of the applicability of the guidance on long-lived assets to be held and used or disposed of to long-term prepaid assets.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a9f8b2c54c65e33f98990bf0a65a968d875882244ab5c68ab9a3936a1b5be069","downloaded_from":"2026-09-09T23:54:30.703Z","last_downloaded_at":"2026-09-09T23:54:30.703Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483056","source_sha256":"93c263658ed2ea96dee8dd599f570be49c8feb5aaf2416f0484e95cc9a3d143c"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2c99e8725967692b32070bd5b3305db56a526e0835d40e55b1eab4e9a561a225","downloaded_from":"2026-09-09T23:54:30.703Z","last_downloaded_at":"2026-09-09T23:54:30.703Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483056","source_sha256":"93c263658ed2ea96dee8dd599f570be49c8feb5aaf2416f0484e95cc9a3d143c"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d7f2fe26813ad8da78488a2673bde5c2c8d8a30fc9f1830271e0d73a3de48934","downloaded_from":"2026-09-09T23:54:30.703Z","last_downloaded_at":"2026-09-09T23:54:30.703Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483056","source_sha256":"93c263658ed2ea96dee8dd599f570be49c8feb5aaf2416f0484e95cc9a3d143c"}},{"number":"45","label":"45 Other Presentation Matters","anchor":"45-other-presentation-matters","is_sec":false,"groups":[{"block":null,"heading":"Classification of Prepaid Expenses","paragraphs":[{"citation":"340-10-45-1","para":"45-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">See paragraph <a href=\"/asc/210/10/#210-10-45-2\" class=\"xref\">210-10-45-2</a> for a discussion of how the nature of prepaid expenses results in their classification as current assets.</div></div>","snippet":"See paragraph 210-10-45-2 for a discussion of how the nature of prepaid expenses results in their classification as current assets.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d394100ae4e6ee1f5f1013853de20eacdd9d732ec52a820f0ed07579124cdeba","downloaded_from":"2026-09-09T23:54:33.465Z","last_downloaded_at":"2026-09-09T23:54:33.465Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483032","source_sha256":"08767e57f029de2acd87a5e29be6d943cb2214c6c53457f58589645035ceb4d8"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0eeef8478f0cf169d44283a6be7e0c9665cd2f25f538bfaa8e12195d03a3ea91","downloaded_from":"2026-09-09T23:54:33.465Z","last_downloaded_at":"2026-09-09T23:54:33.465Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483032","source_sha256":"08767e57f029de2acd87a5e29be6d943cb2214c6c53457f58589645035ceb4d8"}},{"block":null,"heading":"Planned Major Maintenance Activities","paragraphs":[{"citation":"340-10-45-2","para":"45-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">See paragraphs <a href=\"/asc/360/10/#360-10-45-1\" class=\"xref\">360-10-45-1</a> and <a href=\"/asc/360/908/#360-908-45-2\" class=\"xref\">908-360-45-2</a> for a discussion of the consistent application of the method of accounting for planned major maintenance activities.</div></div>","snippet":"See paragraphs 360-10-45-1 and 908-360-45-2 for a discussion of the consistent application of the method of accounting for planned major maintenance activities.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:78ec70ec7475fa8f94d0dd64adb456c0d11fe750b91e40869ad97c03eaaf18e1","downloaded_from":"2026-09-09T23:54:33.465Z","last_downloaded_at":"2026-09-09T23:54:33.465Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483032","source_sha256":"08767e57f029de2acd87a5e29be6d943cb2214c6c53457f58589645035ceb4d8"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5e9c7979e487a2f34944a04af35dba9524ee54fc8017e1fa7008f5951421b94d","downloaded_from":"2026-09-09T23:54:33.465Z","last_downloaded_at":"2026-09-09T23:54:33.465Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483032","source_sha256":"08767e57f029de2acd87a5e29be6d943cb2214c6c53457f58589645035ceb4d8"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:628ae6a0691a10bf22ddd5295f71ab94ac3917d8d414138156578cfe6d546d1c","downloaded_from":"2026-09-09T23:54:33.465Z","last_downloaded_at":"2026-09-09T23:54:33.465Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483032","source_sha256":"08767e57f029de2acd87a5e29be6d943cb2214c6c53457f58589645035ceb4d8"}},{"number":"55","label":"55 Implementation Guidance and Illustrations","anchor":"55-implementation-guidance-and-illustrations","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"340-10-55-1","para":"55-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <a href=\"/updates/page-1833002/\" class=\"xref\">Paragraph not used</a>.</div> </div>","snippet":"Paragraph not used.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1604c9ab3445bf538c7a03ca48804908658943ca455addeeb0a782033e9d733a","downloaded_from":"2026-09-09T23:54:35.789Z","last_downloaded_at":"2026-09-09T23:54:35.789Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483007","source_sha256":"5604a9caeadf21a686e2c954f43c2751e454de8f39b92a5151d2dd22dc45fa7e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f08e749d8a8f29678e9ac6c582623d4bc3fea8c7b9c6d4903b49ccbf8560c0d1","downloaded_from":"2026-09-09T23:54:35.789Z","last_downloaded_at":"2026-09-09T23:54:35.789Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483007","source_sha256":"5604a9caeadf21a686e2c954f43c2751e454de8f39b92a5151d2dd22dc45fa7e"}},{"block":null,"heading":"Illustrations","paragraphs":[{"citation":"340-10-55-2","para":"55-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Example illustrates the recognition guidance in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/340/10/#340-10-25-1\" class=\"xref\">340-10-25-1 through 25-3</a></div>. <span class=\"sfragment\" id=\"sfr_656AE46D-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It is also assumed that the supply arrangement is legally enforceable. </span></span><span class=\"sfragment\" id=\"sfr_656AE598-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity enters into a long-term arrangement with a supplier in which the entity agrees to reimburse the supplier for preproduction design and development costs incurred under the arrangement, up to a maximum reimbursement of $1,000,000. </span></span><span class=\"sfragment\" id=\"sfr_656AE6CE-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Under this arrangement, the amount of reimbursement for design and development costs can be objectively measured and verified. The supplier shall recognize the design and development costs as an asset as costs are incurred, up to a maximum of $1,000,000. </span></span></div> </div>","snippet":"This Example illustrates the recognition guidance in paragraphs 340-10-25-1 through 25-3. It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It i…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7a2ca96e29141f37075d1c3fa1a35cae09b66ddd29fedb73678f82b5a11f3e4e","downloaded_from":"2026-09-09T23:54:35.789Z","last_downloaded_at":"2026-09-09T23:54:35.789Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483007","source_sha256":"5604a9caeadf21a686e2c954f43c2751e454de8f39b92a5151d2dd22dc45fa7e"}},{"citation":"340-10-55-3","para":"55-3","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Example illustrates the recognition guidance in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/340/10/#340-10-25-1\" class=\"xref\">340-10-25-1 through 25-3</a></div>. <span class=\"sfragment\" id=\"sfr_656AE7C5-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It is also assumed that the supply arrangement is legally enforceable. </span></span><span class=\"sfragment\" id=\"sfr_656AE937-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity enters into a long-term arrangement with a supplier in which the entity agrees to pay the supplier $55 per part for the first 200,000 parts produced and $50 for every part thereafter. No agreement exists concerning reimbursement of the supplier's design and development costs if fewer than 200,000 parts are produced under the arrangement. </span></span><span class=\"sfragment\" id=\"sfr_656AEA4C-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Under this arrangement, the amount of reimbursement for design and development costs cannot be objectively measured and verified. The supplier shall expense the preproduction design and development costs as incurred. </span></span></div> </div>","snippet":"This Example illustrates the recognition guidance in paragraphs 340-10-25-1 through 25-3. It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It i…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e492d100ab17b43659ed185afdaf263aab7be511d18f7e3a46cf963f5d549d72","downloaded_from":"2026-09-09T23:54:35.789Z","last_downloaded_at":"2026-09-09T23:54:35.789Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483007","source_sha256":"5604a9caeadf21a686e2c954f43c2751e454de8f39b92a5151d2dd22dc45fa7e"}},{"citation":"340-10-55-4","para":"55-4","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Example illustrates the recognition guidance in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/340/10/#340-10-25-1\" class=\"xref\">340-10-25-1 through 25-3</a></div>. <span class=\"sfragment\" id=\"sfr_656AEB68-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It is also assumed that the supply arrangement is legally enforceable. </span></span><span class=\"sfragment\" id=\"sfr_656AEC57-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity enters into a long-term arrangement with a supplier in which the entity agrees to pay the supplier $55 per part for the first 200,000 parts produced and $50 for every part thereafter. The arrangement provides that if fewer than 200,000 parts are produced, the supplier will be reimbursed for design and development costs incurred under the arrangement, up to a maximum reimbursement of $1,000,000 reduced by $5 per part for each part produced under the supply arrangement. For example, if 190,000 parts are produced under the supply arrangement, in addition to the $55 per part received for the parts produced, the supplier would be reimbursed for design and development costs incurred under the arrangement, up to a maximum of $50,000 [$1,000,000 - ($5 X 190,000)]. </span></span><span class=\"sfragment\" id=\"sfr_656AED32-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Under this agreement, the amount of reimbursement for design and development costs can be objectively measured and verified. The supplier shall recognize the design and development costs as an asset as costs are incurred, up to a maximum of $1,000,000. </span></span></div> </div>","snippet":"This Example illustrates the recognition guidance in paragraphs 340-10-25-1 through 25-3. It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It i…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:be0030735087fe29b9cf338dc22cba157b8e4822dbf69b470a4b0bfaa6c92839","downloaded_from":"2026-09-09T23:54:35.789Z","last_downloaded_at":"2026-09-09T23:54:35.789Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483007","source_sha256":"5604a9caeadf21a686e2c954f43c2751e454de8f39b92a5151d2dd22dc45fa7e"}},{"citation":"340-10-55-5","para":"55-5","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Example illustrates the recognition guidance in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/340/10/#340-10-25-1\" class=\"xref\">340-10-25-1 through 25-3</a></div>. <span class=\"sfragment\" id=\"sfr_656AEE1C-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It is also assumed that the supply arrangement is legally enforceable. </span></span><span class=\"sfragment\" id=\"sfr_656AEEEB-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity enters into a long-term arrangement with a supplier in which the entity agrees to pay the supplier $52.50 per part. The arrangement requires that a minimum of 400,000 parts be produced. If fewer than 400,000 parts are produced under the arrangement, the supplier will receive a payment of $52.50 per part not produced under the arrangement, up to a maximum of 400,000 parts. </span></span><span class=\"sfragment\" id=\"sfr_656AEFB5-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Under this arrangement, the amount of reimbursement for design and development costs cannot be objectively measured and verified. The supplier shall expense the design and development costs as incurred. </span></span></div> </div>","snippet":"This Example illustrates the recognition guidance in paragraphs 340-10-25-1 through 25-3. It is assumed that the design and development costs would be expensed under that guidance absent a reimbursement arrangement. It i…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f25cdc611a3e1804897c606c636f80f0e8850f0a2df65ef550520d2d76b21708","downloaded_from":"2026-09-09T23:54:35.789Z","last_downloaded_at":"2026-09-09T23:54:35.789Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483007","source_sha256":"5604a9caeadf21a686e2c954f43c2751e454de8f39b92a5151d2dd22dc45fa7e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cd3f6e8771124eca6edca193953fb5dae64b852f8d04432252f1563e451cee79","downloaded_from":"2026-09-09T23:54:35.789Z","last_downloaded_at":"2026-09-09T23:54:35.789Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483007","source_sha256":"5604a9caeadf21a686e2c954f43c2751e454de8f39b92a5151d2dd22dc45fa7e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:074dbcb089d024fd98e446aa003e8ddee81de9822eb2f9b89391cded6a3cc940","downloaded_from":"2026-09-09T23:54:35.789Z","last_downloaded_at":"2026-09-09T23:54:35.789Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483007","source_sha256":"5604a9caeadf21a686e2c954f43c2751e454de8f39b92a5151d2dd22dc45fa7e"}},{"number":"60","label":"60 Relationships","anchor":"60-relationships","is_sec":false,"groups":[{"block":null,"heading":"Receivables","paragraphs":[{"citation":"340-10-60-1","para":"60-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">For accounting for nonrefundable fees and costs associated with lending, committing to lend, or purchasing a group of loans, see Subtopic <a altsource=\"GUID-3B8EB2BA-D375-41D5-B2C1-DDCEAE2C53D7.ditamap\" class=\"ditamap\">310-20</a>.</div> </div>","snippet":"For accounting for nonrefundable fees and costs associated with lending, committing to lend, or purchasing a group of loans, see Subtopic 310-20.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3cefa1549e14f1a7f0aee8272dcbfe4f4e97efe289f20e6611c1a237ded00b10","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4dca8567a5a06b0f16993e811c07be401028008c4c72ec3ed46daa4d10c4435f","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"block":null,"heading":"Intangibles—Goodwill and Other","paragraphs":[{"citation":"340-10-60-2","para":"60-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">For capitalization of internal and external costs incurred to develop internal-use computer software, see Sections <a altsource=\"GUID-A6E518F8-5A6D-4476-868A-3F496391164C.ditamap\" class=\"ditamap\">350-40-25</a> and <a altsource=\"GUID-FCF6DF87-D2B4-45B7-AFE8-CAF89EE24F5A.ditamap\" class=\"ditamap\">350-40-30</a>.</div> </div>","snippet":"For capitalization of internal and external costs incurred to develop internal-use computer software, see Sections 350-40-25 and 350-40-30.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1db3fbf1fd1bcd4ba4a600a07c767c362beb9d7d7132c605af38ee3949be97a4","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1fc2192913afac4f2ebba835208006979d27a05e3a607896a8d97c8b91442f5a","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"block":null,"heading":"Asset Retirement and Environmental Obligations","paragraphs":[{"citation":"340-10-60-3","para":"60-3","html":"<div class=\"asc-body\"><div class=\"norm-text\">For capitalization of costs incurred to treat asbestos, see Section <a altsource=\"GUID-A494E577-1661-44A4-9074-A036275390A8.ditamap\" class=\"ditamap\">410-30-45</a> and paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/410/30/#410-30-25-17\" class=\"xref\">410-30-25-17 through 25-18</a></div>.</div> </div>","snippet":"For capitalization of costs incurred to treat asbestos, see Section 410-30-45 and paragraphs 410-30-25-17 through 25-18.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dc1f9b86aa01bf591a41f79bc652f36e4e09c7c3be35d706e7ba6d38bc8aab21","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"citation":"340-10-60-4","para":"60-4","html":"<div class=\"asc-body\"><div class=\"norm-text\">For accounting criteria for environmental contamination treatment costs, see paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/410/30/#410-30-25-16\" class=\"xref\">410-30-25-16 through 25-19</a></div>.</div> </div>","snippet":"For accounting criteria for environmental contamination treatment costs, see paragraphs 410-30-25-16 through 25-19.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c8f2b2bd17951227e88cfc7ab45a5ff79f1c5511de94f752fd56c31df6b8594d","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"citation":"340-10-60-5","para":"60-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-09</a>.</div> </div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-09.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:371ad06fa8a33a58e237b00d0ad6677e7a0d2c6dc143fc82cb34d242b3a97543","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"citation":"340-10-60-6","para":"60-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-09</a>.</div> </div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-09.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:85b886da58aa74bb7341740d38cd99e4a403461f20e039b4a098a183a488e4d0","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ecb3d5a67035a5def3fcfd85884881efd0a806784759d8918e45b084e36bcb2a","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"block":null,"heading":"Other Expenses","paragraphs":[{"citation":"340-10-60-7","para":"60-7","html":"<div class=\"asc-body\"><div class=\"norm-text\">For accounting for the cost of business process reengineering activities, see Subtopic <a altsource=\"GUID-8E6ABB46-F097-499F-9672-69A704A5D98D.ditamap\" class=\"ditamap\">720-45</a>.</div> </div>","snippet":"For accounting for the cost of business process reengineering activities, see Subtopic 720-45.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:190e458bfe8066d4ff58f8375f494f9e12a7e205fa22b995a4a8c740e3556878","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"citation":"340-10-60-8","para":"60-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-09</a>.</div> </div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-09.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0a608d620961c2e48d7ec4beb84e84db8b7950f5fe1a76021ac90be58c4376fe","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"citation":"340-10-60-9","para":"60-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <a href=\"/updates/asu-2014-10/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-10</a>.</div> </div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-10.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d82673a6c51aaf8a281f35b15c721029602bc74a94ab94161699eb5f6ffefb60","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f793ab1044b2ba3fb04abbca403624df30e322a0c0207d840a312ed82791a407","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"block":null,"heading":"Entertainment—Cable Television","paragraphs":[{"citation":"340-10-60-10","para":"60-10","html":"<div class=\"asc-body\"><div class=\"norm-text\">For capitalization and subsequent measurement of initial subscriber installation costs, see Section <a altsource=\"GUID-C5584A24-2FA9-407A-8509-0C49C1045E2B.ditamap\" class=\"ditamap\">922-360-35</a>.</div> </div>","snippet":"For capitalization and subsequent measurement of initial subscriber installation costs, see Section 922-360-35.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:eb7fe691aa80b04d6ab30a3f85262e816a37b8a92784ef80c1b34a1e026b5a32","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d5f425d4b37d51616f6875aa419974d1104a37132c309a57871b590d9748aded","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"block":null,"heading":"Entertainment—Music","paragraphs":[{"citation":"340-10-60-11","para":"60-11","html":"<div class=\"asc-body\"><div class=\"norm-text\">For reporting of an advance royalty to an artist as an asset, see paragraph <a href=\"/asc/340/928/#340-928-25-1\" class=\"xref\">928-340-25-1</a>.</div> </div>","snippet":"For reporting of an advance royalty to an artist as an asset, see paragraph 928-340-25-1.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:25c2738c503c94aedb05db36170596b30cc81a4a662e9381545f620ef95dab8e","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3cbce0e960b1958ec7ca12c0a42efe8c61866d15f1705be18980dd1abead238d","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"block":null,"heading":"Financial Services—Brokers and Dealers","paragraphs":[{"citation":"340-10-60-12","para":"60-12","html":"<div class=\"asc-body\"><div class=\"norm-text\">For consideration of a membership as an asset by broker dealers, see Section <a altsource=\"GUID-C498E71D-A9E9-4E55-BCEC-E27918B32C60.ditamap\" class=\"ditamap\">940-340-25</a>.</div> </div>","snippet":"For consideration of a membership as an asset by broker dealers, see Section 940-340-25.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:580b94d5ff2a958a481086bd4e9ba24a625a58899dc5ba47dd6683a85edd3735","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"citation":"340-10-60-13","para":"60-13","html":"<div class=\"asc-body\"><div class=\"norm-text\">For accounting guidance for underwriting expenses by broker dealers, see Sections <a altsource=\"GUID-753043C9-F028-4A1E-821F-7D3F579C51C8.ditamap\" class=\"ditamap\">940-20-25</a> and <a altsource=\"GUID-8AB6E753-8B35-4EDA-A703-50EF2ADB17EF.ditamap\" class=\"ditamap\">940-20-35</a>.</div> </div>","snippet":"For accounting guidance for underwriting expenses by broker dealers, see Sections 940-20-25 and 940-20-35.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6c7dcb3ce00bb5e3459fd04051187a1631585e6c9fbbd7a40fc28007622a9406","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"citation":"340-10-60-14","para":"60-14","html":"<div class=\"asc-body\"><div class=\"norm-text\">For accounting guidance for distribution fees by broker dealers, see Subtopic <a altsource=\"GUID-83E79DA9-23B2-4BBD-9984-561F05EF27F5.ditamap\" class=\"ditamap\">940-340</a>.</div> </div>","snippet":"For accounting guidance for distribution fees by broker dealers, see Subtopic 940-340.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3df861dc2ee1e9b6917dce8d8004052ed5529352072de8481aa140726c541aaf","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f59323079e5b8baa54f8717c3c4a30d6585199d0443907b33dc8b18a3bffac4e","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"block":null,"heading":"Financial Services—Investment Companies","paragraphs":[{"citation":"340-10-60-15","para":"60-15","html":"<div class=\"asc-body\"><div class=\"norm-text\">For accounting for offering costs by investment companies, see Subtopic <a altsource=\"GUID-6D5FA5A3-7C53-45FD-9AD8-A0F80CFA230C.ditamap\" class=\"ditamap\">946-20</a>.</div> </div>","snippet":"For accounting for offering costs by investment companies, see Subtopic 946-20.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c8a44cd7575f48fde53e02504a9a94ec1ba19ee10eb62caa1834192c269dbe27","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4b54f2ce092edb5ad4c48d66cc0d509050c936790e9bd8788314ec5a688092cb","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"block":null,"heading":"Financial Services—Title Plant","paragraphs":[{"citation":"340-10-60-16","para":"60-16","html":"<div class=\"asc-body\"><div class=\"norm-text\">For capitalization guidance for costs incurred to construct a title plant, see paragraph <a href=\"/asc/350/950/#350-950-30-1\" class=\"xref\">950-350-30-1</a>.</div> </div>","snippet":"For capitalization guidance for costs incurred to construct a title plant, see paragraph 950-350-30-1.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d2859ceb9936e9312f2ed2c114bd02998501f2cba44b09cb75bb16381840d551","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9842da8e0cddc2292d4d16632a9cf5f81073ebb2c01ac806b6682929901a0b7b","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"block":null,"heading":"Software","paragraphs":[{"citation":"340-10-60-17","para":"60-17","html":"<div class=\"asc-body\"><div class=\"norm-text\">For accounting for the costs of computer software to be sold, leased, or otherwise marketed, see Subtopic <a altsource=\"GUID-3C16B9D3-1B59-4D15-87B4-B1B9578AD509.ditamap\" class=\"ditamap\">985-20</a>.</div> </div>","snippet":"For accounting for the costs of computer software to be sold, leased, or otherwise marketed, see Subtopic 985-20.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3e1b88f08c3778db8827a62ebd1c33345a684ef463e76848f64e632d5ecab8a7","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c719193ae7df39a01a6557866609a79054b17bc932132a06dbe22db0c141c049","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6214a7e5cc9a9e26d2be9bbbe4dce485fefd4c14273ebcd874d7e501bb011eea","downloaded_from":"2026-09-09T23:54:39.128Z","last_downloaded_at":"2026-09-09T23:54:39.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482982","source_sha256":"100fb827955474219c36f4c3571aef4518f67bfd177cec2c15798a6765851194"}},{"number":"S00","label":"SEC 00 Status","anchor":"sec-00-status","is_sec":true,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"340-10-S00-1","para":"S00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" id=\"SL6955237-166755\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/340/10/#340-10-S99-2\" class=\"xref\">340-10-S99-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2012-03/\" class=\"xref\">Accounting Standards Update No. 2012-03</a></td><td class=\"entry\">08/27/2012</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/10/#340-10-S99-2\" class=\"xref\">340-10-S99-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2010-22/\" class=\"xref\">Accounting Standards Update No. 2010-22</a></td><td class=\"entry\">08/19/2010</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\n340-10-S99-2 | Amended | Accounting Standards Update No. 2012-03 | 08/27/2012 |\n340-10-S…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a3a99568c949540160d30989cba599e54f0f06a65707072815a070c9f70d8600","downloaded_from":"2026-09-09T23:54:45.903Z","last_downloaded_at":"2026-09-09T23:54:45.903Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480551","source_sha256":"30b286462343e62a74e0a603ee2710c957a1f81a8225d3a4ae01bde93ba21cbd"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ae1a966b67bd7c038ece8928476b71e367015d7dc6e6abb2406e7bdd50f925e6","downloaded_from":"2026-09-09T23:54:45.903Z","last_downloaded_at":"2026-09-09T23:54:45.903Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480551","source_sha256":"30b286462343e62a74e0a603ee2710c957a1f81a8225d3a4ae01bde93ba21cbd"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b1f028dda54e17c1e4f05b650b070d70bd887e9f82a7ee01d614086c46b93761","downloaded_from":"2026-09-09T23:54:45.903Z","last_downloaded_at":"2026-09-09T23:54:45.903Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480551","source_sha256":"30b286462343e62a74e0a603ee2710c957a1f81a8225d3a4ae01bde93ba21cbd"}},{"number":"S25","label":"SEC 25 Recognition","anchor":"sec-25-recognition","is_sec":true,"groups":[{"block":null,"heading":"Expenses Incurred Before the Effective Date of an Offering of Equity Securities","paragraphs":[{"citation":"340-10-S25-1","para":"S25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_65C2A302-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/340/10/#340-10-S99-1\" class=\"xref\">340-10-S99-1</a>, SAB Topic 5.A, for SEC Staff views on deferral of costs related to an equity offering incurred before the effective date of the offering. </span></span></div></div>","snippet":"See paragraph 340-10-S99-1, SAB Topic 5.A, for SEC Staff views on deferral of costs related to an equity offering incurred before the effective date of the offering.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:823a5986e47ade756e4e3fa4aca0e22e8f7fa78b34cbf34070d7a2cc0d5e74dd","downloaded_from":"2026-09-09T23:54:48.227Z","last_downloaded_at":"2026-09-09T23:54:48.227Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480519","source_sha256":"bb8736589f89d9adb4cf0bc4de750f66c6cfdfafe32bb76fe4e3eedbe3c47d02"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:71573dbc27be94e1b3c05aec9ce053710a35cf27a61c3d5b7a6fb5f52dcf28d0","downloaded_from":"2026-09-09T23:54:48.227Z","last_downloaded_at":"2026-09-09T23:54:48.227Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480519","source_sha256":"bb8736589f89d9adb4cf0bc4de750f66c6cfdfafe32bb76fe4e3eedbe3c47d02"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3fefaebc6f762524fa1a4d17efd1b04e6ef4ad392161cd8dea61da1269f8945e","downloaded_from":"2026-09-09T23:54:48.227Z","last_downloaded_at":"2026-09-09T23:54:48.227Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480519","source_sha256":"bb8736589f89d9adb4cf0bc4de750f66c6cfdfafe32bb76fe4e3eedbe3c47d02"}},{"number":"S30","label":"SEC 30 Initial Measurement","anchor":"sec-30-initial-measurement","is_sec":true,"groups":[{"block":null,"heading":"Debt Issue Costs in Conjunction with a Business Combination","paragraphs":[{"citation":"340-10-S30-1","para":"S30-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_65CC932F-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/340/10/#340-10-S99-2\" class=\"xref\">340-10-S99-2</a>, SAB Topic 2.A.6, Question 1, for SEC Staff views on accounting for debt issues costs paid to an investment banker in connection with a business combination. </span></span></div></div>","snippet":"See paragraph 340-10-S99-2, SAB Topic 2.A.6, Question 1, for SEC Staff views on accounting for debt issues costs paid to an investment banker in connection with a business combination.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:aba87285f991f334f3cad7684dc231f6f9bc447c0bfcf895416f4190e2a61d67","downloaded_from":"2026-09-09T23:54:49.884Z","last_downloaded_at":"2026-09-09T23:54:49.884Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480488","source_sha256":"662cdff204864e8812d52cc52fd95cb3ebfacc6392f90f11c04237fddad45dfb"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9e96c97757f127ff1bee65d5592a78d16abad57a4ea4678d8ca1b40605759428","downloaded_from":"2026-09-09T23:54:49.884Z","last_downloaded_at":"2026-09-09T23:54:49.884Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480488","source_sha256":"662cdff204864e8812d52cc52fd95cb3ebfacc6392f90f11c04237fddad45dfb"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6679bf6624038297b8aebbaa725cc1e2321fb45dfb4d58c76002bc08aa4ebb0c","downloaded_from":"2026-09-09T23:54:49.884Z","last_downloaded_at":"2026-09-09T23:54:49.884Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480488","source_sha256":"662cdff204864e8812d52cc52fd95cb3ebfacc6392f90f11c04237fddad45dfb"}},{"number":"S35","label":"SEC 35 Subsequent Measurement","anchor":"sec-35-subsequent-measurement","is_sec":true,"groups":[{"block":null,"heading":"Debt Issue Costs in Conjunction with a Business Combination","paragraphs":[{"citation":"340-10-S35-1","para":"S35-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_65D8EA95-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/340/10/#340-10-S99-2\" class=\"xref\">340-10-S99-2</a>, SAB Topic 2.A.6, Question 1, for SEC Staff views on the amortization of debt issue costs for interim \"bridge financing.\" </span></span></div></div>","snippet":"See paragraph 340-10-S99-2, SAB Topic 2.A.6, Question 1, for SEC Staff views on the amortization of debt issue costs for interim \"bridge financing.\"","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a4095b3194c82df802046c5fef70bfc2c2967c7b2157fc11c635a0a3777f2f71","downloaded_from":"2026-09-09T23:54:51.546Z","last_downloaded_at":"2026-09-09T23:54:51.546Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480458","source_sha256":"c993b9330a7f3240a921de3caea20f1cf4920ca13e3f7d0cfea28aaf759ceae4"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1d98df3dab94d2d460c3654d30c1e32a3078eeeaa6c77b7a4c8e89003ee7eea7","downloaded_from":"2026-09-09T23:54:51.546Z","last_downloaded_at":"2026-09-09T23:54:51.546Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480458","source_sha256":"c993b9330a7f3240a921de3caea20f1cf4920ca13e3f7d0cfea28aaf759ceae4"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ce6bfc1ca0c75ee0be2c1521922a2d6262fc016680e741448509dc5ceacdeacd","downloaded_from":"2026-09-09T23:54:51.546Z","last_downloaded_at":"2026-09-09T23:54:51.546Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480458","source_sha256":"c993b9330a7f3240a921de3caea20f1cf4920ca13e3f7d0cfea28aaf759ceae4"}},{"number":"S45","label":"SEC 45 Other Presentation Matters","anchor":"sec-45-other-presentation-matters","is_sec":true,"groups":[{"block":null,"heading":"Balance Sheet Presentation of Deferred Charges","paragraphs":[{"citation":"340-10-S45-1","para":"S45-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_65E21D76-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/210/10/#210-10-S99-1\" class=\"xref\">210-10-S99-1</a>, Regulation S-X Rule 5-02.17, for required balance sheet presentation for deferred charges and other assets. </span></span></div></div>","snippet":"See paragraph 210-10-S99-1, Regulation S-X Rule 5-02.17, for required balance sheet presentation for deferred charges and other assets.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3e4acf8d75e83d9f78a376b4e424f8e3df2832e731d6e0737674fe6eb3b4a00e","downloaded_from":"2026-09-09T23:54:55.217Z","last_downloaded_at":"2026-09-09T23:54:55.217Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480432","source_sha256":"c430b09b72f2f5d346e205f56407814c5b6898a2bbe475de0ef67f2494a0a0ce"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:298a61cd9130589b800089949d17acdd72b47b573fdda3211ae388757dfea654","downloaded_from":"2026-09-09T23:54:55.217Z","last_downloaded_at":"2026-09-09T23:54:55.217Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480432","source_sha256":"c430b09b72f2f5d346e205f56407814c5b6898a2bbe475de0ef67f2494a0a0ce"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0fa6f2639ba6da98d2228087592de15b00075f4bc1bebf53d4a69e3a787efb5d","downloaded_from":"2026-09-09T23:54:55.217Z","last_downloaded_at":"2026-09-09T23:54:55.217Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480432","source_sha256":"c430b09b72f2f5d346e205f56407814c5b6898a2bbe475de0ef67f2494a0a0ce"}},{"number":"S50","label":"SEC 50 Disclosure","anchor":"sec-50-disclosure","is_sec":true,"groups":[{"block":null,"heading":"Pre-Production Costs Related to Long-Term Supply Agreements","paragraphs":[{"citation":"340-10-S50-1","para":"S50-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_65ED742A-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/340/10/#340-10-S99-3\" class=\"xref\">340-10-S99-3</a>, SEC Observer Comment: Accounting for Pre-Production Costs Related to Long-Term Supply Arrangements, for SEC Staff views on disclosure of accounting policy and other matters pertaining to pre-production design and development costs. </span></span></div></div>","snippet":"See paragraph 340-10-S99-3, SEC Observer Comment: Accounting for Pre-Production Costs Related to Long-Term Supply Arrangements, for SEC Staff views on disclosure of accounting policy and other matters pertaining to pre-p…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bc7531133ae9f44bedfc627abe46ecf642e82bb663e1c877b9a6075e5765731d","downloaded_from":"2026-09-09T23:54:58.602Z","last_downloaded_at":"2026-09-09T23:54:58.602Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480402","source_sha256":"cf4e8d8e138308663f4f46a457feb9d4931b20945b39f3300fe2cb51cd3fc767"}},{"citation":"340-10-S50-2","para":"S50-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_65ED755A-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/210/10/#210-10-S99-1\" class=\"xref\">210-10-S99-1</a>, Regulation S-X Rule 5-02.17, for the requirement to disclose policy for deferral and amortization of deferred costs. </span></span></div></div>","snippet":"See paragraph 210-10-S99-1, Regulation S-X Rule 5-02.17, for the requirement to disclose policy for deferral and amortization of deferred costs.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:805e522708d5bd8a47b02a6de91603b1a0ec3b809375058a412c9b92c8e1c39a","downloaded_from":"2026-09-09T23:54:58.602Z","last_downloaded_at":"2026-09-09T23:54:58.602Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480402","source_sha256":"cf4e8d8e138308663f4f46a457feb9d4931b20945b39f3300fe2cb51cd3fc767"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5b041f803e28e21c8db9d8ed44c52af2b5a95e5ff6bbc4e2484b37f7f52de9df","downloaded_from":"2026-09-09T23:54:58.602Z","last_downloaded_at":"2026-09-09T23:54:58.602Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480402","source_sha256":"cf4e8d8e138308663f4f46a457feb9d4931b20945b39f3300fe2cb51cd3fc767"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:66991a5cb3df6c73aa94835c47ba313b2384d485ecc8c9f99f8589ee8b1c4744","downloaded_from":"2026-09-09T23:54:58.602Z","last_downloaded_at":"2026-09-09T23:54:58.602Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480402","source_sha256":"cf4e8d8e138308663f4f46a457feb9d4931b20945b39f3300fe2cb51cd3fc767"}},{"number":"S99","label":"SEC 99 SEC Materials","anchor":"sec-99-sec-materials","is_sec":true,"groups":[{"block":null,"heading":"SEC Staff Guidance","paragraphs":[{"citation":"340-10-S99-1","para":"S99-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following is the text of SAB Topic 5.A, Expenses of Offering.<ul class=\"ul simple\" id=\"d3e105021-122735__GUID-B88A43F2-9209-4328-A23C-BCA62C513D89\"><li class=\"li\" id=\"d3e105021-122735__SL6387328-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608E792-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Facts: Prior to the effective date of an offering of equity securities, Company Y incurs certain expenses related to the offering. </span></span></div></li><li class=\"li\" id=\"d3e105021-122735__SL6387329-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608E953-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Question: Should such costs be deferred? </span></span></div></li><li class=\"li\" id=\"d3e105021-122735__SL6387330-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608EAB8-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Interpretive Response: Specific incremental costs directly attributable to a proposed or actual offering of securities may properly be deferred and charged against the gross proceeds of the offering. However, management salaries or other general and administrative expenses may not be allocated as costs of the offering and deferred costs of an aborted offering may not be deferred and charged against proceeds of a subsequent offering. A short postponement (up to 90 days) does not represent an aborted offering. </span></span></div></li></ul></div></div>","snippet":"The following is the text of SAB Topic 5.A, Expenses of Offering.\nFacts: Prior to the effective date of an offering of equity securities, Company Y incurs certain expenses related to the offering.\nQuestion: Should such c…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b20163ac5d676ada1468c80292be4a5b99417acf0520498eaa486ab0c8c5d58b","downloaded_from":"2026-09-09T23:55:04.724Z","last_downloaded_at":"2026-09-09T23:55:04.724Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480341","source_sha256":"d80074bb686cca4f96ded8d0f27405006f313383b3b2c40ed6d3a69c1cecc2f6"}},{"citation":"340-10-S99-2","para":"S99-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following is the text of SAB Topic 2.A.6, Debt Issue Costs in Conjunction with a Business Combination.<ul class=\"ul simple\" id=\"d3e105045-122735__GUID-3781EB1B-2867-4DD6-9209-537ECD5BAF08\"><li class=\"li\" id=\"d3e105045-122735__SL6387331-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608EC1C-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Facts: Company A is to acquire the net assets of Company B in a transaction to be accounted for as a business combination. In connection with the transaction, Company A has retained an investment banker to provide advisory services in structuring the acquisition and to provide the necessary financing. It is expected that the acquisition will be financed on an interim basis using \"bridge financing\" provided by the investment banker. Permanent financing will be arranged at a later date through a debt offering, which will be underwritten by the investment banker. Fees will be paid to the investment banker for the advisory services, the bridge financing and the underwriting of the permanent financing. These services may be billed separately or as a single amount. </span></span></div></li><li class=\"li\" id=\"d3e105045-122735__SL6387332-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608ED62-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Question 1: Should total fees paid to the investment banker for acquisition-related services and the issuance of debt securities be allocated between the services received?</span></span></div></li><li class=\"li\" id=\"d3e105045-122735__SL6387333-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608EEB5-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Interpretive Response: Yes. Fees paid to an investment banker in connection with a business combination or asset acquisition, when the investment banker is also providing interim financing or underwriting services, must be allocated between acquisition related services and debt issue costs. </span></span></div></li><li class=\"li\" id=\"d3e105045-122735__SL6956155-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608F10A-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">When an investment banker provides services in connection with a business combination or asset acquisition and also provides underwriting services associated with the issuance of debt or equity securities, the total fees incurred by an entity should be allocated between the services received on a relative fair value basis. The objective of the allocation is to ascribe the total fees incurred to the actual services provided by the investment banker. </span></span></div></li><li class=\"li\" id=\"d3e105045-122735__SL27047682-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608F263-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">FASB ASC Topic <a altsource=\"GUID-2E207482-2F2C-41D3-ADA4-A53A3509B10F.ditamap\" class=\"ditamap\">805</a>, Business Combinations, provides guidance for the portion of the costs that represent acquisition-related services. The portion of the costs pertaining to the issuance of debt or equity securities should be accounted for in accordance with other applicable GAAP.</span></span></div></li><li class=\"li\" id=\"d3e105045-122735__SL6387339-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608F39B-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Question 2: May the debt issue costs of the interim \"bridge financing\" be amortized over the anticipated combined life of the bridge and permanent financings? </span></span></div></li><li class=\"li\" id=\"d3e105045-122735__SL6387340-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608F4E0-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Interpretive Response: No. Debt issue costs should be amortized by the interest method over the life of the debt to which they relate. Debt issue costs related to the bridge financing should be recognized as interest cost during the estimated interim period preceding the placement of the permanent financing with any unamortized amounts charged to expense if the bridge loan is repaid prior to the expiration of the estimated period. Where the bridged financing consists of increasing rate debt, the guidance issued in FASB ASC Topic <a altsource=\"GUID-F9E1ACC7-8D93-4213-900A-326F9DC4F589.ditamap\" class=\"ditamap\">470</a>, Debt, should be followed. <sup class=\"ph sup\">FN1</sup> </span></span></div><ul class=\"ul simple\" id=\"d3e105045-122735__GUID-62833F32-87F0-4938-8348-487B7B2C1713\"><li class=\"li\" id=\"d3e105045-122735__SL6387341-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608F631-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">FN1 As noted in FASB ASC paragraph <a href=\"/asc/470/10/#470-10-35-2\" class=\"xref\">470-10-35-2</a>, the term-extending provisions of the debt instrument should be analyzed to determine whether they constitute an embedded derivative requiring separate accounting in accordance with FASB ASC Topic <a altsource=\"GUID-128369CC-8E3A-4A7E-8F25-33E42B0761E4.ditamap\" class=\"ditamap\">815</a>, Derivatives and Hedging.</span></span></div></li></ul></li></ul></div></div>","snippet":"The following is the text of SAB Topic 2.A.6, Debt Issue Costs in Conjunction with a Business Combination.\nFacts: Company A is to acquire the net assets of Company B in a transaction to be accounted for as a business com…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f7bd69ee56bd97204b859632f51ed0e3c4e6dff7f819d72fb71fda86a3428ec5","downloaded_from":"2026-09-09T23:55:04.724Z","last_downloaded_at":"2026-09-09T23:55:04.724Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480341","source_sha256":"d80074bb686cca4f96ded8d0f27405006f313383b3b2c40ed6d3a69c1cecc2f6"}},{"citation":"340-10-S99-3","para":"S99-3","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following is the text of SEC Observer Comment: Accounting for Pre-Production Costs Related to Long-Term Supply Arrangements.<ul class=\"ul simple\" id=\"d3e105113-122735__GUID-6AAAF77F-E533-4614-B03E-A7355FBA544E\"><li class=\"li\" id=\"d3e105113-122735__SL6387342-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608F794-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Registrants will be expected to disclose their accounting policy for pre-production design and development costs (paragraph <a href=\"/asc/340/10/#340-10-25-1\" class=\"xref\">340-10-25-1</a>) as well as the aggregate amount of: </span></span></div><ul class=\"ul simple\" id=\"d3e105113-122735__GUID-EB49163B-43BA-4BC8-8AEB-B682CDAE80C5\"><li class=\"li\" id=\"d3e105113-122735__SL6387343-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608F8D7-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">a. Assets recognized pursuant to agreements that provide for contractual reimbursement of pre-production design and development costs </span></span></div></li><li class=\"li\" id=\"d3e105113-122735__SL6387344-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608FA0B-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">b. Assets recognized for molds, dies, and other tools that the supplier owns </span></span></div></li><li class=\"li\" id=\"d3e105113-122735__SL6387345-122735\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_6608FB40-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">c. Assets recognized for molds, dies, and other tools that the supplier does not own. </span></span></div></li></ul></li></ul></div></div>","snippet":"The following is the text of SEC Observer Comment: Accounting for Pre-Production Costs Related to Long-Term Supply Arrangements.\nRegistrants will be expected to disclose their accounting policy for pre-production design …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d103585058bdea9e23626b55fdaac803e047767247d597da1a74e75e6778a212","downloaded_from":"2026-09-09T23:55:04.724Z","last_downloaded_at":"2026-09-09T23:55:04.724Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480341","source_sha256":"d80074bb686cca4f96ded8d0f27405006f313383b3b2c40ed6d3a69c1cecc2f6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fa8dad1465c9ba643f05ddd5453c3056ecafe97ec49e3e1cd3401c28dd400683","downloaded_from":"2026-09-09T23:55:04.724Z","last_downloaded_at":"2026-09-09T23:55:04.724Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480341","source_sha256":"d80074bb686cca4f96ded8d0f27405006f313383b3b2c40ed6d3a69c1cecc2f6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7cb260014a29d9d06fba24329e3c2c29353788851d0fb2c8500fdb1b43b07af0","downloaded_from":"2026-09-09T23:55:04.724Z","last_downloaded_at":"2026-09-09T23:55:04.724Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480341","source_sha256":"d80074bb686cca4f96ded8d0f27405006f313383b3b2c40ed6d3a69c1cecc2f6"}}],"enrichment":{"summary":"ASC 340-10 is the Overall subtopic for Other Assets and Deferred Costs, applicable to all entities. Its substantive guidance is limited to (1) describing prepaid expenses — amounts paid in advance (insurance, interest, rents, taxes, unused royalties, prepaid advertising service, operating supplies) that are used up within the normal operating cycle and classified as current assets — and (2) the recognition rules for preproduction design and development costs incurred under long-term supply arrangements. Costs deferred under other regimes (loan origination costs, internal-use software, environmental costs, broker-dealer and industry costs) are addressed by other Topics cross-referenced in Section 60.","key_points":["Design and development costs for the products themselves to be sold under a long-term supply arrangement shall be expensed as incurred (340-10-25-1).","Design and development costs for molds, dies, and other tools the supplier will own are capitalized as part of those tools, subject to impairment testing under the Impairment or Disposal of Long-Lived Assets Subsections of Subtopic 360-10, unless the tools involve new technology, in which case the costs are expensed under Subtopic 730-10 (340-10-25-1).","Design and development costs for molds, dies, and tools the supplier will not own are capitalized only if the supply arrangement gives the supplier a noncancelable right to use them during the arrangement (while performing); otherwise they are expensed as incurred, including costs incurred before that right is obtained (340-10-25-2).","Costs that would otherwise be expensed are recognized as an asset as incurred if a contractual guarantee for reimbursement exists — a legally enforceable agreement in which the reimbursement amount can be objectively measured and verified (340-10-25-3); Examples 1-4 at 340-10-55-2 through 55-5 illustrate that per-part pricing arrangements without a measurable reimbursement do not qualify.","Prepaid expenses are paid in advance of use, are typically consumed within the normal operating cycle, and are classified as current assets (340-10-05-4 through 05-5; see 210-10-45-2).","The accrue-in-advance (accrual) method of accounting for planned major maintenance activities is prohibited in annual and interim periods (340-10-25-5, referencing 360-10-25-5).","The Topic applies to all entities (340-10-15-2), and long-term prepaid assets are evaluated under the long-lived asset guidance at 360-10-15-4 through 15-5 (340-10-35-1)."],"categories":["Recognition","Inventory and PP&E","Subsequent measurement","Financial statement presentation"],"audience_level":"intermediate","student_note":"The exam trap is assuming all preproduction costs under a supply contract can be deferred: product design and development costs are expensed unless there is a contractual guarantee whose reimbursement amount is objectively measurable and verifiable, and tooling costs are capitalizable only if the supplier owns the tools (non-new-technology) or holds a noncancelable right to use them. Note also that 340-10 is mostly a signpost — specific deferred costs live in other Topics (310-20, 350-40, 340-40, 985-20).","related_topics":["340-40","360-10","730-10","350-40","310-20","210-10"],"key_concepts":["prepaid expenses","preproduction costs","long-term supply arrangement","design and development costs","molds, dies, and other tools","contractual guarantee of reimbursement","noncancelable right to use","planned major maintenance"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ce0a0a5e5e992dca2be5cb064a40e3df377e44aca3d6f45019d839c65b01148f","downloaded_from":"2026-09-09T23:54:15.524Z","last_downloaded_at":"2026-09-09T23:55:04.724Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"730-20","title":"Research and Development Arrangements","topic_title":"Research and Development","score":0.7814,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c8bc29f2b33cd42122615c48bdbcf2cac074c5003f3c71e3d5b392b4d6e285ca","downloaded_from":"2026-09-10T01:14:58.781Z","last_downloaded_at":"2026-09-10T01:15:40.514Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"835-30","title":"Imputation of Interest","topic_title":"Interest","score":0.7809,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bea6dd730957d3de06200e20033b328abc31d1bd368fe00b01e3167ea24b36d2","downloaded_from":"2026-09-10T01:49:32.218Z","last_downloaded_at":"2026-09-10T01:50:15.507Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"440-10","title":"Overall","topic_title":"Commitments","score":0.7772,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:903e4e50db2cbb183e7b6a6d4584b1a7e472572cc8b2654f6dd76cc9815c7cea","downloaded_from":"2026-09-10T00:25:16.890Z","last_downloaded_at":"2026-09-10T00:25:37.457Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"730-10","title":"Overall","topic_title":"Research and Development","score":0.7628,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:07e65ca39a358cb61e979c5786e3d9e96090b9105379557b783faf02096b4933","downloaded_from":"2026-09-10T01:14:28.594Z","last_downloaded_at":"2026-09-10T01:14:54.866Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"310-10","title":"Overall","topic_title":"Receivables","score":0.7614,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:22acb7f979fd9f9b9e8f4c3efb4572a762ded0c905376587fb9fd3134aae3b9e","downloaded_from":"2026-09-09T23:24:42.337Z","last_downloaded_at":"2026-09-09T23:25:40.463Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"985-20","title":"Costs of Software to Be Sold, Leased, or Marketed","topic_title":"Software","score":0.7613,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7c92a370565760b869ec87e958586dc149158a7b50d95fffc13106fe85b81d8b","downloaded_from":"2026-09-10T02:28:26.033Z","last_downloaded_at":"2026-09-10T02:28:54.478Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"330-985","title":"Software","topic_title":"Inventory","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c3618a1ec6ea63aa7238c101e7d3771e5cb10ac1bea0c006911c38b1e1940935","downloaded_from":"2026-09-09T23:53:59.630Z","last_downloaded_at":"2026-09-09T23:54:12.400Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"340-20","title":"Capitalized Advertising Costs","topic_title":"Other Assets and Deferred Costs","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:da4d2422c5ef3fa3f5118d3a8655847423ed63445f6d303619387fef73d1076e","downloaded_from":"2026-09-09T23:55:08.697Z","last_downloaded_at":"2026-09-09T23:55:37.801Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:55b3ac3afa2aa0d128c321b097396c7061a3c9f0b04fcce9df5782b03085e575","downloaded_from":"2026-09-09T23:54:15.524Z","last_downloaded_at":"2026-09-09T23:55:04.724Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}