# ASC 360-910-35: Property, Plant, and Equipment — Contractors—Construction — 35 Subsequent Measurement

Source: FASB Accounting Standards Codification, Basic View

[Read online](https://asc.understandingaccounting.org/asc/360/910/#35-subsequent-measurement)

Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.

Tables and mathematical or amendment markup are retained as HTML where Markdown would lose structure.

Source downloaded (UTC): 2026-09-10T00:08:11.902Z to 2026-09-10T00:08:11.902Z

Record version: sha256:c4baafd0a52c95e1a0d4416c379b8ff8405ff694fb6ffec1b26eeaa3f84e5ded

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 360-910-35: 35 Subsequent Measurement

[Read section](https://asc.understandingaccounting.org/asc/360/910/#35-subsequent-measurement)

SEC content: no

##### [360-910-35-1](https://asc.understandingaccounting.org/asc/360/910/#360-910-35-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:08:11.902Z to 2026-09-10T00:08:11.902Z

Record version: sha256:615c948919d97dc21eecf2f324b974e71dda6829a7530e88536032c264c4692c

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


[Paragraph superseded by Maintenance Update No. 2019-01.](https://asc.understandingaccounting.org/updates/maintenance-updates-2019/)
