# ASC 360-910-15: Property, Plant, and Equipment — Contractors—Construction — 15 Scope and Scope Exceptions

Source: FASB Accounting Standards Codification, Basic View

[Read online](https://asc.understandingaccounting.org/asc/360/910/#15-scope-and-scope-exceptions)

Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.

Tables and mathematical or amendment markup are retained as HTML where Markdown would lose structure.

Source downloaded (UTC): 2026-09-10T00:08:05.746Z to 2026-09-10T00:08:05.746Z

Record version: sha256:a14bdb7ce830cb4a7210a8e3edea54e7e0b090a617a0a143357d2e75b46d81a5

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 360-910-15: 15 Scope and Scope Exceptions

[Read section](https://asc.understandingaccounting.org/asc/360/910/#15-scope-and-scope-exceptions)

SEC content: no

##### [360-910-15-1](https://asc.understandingaccounting.org/asc/360/910/#360-910-15-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:08:05.746Z to 2026-09-10T00:08:05.746Z

Record version: sha256:d2219e59f69db900c0f5c93ca14ce0552ec406790c5e7c950b21e53f62c5e2aa

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


[Paragraph superseded by Maintenance Update No. 2019-01.](https://asc.understandingaccounting.org/updates/maintenance-updates-2019/)
