{"schema_version":2,"canonical_url":"https://asc.understandingaccounting.org/asc/340/970/","source":"FASB Accounting Standards Codification, Basic View","usage":"Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.","number":"340-970","topic":"340","title":"Real Estate—General","area":"Assets","paragraphs":31,"summary":"ASC 340-970 (the Real Estate Project Costs Subsections) governs when costs of real estate projects may be capitalized, how they are subsequently measured and amortized, and when they must be written off. Preacquisition costs are capitalized only if directly identifiable with a specific property, capitalizable if the property were owned, and acquisition is probable; option payments are always capitalized. Once a project is substantially completed and held available for occupancy, carrying and rental operating costs are expensed, depreciation begins, and capitalized rental costs are amortized.","concepts":["preacquisition costs","real estate project costs","capitalization of option payments","common costs allocation","amenities","incidental operations","substantially completed and held available for occupancy","capitalized rental costs"],"categories":["Initial measurement","Subsequent measurement","Inventory and PP&E","Industry-specific"],"level":"intermediate","topic_title":"Other Assets and Deferred Costs","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"340-970-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" id=\"SL50392347-203115\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>Contract</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/d/#direct-financing-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets none of the criteria in paragraph 842-10-25-2 but meets the criteria in paragraph 842-10-25-3(b)and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>Direct Financing Lease</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2021-05/\" class=\"xref\">Accounting Standards Update No. 2021-05</a></td><td class=\"entry\">07/19/2021</td></tr><tr><td class=\"entry\"><a href=\"/glossary/d/#direct-financing-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets none of the criteria in paragraph 842-10-25-2 but meets the criteria in paragraph 842-10-25-3(b)and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>Direct Financing Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/f/#finance-lease\" class=\"term\" title=\"From the perspective of a lessee, a lease that meets one or more of the criteria in paragraph 842-10-25-2.\"><span>Finance Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/i/#initial-direct-costs\" class=\"term\" title=\"Incremental costs of a lease that would not have been incurred if the lease had not been obtained.\"><span>Initial Direct Costs</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lease\" class=\"term\" title=\"A contract, or part of a contract, that conveys the right to control the use of identified property, plant, or equipment (an identified asset) for a period of time in exchange for consideration.\"><span>Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lease-term\" class=\"term\" title=\"The noncancellable period for which a lessee has the right to use an underlying asset, together with all of the following: Periods covered by an option to extend the lease if the lessee is reasonably certain to exercise that option Periods covered by an option to terminate the lease if the lessee is reasonably certain not to exercise that option Periods covered by an option to extend (or not to terminate) the lease in which exercise of the option is controlled by the lessor.\"><span>Lease Term</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lessee\" class=\"term\" title=\"An entity that enters into a contract to obtain the right to use an underlying asset for a period of time in exchange for consideration.\"><span>Lessee</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/s/#sales-type-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets one or more of the criteria in paragraph 842-10-25-2 and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>Lessor</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/o/#operating-lease\" class=\"term\" title=\"From the perspective of a lessee, any lease other than a finance lease. From the perspective of a lessor, any lease other than a sales-type lease or a direct financing lease.\"><span>Operating Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><strong class=\"ph b\">Phase</strong> (1st def.)</td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-06/\" class=\"xref\">Accounting Standards Update No. 2014-06</a></td><td class=\"entry\">03/14/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/p/#phase\" class=\"term\" title=\"A contractually or physically distinguishable portion of a real estate project (including time-sharing projects). That portion is distinguishable from other portions based on shared characteristics such as: Units a developer has declared or legally registered to be for sale Units linked to an owners association Units to be constructed during a particular time period How a developer plans to build the real estate project.\"><span>Phase</span></a> (2nd def.)</td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-06/\" class=\"xref\">Accounting Standards Update No. 2014-06</a></td><td class=\"entry\">03/14/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/s/#sales-type-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets one or more of the criteria in paragraph 842-10-25-2 and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>Sales-Type Lease</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2021-05/\" class=\"xref\">Accounting Standards Update No. 2021-05</a></td><td class=\"entry\">07/19/2021</td></tr><tr><td class=\"entry\"><a href=\"/glossary/s/#sales-type-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets one or more of the criteria in paragraph 842-10-25-2 and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>Sales-Type Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/u/#underlying-asset\" class=\"term\" title=\"An asset that is the subject of a lease for which a right to use that asset has been conveyed to a lessee. The underlying asset could be a physically distinct portion of a single asset.\"><span>Underlying Asset</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-25-10\" class=\"xref\">970-340-25-10</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-06/\" class=\"xref\">Accounting Standards Update No. 2014-06</a></td><td class=\"entry\">03/14/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-25-13\" class=\"xref\">970-340-25-13</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-25-14\" class=\"xref\">970-340-25-14</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-25-15\" class=\"xref\">970-340-25-15</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-25-16\" class=\"xref\">970-340-25-16</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-25-18\" class=\"xref\">970-340-25-18</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-25-19\" class=\"xref\">970-340-25-19</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-35-1\" class=\"xref\">970-340-35-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-35-2\" class=\"xref\">970-340-35-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-35-2\" class=\"xref\">970-340-35-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/340/970/#340-970-40-1\" class=\"xref\">970-340-40-1</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\nContract | Added | Accounting Standards Update No. 2016-02 | 02/25/2016 |\nDirect Financi…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:96615e92371e881197d51584af97e6916b904c9337e6718e3f5b0710e20dcc66","downloaded_from":"2026-09-09T23:58:59.193Z","last_downloaded_at":"2026-09-09T23:58:59.193Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477679","source_sha256":"117db4e7b453c947cec221dbec3d33d002a412c2532b8c515cdffb65832f6ace"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2c03cd3dfbc6478852ce352ca9730bd341bb842d89aa76dc4bc2bff174351d82","downloaded_from":"2026-09-09T23:58:59.193Z","last_downloaded_at":"2026-09-09T23:58:59.193Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477679","source_sha256":"117db4e7b453c947cec221dbec3d33d002a412c2532b8c515cdffb65832f6ace"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4e58bc0377d42d7c86e884b51fcd2e2ca761b934080d2de115782c9889a25025","downloaded_from":"2026-09-09T23:58:59.193Z","last_downloaded_at":"2026-09-09T23:58:59.193Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477679","source_sha256":"117db4e7b453c947cec221dbec3d33d002a412c2532b8c515cdffb65832f6ace"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"340-970-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The content in this Subtopic is contained in the Real Estate <a href=\"/glossary/p/#project-costs\" class=\"term\" title=\"Costs clearly associated with the acquisition, development, and construction of a real estate project.\"><span>Project Costs</span></a> Subsections.</div></div>","snippet":"The content in this Subtopic is contained in the Real Estate Project Costs Subsections.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3c175ee1bc0557d089d763295192bad07f4f7c6817a92559808317ac7116276c","downloaded_from":"2026-09-09T23:59:01.483Z","last_downloaded_at":"2026-09-09T23:59:01.483Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477878","source_sha256":"681eaf0f649175418824da8340adcbf0fb18b577339a2a81f42a0c7bcbe5bee6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:56aee1bde6787207a4be5740a6587f78a7667557f9ca7b3d1bdbfbeef7da9eaa","downloaded_from":"2026-09-09T23:59:01.483Z","last_downloaded_at":"2026-09-09T23:59:01.483Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477878","source_sha256":"681eaf0f649175418824da8340adcbf0fb18b577339a2a81f42a0c7bcbe5bee6"}},{"block":"Real Estate Project Costs","heading":null,"paragraphs":[{"citation":"340-970-05-2","para":"05-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">The Real Estate <a href=\"/glossary/p/#project-costs\" class=\"term\" title=\"Costs clearly associated with the acquisition, development, and construction of a real estate project.\"><span>Project Costs</span></a> Subsections of this Subtopic provide accounting guidance concerning the capitalization, measurement, and derecognition of certain real estate project costs.</div></div>","snippet":"The Real Estate Project Costs Subsections of this Subtopic provide accounting guidance concerning the capitalization, measurement, and derecognition of certain real estate project costs.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:be88ed9601a35605cf76f7b4d23bf258bc098f51efe15726093c8eb8277dff1b","downloaded_from":"2026-09-09T23:59:01.483Z","last_downloaded_at":"2026-09-09T23:59:01.483Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477878","source_sha256":"681eaf0f649175418824da8340adcbf0fb18b577339a2a81f42a0c7bcbe5bee6"}},{"citation":"340-970-05-3","para":"05-3","html":"<div class=\"asc-body\"><div class=\"norm-text\">See also Subtopic <a altsource=\"GUID-07251D70-AAFA-429D-B7E1-4BA74D4FD303.ditamap\" class=\"ditamap\">835-20</a> for additional guidance related to interest costs that can be capitalized into project costs.</div></div>","snippet":"See also Subtopic 835-20 for additional guidance related to interest costs that can be capitalized into project costs.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:74d007fdfa8df8038e53dcaf4e8f47fc1fef4ced598c23dfb9dd01e406dc75ee","downloaded_from":"2026-09-09T23:59:01.483Z","last_downloaded_at":"2026-09-09T23:59:01.483Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477878","source_sha256":"681eaf0f649175418824da8340adcbf0fb18b577339a2a81f42a0c7bcbe5bee6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b9f49a1fef065c459ba1e794e7a74732801d0dc4f59e16964cf6222e79e252dd","downloaded_from":"2026-09-09T23:59:01.483Z","last_downloaded_at":"2026-09-09T23:59:01.483Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477878","source_sha256":"681eaf0f649175418824da8340adcbf0fb18b577339a2a81f42a0c7bcbe5bee6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e1ed58ce28534646ab6a2a316c0f14e0010284c8f90ce11328dbf3ceaa3d4684","downloaded_from":"2026-09-09T23:59:01.483Z","last_downloaded_at":"2026-09-09T23:59:01.483Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477878","source_sha256":"681eaf0f649175418824da8340adcbf0fb18b577339a2a81f42a0c7bcbe5bee6"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"340-970-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section <a altsource=\"GUID-71899CE0-2F6F-4079-AD13-1EC98EA2A8DF.ditamap\" class=\"ditamap\">970-10-15</a>.</div></div>","snippet":"This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 970-10-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0e4e7bdbf2f801dbacdd8e368c337b31a505e5f69d51b074aa22775198194472","downloaded_from":"2026-09-09T23:59:04.624Z","last_downloaded_at":"2026-09-09T23:59:04.624Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478881","source_sha256":"12e4622de6e445027c0c93d71d60d3b9575f9b67d0dfdb59994b9f9e50eb7239"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7994867c7da193b6dc8b19c258148262aecb22e17c5e90f6e761f71f0c8ecf6f","downloaded_from":"2026-09-09T23:59:04.624Z","last_downloaded_at":"2026-09-09T23:59:04.624Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478881","source_sha256":"12e4622de6e445027c0c93d71d60d3b9575f9b67d0dfdb59994b9f9e50eb7239"}},{"block":"Real Estate Project Costs","heading":"Overall Guidance","paragraphs":[{"citation":"340-970-15-2","para":"15-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">The Real Estate <a href=\"/glossary/p/#project-costs\" class=\"term\" title=\"Costs clearly associated with the acquisition, development, and construction of a real estate project.\"><span>Project Costs</span></a> Subsections follow the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see the <a href=\"/asc/970/10/#15-scope-and-scope-exceptions\" class=\"xref\">Real Estate Project Costs Subsection</a> of Section 970-10-15.</div></div>","snippet":"The Real Estate Project Costs Subsections follow the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see the Real Estate Project Costs Subsection of Section 970-10-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cf7d4735d2ab9e16cad9e6919882478acdc82050c26c73e4f05712e6e9afad14","downloaded_from":"2026-09-09T23:59:04.624Z","last_downloaded_at":"2026-09-09T23:59:04.624Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478881","source_sha256":"12e4622de6e445027c0c93d71d60d3b9575f9b67d0dfdb59994b9f9e50eb7239"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bc8ca9bd281c8493845a05af797f8a94e5433477c9e4d6f1f0babbef1b071c31","downloaded_from":"2026-09-09T23:59:04.624Z","last_downloaded_at":"2026-09-09T23:59:04.624Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478881","source_sha256":"12e4622de6e445027c0c93d71d60d3b9575f9b67d0dfdb59994b9f9e50eb7239"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e5190e7e5c7c34bc3412797ae5015e28b6314842699c5b3fa14f245f6c26f0ef","downloaded_from":"2026-09-09T23:59:04.624Z","last_downloaded_at":"2026-09-09T23:59:04.624Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478881","source_sha256":"12e4622de6e445027c0c93d71d60d3b9575f9b67d0dfdb59994b9f9e50eb7239"}},{"number":"25","label":"25 Recognition","anchor":"25-recognition","is_sec":false,"groups":[{"block":"Real Estate Project Costs","heading":"Acquisition, Development, and Construction Costs","paragraphs":[{"citation":"340-970-25-1","para":"25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_26497649-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Subsection does not address the accounting for costs incurred for acquisitions of property that will be used in the entity's own operations, other than for sale or rental. </span></span> </div> </div>","snippet":"This Subsection does not address the accounting for costs incurred for acquisitions of property that will be used in the entity's own operations, other than for sale or rental.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a73c81e565f28c82ba8edb01d39f149e1e33cd1539fdef7af6c0712a8519eac1","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-2","para":"25-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_26497826-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/310/20/#310-20-55-9\" class=\"xref\">310-20-55-9 through 55-10</a></div> provides guidance on how to distinguish between internal and external costs. </span></span> <span class=\"sfragment\" id=\"sfr_26497974-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The capitalization provisions of this Section for <a href=\"/glossary/p/#preacquisition-costs\" class=\"term\" title=\"Costs related to a property that are incurred for the express purpose of, but prior to, obtaining that property. Examples of preacquisition costs may be costs of surveying, zoning or traffic studies, or payments to obtain an option on the property.\"><span>preacquisition costs</span></a> apply to internally generated costs. </span></span> </div> </div>","snippet":"Paragraphs 310-20-55-9 through 55-10 provides guidance on how to distinguish between internal and external costs. The capitalization provisions of this Section for preacquisition costs apply to internally generated costs…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:503a86b91fe96e833d56274a4de8d845dc6280ecc32e54fd63c79a3b63ebe340","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-3","para":"25-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_26497AC2-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Payments to obtain an option to acquire real property shall be capitalized as incurred. All other costs related to a property that are incurred before the entity acquires the property, or before the entity obtains an option to acquire it, shall be capitalized if all of the following conditions are met and otherwise shall be charged to expense as incurred: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_26497C14-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The costs are directly identifiable with the specific property. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_26497D31-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The costs would be capitalized if the property were already acquired. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_26497E5B-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Acquisition of the property or of an option to acquire the property is probable (that is, likely to occur). </span></span> <span class=\"sfragment\" id=\"sfr_26497F7D-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This condition requires that the prospective purchaser is actively seeking to acquire the property and has the ability to finance or obtain financing for the acquisition and that there is no indication that the property is not available for sale. </span></span> </div> </li> </ol> </div> </div>","snippet":"Payments to obtain an option to acquire real property shall be capitalized as incurred. All other costs related to a property that are incurred before the entity acquires the property, or before the entity obtains an opt…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:924280db85faaea5664ab512626d2ecce62a9f58bc75665cdccebcad85ca668d","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-4","para":"25-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_2649809B-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Capitalized preacquisition costs either: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_264981BE-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Shall be included as <a href=\"/glossary/p/#project-costs\" class=\"term\" title=\"Costs clearly associated with the acquisition, development, and construction of a real estate project.\"><span>project costs</span></a> upon the acquisition of the property </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_26498306-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">To the extent not recoverable by the sale of the options, plans, and so forth, shall be charged to expense when it is probable that the property will not be acquired. </span></span> </div> </li> </ol> </div> </div>","snippet":"Capitalized preacquisition costs either:\n(a) Shall be included as project costs upon the acquisition of the property\n(b) To the extent not recoverable by the sale of the options, plans, and so forth, shall be charged to …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bb285e0715be7c32782fd1d538bdd276d63028c31348cfdecd5f8d0701bfd65a","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-5","para":"25-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_2649845D-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The view that all internal costs of identifying and acquiring commercial properties should be deferred and, in some manner, capitalized as part of the cost of successful property acquisitions is not appropriate. </span></span> </div> </div>","snippet":"The view that all internal costs of identifying and acquiring commercial properties should be deferred and, in some manner, capitalized as part of the cost of successful property acquisitions is not appropriate.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:de02005c07d5f4f02a89f35ed189da58646d81b25c283c9a2f7a4741d49db5de","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-6","para":"25-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_264985AA-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Internal costs of preacquisition activities incurred in connection with the acquisition of a property that will be classified as nonoperating at the date of acquisition that are directly identifiable with the acquired property and that were incurred subsequent to the time that acquisition of that specific property was considered probable (that is, likely to occur) shall be capitalized as part of the cost of that acquisition. </span></span> </div> </div>","snippet":"Internal costs of preacquisition activities incurred in connection with the acquisition of a property that will be classified as nonoperating at the date of acquisition that are directly identifiable with the acquired pr…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1f8adaf08ad11b1b73296a52610439f97a8a226ec0b03faef1bb66251f629ffe","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-7","para":"25-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_264986FC-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraph <a href=\"/asc/340/970/#340-970-25-17\" class=\"xref\">970-340-25-17</a> is also applicable in situations in which the acquired property is partially operating and partially nonoperating. </span></span> </div> </div>","snippet":"Paragraph 970-340-25-17 is also applicable in situations in which the acquired property is partially operating and partially nonoperating.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:62127692fd4404472898d5f85b4fd012251b0f722a82aa8f68ab5d3d994d1c27","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-8","para":"25-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_2649885C-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Costs incurred on real estate for property taxes and insurance shall be capitalized as property cost only during periods in which activities necessary to get the property ready for its intended use are in progress. </span></span> <span class=\"sfragment\" id=\"sfr_264989A9-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The phrase <em class=\"ph i\">activities necessary to get the property ready for its intended use are in progress</em> is used here with the same meaning as it has for interest capitalization in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/835/20/#835-20-25-3\" class=\"xref\">835-20-25-3 through 25-4</a></div> and <a href=\"/asc/835/20/#835-20-25-8\" class=\"xref\">835-20-25-8</a>. </span></span> <span class=\"sfragment\" id=\"sfr_26498B06-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Costs incurred for such items after the property is substantially complete and ready for its intended use </span></span> <span class=\"sfragment\" id=\"sfr_26498C47-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">shall be charged to expense as incurred. </span></span> <span class=\"sfragment\" id=\"sfr_26498DB7-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The phrase <em class=\"ph i\">substantially complete and ready for its intended use</em> is used here with the same meaning as it has for interest capitalization in paragraph <a href=\"/asc/835/20/#835-20-25-5\" class=\"xref\">835-20-25-5</a>. </span></span> </div> </div>","snippet":"Costs incurred on real estate for property taxes and insurance shall be capitalized as property cost only during periods in which activities necessary to get the property ready for its intended use are in progress. The p…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9f2338c42fe97e70c547397cf64bd377587566480975c6e533295c9ef019b7b8","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-9","para":"25-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_26498F3A-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Accounting for costs of <a href=\"/glossary/a/#amenities\" class=\"term\" title=\"Features that enhance the attractiveness or perceived value of a time-sharing interval. Examples of amenities include golf courses, utility plants, clubhouses, swimming pools, tennis courts, indoor recreational facilities, and parking facilities. See also Promised Amenities.\"><span>amenities</span></a> shall be based on management's plans for the amenities in accordance with the following: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_264990AE-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If an amenity is to be sold or transferred in connection with the sale of individual units, costs in excess of anticipated proceeds shall be allocated as <a href=\"/glossary/c/#common-costs\" class=\"term\" title=\"Costs that relate to two or more units or phases within a real estate or time-sharing project.\"><span>common costs</span></a> because the amenity is clearly associated with the development and sale of the project. The common costs include expected future operating costs to be borne by the developer until they are assumed by buyers of units in a project. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_2649920B-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If an amenity is to be sold separately or retained by the developer, capitalizable costs of the amenity in excess of its estimated fair value as of the expected date of its substantial physical completion shall be allocated as common costs. </span></span> <span class=\"sfragment\" id=\"sfr_26499367-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For the purpose of determining the amount to be capitalized as common costs, the amount of cost previously allocated to the amenity shall not be revised after the amenity is substantially completed and available for use. </span></span> <span class=\"sfragment\" id=\"sfr_264994B6-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A later sale of the amenity at more or less than its estimated fair value as of the date of substantial physical completion, less any accumulated depreciation, results in a gain or loss that shall be included in net income in the period in which the sale occurs. </span></span> </div> </li> </ol> </div> </div>","snippet":"Accounting for costs of amenities shall be based on management's plans for the amenities in accordance with the following:\n(a) If an amenity is to be sold or transferred in connection with the sale of individual units, c…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8507d75e1402e2c945310b831c78c568dffd54ef9342556ec3f170c6922f2831","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-10","para":"25-10","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_2649960E-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Costs of amenities shall be allocated among land parcels benefited and for which development is probable. A land parcel may be considered to be an individual lot or unit, an amenity, or a <a href=\"/glossary/p/#phase\" class=\"term\" title=\"A contractually or physically distinguishable portion of a real estate project (including time-sharing projects). That portion is distinguishable from other portions based on shared characteristics such as: Units a developer has declared or legally registered to be for sale Units linked to an owners association Units to be constructed during a particular time period How a developer plans to build the real estate project.\"><span>phase</span></a>. The fair value of a parcel is affected by its physical characteristics, its highest and best use, and the time and cost required for the buyer to make such use of the property considering access, development plans, zoning restrictions, and market absorption factors. </span></span> </div> </div>","snippet":"Costs of amenities shall be allocated among land parcels benefited and for which development is probable. A land parcel may be considered to be an individual lot or unit, an amenity, or a phase. The fair value of a parce…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4f4ceb2a3b07cd0061e1c74a4881d85d3c7337460f7109d080ac51c5be395263","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-11","para":"25-11","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_26499760-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Before an amenity is substantially completed and available for use, operating income (or loss) of the amenity shall be included as a reduction of (or an addition to) common costs. When an amenity to be sold separately or retained by the developer is substantially completed and available for use, current operating income and expenses of the amenity shall be included in current operating results. </span></span> </div> </div>","snippet":"Before an amenity is substantially completed and available for use, operating income (or loss) of the amenity shall be included as a reduction of (or an addition to) common costs. When an amenity to be sold separately or…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:aa56b9f1d5ff09efd43a5fd703e5bc8af86e94832b229d3549a997cd818d0beb","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-12","para":"25-12","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_264998A5-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> <a href=\"/glossary/i/#incremental-revenues-from-incidental-operations\" class=\"term\" title=\"Revenues that would not be produced except in relation to the conduct of incidental operations.\"><span>Incremental revenues from incidental operations</span></a> in excess of <a href=\"/glossary/i/#incremental-costs-of-incidental-operations\" class=\"term\" title=\"Costs that would not be incurred except in relation to the conduct of incidental operations. Interest, taxes, insurance, security, and similar costs that would be incurred during the development of a real estate project regardless of whether incidental operations were conducted are not incremental costs.\"><span>incremental costs of incidental operations</span></a> shall be accounted for as a reduction of capitalized project costs. Incremental costs in excess of incremental revenue shall be charged to expense as incurred, because the incidental operations did not achieve the objective of reducing the costs of developing the property for its intended use. </span></span> </div> </div>","snippet":"Incremental revenues from incidental operations in excess of incremental costs of incidental operations shall be accounted for as a reduction of capitalized project costs. Incremental costs in excess of incremental reven…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c2c79f1914cc40bb9c2170edc4c237672865c830ca8cf9df160bb8db01fd0cff","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2b5690d86cb0a88adf97921353bdd1591f37583ba5a143e2c7ce2fbf5d4283bb","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"block":"Real Estate Project Costs","heading":"Costs Incurred to Sell and Rent Real Estate Projects, Including Initial Rental Operations","paragraphs":[{"citation":"340-970-25-13","para":"25-13","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_26499A0B-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> <a href=\"/glossary/c/#costs-incurred-to-sell-real-estate-projects\" class=\"term\" title=\"Costs related to the sale of real estate, including the following: Model units and their furnishings Sales facilities Sales brochures Legal fees for preparation of prospectuses Semipermanent signs Advertising Grand openings Sales overhead including sales salaries.\"><span>Costs incurred to sell real estate projects</span></a> shall be </span></span> <span class=\"sfragment\" id=\"sfr_26499B62-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">evaluated for capitalization in accordance with paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/340/40/#340-40-25-1\" class=\"xref\">340-40-25-1 through 25-8</a></div>.</span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Subparagraph superseded by Accounting Standards Update No. 2014-09</a>.</div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Subparagraph superseded by Accounting Standards Update No. 2014-09</a>.</div> </li> </ol> </div> </div>","snippet":"Costs incurred to sell real estate projects shall be evaluated for capitalization in accordance with paragraphs 340-40-25-1 through 25-8.\n(a) Subparagraph superseded by Accounting Standards Update No. 2014-09.\n(b) Subpar…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:46f0f97c1a18250568d58a5a072ef6b13da6df8ad5c3a0c165ba2dde484cc9a0","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-14","para":"25-14","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-09</a>.</div> </div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-09.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0202132cc321e55ff49000941fd323ad754581e2781a78669ae4590d81be5891","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-15","para":"25-15","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <a href=\"/updates/asu-2014-09/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-09</a>.</div> </div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-09.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9f09fa11184bf12a31f076374abeaf8c06258f850d5ee766b74e36b59c0f900d","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-16","para":"25-16","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_2649A1A5-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If <a href=\"/glossary/c/#costs-incurred-to-rent-real-estate-projects\" class=\"term\" title=\"Costs related to real estate rental activities, including the following: Model units and their furnishings Rental facilities Semipermanent signs Rental brochures Advertising Grand openings Rental overhead including rental salaries.\"><span>costs incurred to rent real estate projects</span></a>, other than <a href=\"/glossary/i/#initial-direct-costs\" class=\"term\" title=\"Incremental costs of a lease that would not have been incurred if the lease had not been obtained.\"><span>initial direct costs</span></a>, </span></span> <span class=\"sfragment\" id=\"sfr_2649A2F9-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> under <a href=\"/glossary/o/#operating-lease\" class=\"term\" title=\"From the perspective of a lessee, any lease other than a finance lease. From the perspective of a lessor, any lease other than a sales-type lease or a direct financing lease.\"><span>operating leases</span></a> or <a href=\"/glossary/d/#direct-financing-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets none of the criteria in paragraph 842-10-25-2 but meets the criteria in paragraph 842-10-25-3(b)and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>direct financing leases</span></a> are related to and their recovery is reasonably expected from future rental operations, they shall be capitalized. Examples are costs of model units and their furnishings, rental facilities, semipermanent signs, grand openings, and unused rental brochures. Costs that do not meet the criteria for capitalization shall be expensed as incurred, for example, rental overhead. </span></span> <span class=\"sfragment\" id=\"sfr_2649A444-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Initial direct costs are defined in Topic <a altsource=\"GUID-EFFBD456-3862-4F38-9F32-420717B43DE5.ditamap\" class=\"ditamap\">842</a> and the accounting for initial direct costs is prescribed in that Topic. </span></span> </div> </div>","snippet":"If costs incurred to rent real estate projects, other than initial direct costs, under operating leases or direct financing leases are related to and their recovery is reasonably expected from future rental operations, t…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:61e806c06ce7b83b34c2c0b72d247ebdf5aa7cb2b4402372c0c496a66d45fe61","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-17","para":"25-17","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_2649A592-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If portions of a rental project are substantially completed and occupied by tenants or held available for occupancy and other portions have not yet reached that stage, the substantially completed portions shall be accounted for as a separate project. Costs incurred shall be allocated between the portions under construction and the portions substantially completed and held available for occupancy. </span></span> </div> </div>","snippet":"If portions of a rental project are substantially completed and occupied by tenants or held available for occupancy and other portions have not yet reached that stage, the substantially completed portions shall be accoun…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:078c2de636d1237f8c594c11c66646b59a4d7b4dcbb2d4083100d419c1ea498f","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5618a851004d69ea106000771cc7d1dd38409d0595c285d445ff616fe85e1425","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"block":"Real Estate Project Costs","heading":"Initial Rental Operations","paragraphs":[{"citation":"340-970-25-18","para":"25-18","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_2649A6E0-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">When a real estate project is substantially completed and held available for occupancy: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_2649A822-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Rental operating costs shall be charged to expense when incurred. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_2649A986-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">All carrying costs (such as real estate taxes) shall be charged to expense when incurred, depreciation on the cost of the project shall be provided. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_2649AADB-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Costs to rent the project shall be amortized in accordance with paragraph <a href=\"/asc/340/970/#340-970-35-2\" class=\"xref\">970-340-35-2</a>. </span></span> </div> </li> </ol> </div> </div>","snippet":"When a real estate project is substantially completed and held available for occupancy:\n(a) Rental operating costs shall be charged to expense when incurred.\n(b) All carrying costs (such as real estate taxes) shall be ch…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2f350ac6c82a955b7e007cbb153768d03b1af4bc9e748d21deb982e99ac9fe95","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"citation":"340-970-25-19","para":"25-19","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_2649AC27-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A real estate project shall be considered substantially completed and held available for occupancy upon completion of tenant improvements by the developer but no later than one year from cessation of major construction activity (as distinguished from activities such as routine maintenance and cleanup). </span></span> </div> </div>","snippet":"A real estate project shall be considered substantially completed and held available for occupancy upon completion of tenant improvements by the developer but no later than one year from cessation of major construction a…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2ca0f2a528bec0d9bdf9f78f03f6fc32c1d414071572bcac9ef49a6fef8a461e","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c00dba8349d307871b81afa26b252b4a48a3b6a5d215b0d507de2dea548cfaeb","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:afc7245d7cf447f02f9d8e6ea1b807f43794fba2afdf4947a5d3fde2329eeb0a","downloaded_from":"2026-09-09T23:59:08.692Z","last_downloaded_at":"2026-09-09T23:59:08.692Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477549","source_sha256":"97b2f564ea36e8f645fae359a82e158f4c9038073fc6eafdeeae935a9eabe357"}},{"number":"35","label":"35 Subsequent Measurement","anchor":"35-subsequent-measurement","is_sec":false,"groups":[{"block":"Real Estate Project Costs","heading":"Determining Amounts to Be Capitalized or Expensed","paragraphs":[{"citation":"340-970-35-1","para":"35-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_266D7DCB-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Estimates and cost allocations shall be reviewed at the end of each financial reporting period until a project is substantially completed and available for sale. </span></span> <span class=\"sfragment\" id=\"sfr_266D7F6B-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Costs shall be revised and reallocated as necessary for material changes on the basis of current estimates. </span></span> <span class=\"sfragment\" id=\"sfr_266D80E0-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Changes in estimates shall be reported in accordance with paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/250/10/#250-10-45-17\" class=\"xref\">250-10-45-17 through 45-20</a></div> and <a href=\"/asc/250/10/#250-10-50-4\" class=\"xref\">250-10-50-4</a>. </span></span> </div> </div>","snippet":"Estimates and cost allocations shall be reviewed at the end of each financial reporting period until a project is substantially completed and available for sale. Costs shall be revised and reallocated as necessary for ma…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c30ac62b5b9613502366648cf82931e2d9f014702351f5b7e5b6bd797bfa1a5f","downloaded_from":"2026-09-09T23:59:11.849Z","last_downloaded_at":"2026-09-09T23:59:11.849Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478987","source_sha256":"e9a3bf010c695aef9dc36e3ce6a5707cc4e23b46441a61f02d769c2af511fcb4"}},{"citation":"340-970-35-2","para":"35-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_266D8514-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Capitalized rental costs directly related to revenue from a specific <a href=\"/glossary/o/#operating-lease\" class=\"term\" title=\"From the perspective of a lessee, any lease other than a finance lease. From the perspective of a lessor, any lease other than a sales-type lease or a direct financing lease.\"><span>operating lease</span></a> or <a href=\"/glossary/d/#direct-financing-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets none of the criteria in paragraph 842-10-25-2 but meets the criteria in paragraph 842-10-25-3(b)and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>direct financing lease</span></a>, other than <a href=\"/glossary/i/#initial-direct-costs\" class=\"term\" title=\"Incremental costs of a lease that would not have been incurred if the lease had not been obtained.\"><span>initial direct costs</span></a>, shall be amortized over the <a href=\"/glossary/l/#lease-term\" class=\"term\" title=\"The noncancellable period for which a lessee has the right to use an underlying asset, together with all of the following: Periods covered by an option to extend the lease if the lessee is reasonably certain to exercise that option Periods covered by an option to terminate the lease if the lessee is reasonably certain not to exercise that option Periods covered by an option to extend (or not to terminate) the lease in which exercise of the option is controlled by the lessor.\"><span>lease term</span></a>. Capitalized rental costs, other than initial direct costs, not directly related to revenue from a specific <a href=\"/glossary/l/#lease\" class=\"term\" title=\"A contract, or part of a contract, that conveys the right to control the use of identified property, plant, or equipment (an identified asset) for a period of time in exchange for consideration.\"><span>lease</span></a> shall be amortized over the period of expected benefit. The amortization period shall begin when the project is substantially completed and held available for occupancy. </span></span> <span class=\"sfragment\" id=\"sfr_266D866F-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/340/970/#340-970-25-18\" class=\"xref\">970-340-25-18 through 25-19</a></div> for the definition of substantially completed and held available for occupancy. </span></span> <span class=\"sfragment\" id=\"sfr_266D87B4-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Initial direct costs are defined in Topic <a altsource=\"GUID-EFFBD456-3862-4F38-9F32-420717B43DE5.ditamap\" class=\"ditamap\">842</a> on leases, and the accounting for initial direct costs is prescribed in that Topic. Topic <a altsource=\"GUID-EFFBD456-3862-4F38-9F32-420717B43DE5.ditamap\" class=\"ditamap\">842</a> does not address whether a lessee that accounts for the sale or rental of real estate projects under Topic <a altsource=\"GUID-59C5CBBE-368C-4EFB-95F3-5BFF2BE7A559.ditamap\" class=\"ditamap\">970</a> should capitalize rental costs associated with ground and building leases.</span></span> </div> </div>","snippet":"Capitalized rental costs directly related to revenue from a specific operating lease or direct financing lease, other than initial direct costs, shall be amortized over the lease term. Capitalized rental costs, other tha…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c4b68f3e985052ad08f634f2d2917ae1d6e68174d8e1d3d0bba1cded783d21cc","downloaded_from":"2026-09-09T23:59:11.849Z","last_downloaded_at":"2026-09-09T23:59:11.849Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478987","source_sha256":"e9a3bf010c695aef9dc36e3ce6a5707cc4e23b46441a61f02d769c2af511fcb4"}},{"citation":"340-970-35-3","para":"35-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_266D8907-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If an entity subsequently determines that a property will be classified as operating at the date of acquisition, the internal costs of preacquisition activities shall be charged to expense and any additional costs shall be expensed as incurred. </span></span> </div> </div>","snippet":"If an entity subsequently determines that a property will be classified as operating at the date of acquisition, the internal costs of preacquisition activities shall be charged to expense and any additional costs shall …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8f1550cd058f9b8f484eafc4c379ead1d1fffd5583bae865118f80737c545dbe","downloaded_from":"2026-09-09T23:59:11.849Z","last_downloaded_at":"2026-09-09T23:59:11.849Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478987","source_sha256":"e9a3bf010c695aef9dc36e3ce6a5707cc4e23b46441a61f02d769c2af511fcb4"}},{"citation":"340-970-35-4","para":"35-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_266D8A4A-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If an entity subsequently determines that a property will be classified as nonoperating at the date of acquisition, previously expensed internal costs of preacquisition activities shall not be capitalized as part of the cost of that acquisition. </span></span> </div> </div>","snippet":"If an entity subsequently determines that a property will be classified as nonoperating at the date of acquisition, previously expensed internal costs of preacquisition activities shall not be capitalized as part of the …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:31bd25d3fc9d26654e2be42d6507f806e1f5a53e1a5be839fed52874c61e3da2","downloaded_from":"2026-09-09T23:59:11.849Z","last_downloaded_at":"2026-09-09T23:59:11.849Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478987","source_sha256":"e9a3bf010c695aef9dc36e3ce6a5707cc4e23b46441a61f02d769c2af511fcb4"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8732cd73a55adb847b7295bdc90844bc9ce3647b46593c563db59097295f33cb","downloaded_from":"2026-09-09T23:59:11.849Z","last_downloaded_at":"2026-09-09T23:59:11.849Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478987","source_sha256":"e9a3bf010c695aef9dc36e3ce6a5707cc4e23b46441a61f02d769c2af511fcb4"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:745361c42572c089d031e3e4af709b23015ca957bd791b721a86b40c026ef53e","downloaded_from":"2026-09-09T23:59:11.849Z","last_downloaded_at":"2026-09-09T23:59:11.849Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478987","source_sha256":"e9a3bf010c695aef9dc36e3ce6a5707cc4e23b46441a61f02d769c2af511fcb4"}},{"number":"40","label":"40 Derecognition","anchor":"40-derecognition","is_sec":false,"groups":[{"block":"Real Estate Project Costs","heading":null,"paragraphs":[{"citation":"340-970-40-1","para":"40-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-09</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-09.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cdbd8deacf7539f1d69b46fa591da51a93185d4eb1a61d1c33bd0d5f7898cb29","downloaded_from":"2026-09-09T23:59:15.601Z","last_downloaded_at":"2026-09-09T23:59:15.601Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478797","source_sha256":"9ee6d5778144eb47bfcf7913a5008f3471829f200a4e6a1c8c03a7a0325d805a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:040b9db0a377039f3d84286fdd85f46a8dd773a17ee19e08afbb252064f09616","downloaded_from":"2026-09-09T23:59:15.601Z","last_downloaded_at":"2026-09-09T23:59:15.601Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478797","source_sha256":"9ee6d5778144eb47bfcf7913a5008f3471829f200a4e6a1c8c03a7a0325d805a"}},{"block":"Real Estate Project Costs","heading":"Rental Costs","paragraphs":[{"citation":"340-970-40-2","para":"40-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_2682B490-6E94-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Estimated unrecoverable amounts of unamortized capitalized rental costs associated with a lease or group of leases shall be charged to expense when it becomes probable that the lease(s) will be terminated. </span></span></div></div>","snippet":"Estimated unrecoverable amounts of unamortized capitalized rental costs associated with a lease or group of leases shall be charged to expense when it becomes probable that the lease(s) will be terminated.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dc5896308dcd0c99322e047e1a8cdac77ae881b7ea488fe616cd71630b8d9ccd","downloaded_from":"2026-09-09T23:59:15.601Z","last_downloaded_at":"2026-09-09T23:59:15.601Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478797","source_sha256":"9ee6d5778144eb47bfcf7913a5008f3471829f200a4e6a1c8c03a7a0325d805a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cda24842854fa587b9c1511abee478aec20f163d6bd82d0219610ec88e7f7f06","downloaded_from":"2026-09-09T23:59:15.601Z","last_downloaded_at":"2026-09-09T23:59:15.601Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478797","source_sha256":"9ee6d5778144eb47bfcf7913a5008f3471829f200a4e6a1c8c03a7a0325d805a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dee889f77da707efafc4222488e34eb4807a5cc698b4e80637c78632ea53a9da","downloaded_from":"2026-09-09T23:59:15.601Z","last_downloaded_at":"2026-09-09T23:59:15.601Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478797","source_sha256":"9ee6d5778144eb47bfcf7913a5008f3471829f200a4e6a1c8c03a7a0325d805a"}}],"enrichment":{"summary":"ASC 340-970 (the Real Estate Project Costs Subsections) governs when costs of real estate projects may be capitalized, how they are subsequently measured and amortized, and when they must be written off. Preacquisition costs are capitalized only if directly identifiable with a specific property, capitalizable if the property were owned, and acquisition is probable; option payments are always capitalized. Once a project is substantially completed and held available for occupancy, carrying and rental operating costs are expensed, depreciation begins, and capitalized rental costs are amortized.","key_points":["Payments to obtain an option to acquire real property are capitalized as incurred; other preacquisition costs are capitalized only if they are directly identifiable with the specific property, would be capitalizable if the property were already acquired, and acquisition of the property or option is probable (340-970-25-3).","Capitalized preacquisition costs become project costs upon acquisition, or are charged to expense (to the extent not recoverable by selling options, plans, etc.) when it is probable the property will not be acquired (340-970-25-4).","Internal preacquisition costs are capitalized only for property that will be nonoperating at acquisition, are directly identifiable with it, and were incurred after acquisition became probable; blanket deferral of all internal acquisition costs is not appropriate (340-970-25-5 through 25-6); classification changes do not permit later capitalization of previously expensed internal costs (340-970-35-3 through 35-4).","Property taxes and insurance are capitalized only while activities necessary to get the property ready for its intended use are in progress, using the same meaning as for interest capitalization under 835-20; afterwards they are expensed (340-970-25-8).","Amenity costs are allocated as common costs among benefited parcels for which development is probable—costs in excess of anticipated proceeds if the amenity is sold with units, or costs in excess of estimated fair value at substantial physical completion if sold separately or retained (340-970-25-9 through 25-10).","Incremental revenues from incidental operations in excess of incremental costs reduce capitalized project costs; an excess of incremental costs is charged to expense as incurred (340-970-25-12).","Rental costs other than initial direct costs (Topic 842) are capitalized if recovery is reasonably expected from future rental operations and amortized over the lease term or expected benefit period beginning when the project is substantially completed and held available for occupancy—no later than one year after cessation of major construction activity (340-970-25-16, 25-18 through 25-19, 35-2); unrecoverable amounts are expensed when lease termination becomes probable (340-970-40-2)."],"categories":["Initial measurement","Subsequent measurement","Inventory and PP&E","Industry-specific"],"audience_level":"intermediate","student_note":"This is the classic real estate developer cost-capitalization checklist: watch the \"probable acquisition\" gate for preacquisition costs and the sharp cutoff at substantial completion, after which taxes, insurance, and rental operating costs must be expensed. A common error is assuming all internal costs of hunting for properties can be deferred and rolled into successful acquisitions—340-970-25-5 expressly rejects that.","related_topics":["970-340","835-20","340-40","842","310-20","250-10"],"key_concepts":["preacquisition costs","real estate project costs","capitalization of option payments","common costs allocation","amenities","incidental operations","substantially completed and held available for occupancy","capitalized rental costs"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c409dacc9b4d0e055366154efed4744ec36c722c402cd9ca05674e7c4ad7b4f5","downloaded_from":"2026-09-09T23:58:59.193Z","last_downloaded_at":"2026-09-09T23:59:17.895Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"720-970","title":"Real Estate—General","topic_title":"Other Expenses","score":0.8477,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2d9091c31446ebadfc89b5fa147e3da729dba2fe0f3b9761fbf071f6b9a9505a","downloaded_from":"2026-09-10T01:13:30.229Z","last_downloaded_at":"2026-09-10T01:13:42.190Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"360-970","title":"Real Estate—General","topic_title":"Property, Plant, and Equipment","score":0.8106,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:288a9f0d5ca4a638bbb10b112e689275f92a0757c6bc19acbfd711f5e24fa786","downloaded_from":"2026-09-10T00:11:50.248Z","last_downloaded_at":"2026-09-10T00:12:34.852Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"835-20","title":"Capitalization of Interest","topic_title":"Interest","score":0.7591,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a1739a7b7f97f65502fa862de0ad5cdfc5351a3d75e34e0e424d81f28cfaf780","downloaded_from":"2026-09-10T01:48:54.719Z","last_downloaded_at":"2026-09-10T01:49:28.506Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"323-970","title":"Real Estate—General","topic_title":"Investments—Equity Method and Joint Ventures","score":0.741,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4cdd7ee431135c9eed65aaab0c7c2fb385767347c6ff846749ba9a007f4afc4d","downloaded_from":"2026-09-09T23:42:35.809Z","last_downloaded_at":"2026-09-09T23:43:01.427Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"970-10","title":"Overall","topic_title":"Real Estate—General","score":0.7333,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b81aae98feb7b5cbeb35be01e3cf526cf9efdfe41b8bdbafd4ac339484669d4a","downloaded_from":"2026-09-10T02:25:52.021Z","last_downloaded_at":"2026-09-10T02:26:12.373Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"350-40","title":"Internal-Use Software","topic_title":"Intangibles—Goodwill and Other","score":0.7275,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c7c822817e5352368adc522a1618aab490a23c3c36a97ba99ff924443f6a1bc7","downloaded_from":"2026-09-10T00:02:14.508Z","last_downloaded_at":"2026-09-10T00:02:45.249Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"340-954","title":"Health Care Entities","topic_title":"Other Assets and Deferred Costs","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:feead81b3b37d2292ee570c4299a38765add728a7d28886c2c0b64f166d60abf","downloaded_from":"2026-09-09T23:58:43.326Z","last_downloaded_at":"2026-09-09T23:58:56.807Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"340-978","title":"Real Estate—Time-Sharing Activities","topic_title":"Other Assets and Deferred Costs","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4650b88f5196de47ede8e82ade9dbd90f95d4c458a553efe9d284cccff7ff67e","downloaded_from":"2026-09-09T23:59:19.735Z","last_downloaded_at":"2026-09-09T23:59:36.956Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:592f10f1d0c907b9fe322d79cadec5cb23f8964663b5e18739c157333615a9ba","downloaded_from":"2026-09-09T23:58:59.193Z","last_downloaded_at":"2026-09-09T23:59:17.895Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}