# ASC 340-915-15: Other Assets and Deferred Costs — Development Stage Entities — 15 Scope and Scope Exceptions

Source: FASB Accounting Standards Codification, Basic View

[Read online](https://asc.understandingaccounting.org/asc/340/915/#15-scope-and-scope-exceptions)

Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.

Tables and mathematical or amendment markup are retained as HTML where Markdown would lose structure.

Source downloaded (UTC): 2026-09-09T23:56:57.307Z to 2026-09-09T23:56:57.307Z

Record version: sha256:b8666cd2822851f7e8ec168ae2adee97c74d05e6f8420ee733ab5a4d94a6a671

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 340-915-15: 15 Scope and Scope Exceptions

[Read section](https://asc.understandingaccounting.org/asc/340/915/#15-scope-and-scope-exceptions)

SEC content: no

##### [340-915-15-1](https://asc.understandingaccounting.org/asc/340/915/#340-915-15-1)

Pending content: no

Source downloaded (UTC): 2026-09-09T23:56:57.307Z to 2026-09-09T23:56:57.307Z

Record version: sha256:82772a1a42c22c5dfcdda3c9693865c41ce82c65f04de802646ca34cee0f55ed

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


[Paragraph superseded by Accounting Standards Update No. 2014-10](https://asc.understandingaccounting.org/updates/asu-2014-10/).
