{"schema_version":2,"canonical_url":"https://asc.understandingaccounting.org/asc/450/","source":"FASB Accounting Standards Codification, Basic View","usage":"Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.","number":"450","title":"Contingencies","area":"Liabilities","group":null,"subtopics":[{"number":"450-10","topic":"450","title":"Overall","area":"Liabilities","paragraphs":27,"summary":"ASC 450-10 is the Overall subtopic of the Contingencies Topic; it sets the pervasive scope, definitions, and cross-references for gain and loss contingencies addressed in 450-20 and 450-30. A contingency exists when an existing condition, situation, or set of circumstances involves uncertainty that will be resolved by a future event confirming the acquisition of an asset, reduction of a liability, loss or impairment of an asset, or incurrence of a liability (450-10-05-5). Critically, the mere use of an estimate does not create a contingency (450-10-05-6), and the Topic does not apply to recognition and initial measurement of contingency-related assets and liabilities measured at fair value in a business combination, NFP acquisition, or joint venture formation (450-10-15-2A).","concepts":["loss contingency","gain contingency","existing condition involving uncertainty","estimates versus contingencies","scope exception for business combinations","future confirming event","disclosure of uncertainties"],"categories":["Contingencies and guarantees","Recognition","Disclosure","Business combinations"],"level":"introductory","topic_title":"Contingencies","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-10-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" id=\"SL6797835-128537\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/glossary/a/#acquirer\" class=\"term\" title=\"The entity that obtains control of the acquiree. However, in a business combination in which a variable interest entity (VIE) is acquired, the primary beneficiary of that entity always is the acquirer. (P) December 16, 2026; (N) December 16, 2026805-10-65-5The entity that obtains control of the acquiree.See paragraphs 805-10-25-4805-10-25-5 for guidance on determining the acquirer.\"><span>Acquirer</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2025-03/\" class=\"xref\">Accounting Standards Update No. 2025-03</a></td><td class=\"entry\">05/12/2025</td></tr><tr><td class=\"entry\"><a href=\"/glossary/a/#acquisition-by-a-not-for-profit-entity\" class=\"term\" title=\"A transaction or other event in which a not-for-profit acquirer obtains control of one or more nonprofit activities or businesses and initially recognizes their assets and liabilities in the acquirer's financial statements. When applicable guidance in Topic 805 is applied by a not-for-profit entity, the term business combination has the same meaning as this term has for a for-profit entity. Likewise, a reference to business combinations in guidance that links to Topic 805 has the same meaning as a reference to acquisitions by not-for-profit entities.\"><span>Acquisition by a Not-for-Profit Entity</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2010-07/\" class=\"xref\">Accounting Standards Update No. 2010-07</a></td><td class=\"entry\">01/28/2010</td></tr><tr><td class=\"entry\"><a href=\"/glossary/b/#business\" class=\"term\" title=\"Paragraphs 805-10-55-3A805-10-55-4805-10-55-5805-10-55-6 and 805-10-55-8805-10-55-9 define what is considered a business.\"><span>Business</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2017-01/\" class=\"xref\">Accounting Standards Update No. 2017-01</a></td><td class=\"entry\">01/05/2017</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#commencement-date-of-the-lease-commencement-date\" class=\"term\" title=\"The date on which a lessor makes an underlying asset available for use by a lessee. See paragraphs 842-10-55-19842-10-55-20842-10-55-21 for implementation guidance on the commencement date.\"><span>Commencement Date of the Lease (Commencement Date)</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>Contract</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#corporate-joint-venture\" class=\"term\" title=\"A corporation owned and operated by a small group of entities (the joint venturers) as a separate and specific business or project for the mutual benefit of the members of the group. A government may also be a member of the group. The purpose of a corporate joint venture frequently is to share risks and rewards in developing a new market, product or technology; to combine complementary technological knowledge; or to pool resources in developing production or other facilities. A corporate joint venture also usually provides an arrangement under which each joint venturer may participate, directly or indirectly, in the overall management of the joint venture. Joint venturers thus have an interest or relationship other than as passive investors. An entity that is a subsidiary of one of the joint venturers is not a corporate joint venture. The ownership of a corporate joint venture seldom changes, and its stock is usually not traded publicly. A noncontrolling interest held by public ownership, however, does not preclude a corporation from being a corporate joint venture.\"><span>Corporate Joint Venture</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2023-05/\" class=\"xref\">Accounting Standards Update No. 2023-05</a></td><td class=\"entry\">08/23/2023</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#customer\" class=\"term\" title=\"A party that has contracted with an entity to obtain goods or services that are an output of the entity's ordinary activities in exchange for consideration.\"><span>Customer</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/f/#formation-date\" class=\"term\" title=\"The formation date of a joint venture is the date on which an entity initially meets the definition of a joint venture, which is not necessarily the legal entity formation date. The formation date is the measurement date for the formation transaction. If multiple arrangements are accounted for as a single transaction that establishes the formation of a joint venture, the formation date is the measurement date for all arrangements that form part of the single formation transaction.\"><span>Formation Date</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2023-05/\" class=\"xref\">Accounting Standards Update No. 2023-05</a></td><td class=\"entry\">08/23/2023</td></tr><tr><td class=\"entry\"><a href=\"/glossary/j/#joint-venture\" class=\"term\" title=\"An entity owned and operated by a small group of businesses (the joint venturers) as a separate and specific business or project for the mutual benefit of the members of the group. A government may also be a member of the group. The purpose of a joint venture frequently is to share risks and rewards in developing a new market, product, or technology; to combine complementary technological knowledge; or to pool resources in developing production or other facilities. A joint venture also usually provides an arrangement under which each joint venturer may participate, directly or indirectly, in the overall management of the joint venture. Joint venturers thus have an interest or relationship other than as passive investors. An entity that is a subsidiary of one of the joint venturers is not a joint venture. The ownership of a joint venture seldom changes, and its equity interests usually are not traded publicly. A minority public ownership, however, does not preclude an entity from being a joint venture. As distinguished from a corporate joint venture, a joint venture is not limited to corporate entities.\"><span>Joint Venture</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2023-05/\" class=\"xref\">Accounting Standards Update No. 2023-05</a></td><td class=\"entry\">08/23/2023</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lease\" class=\"term\" title=\"A contract, or part of a contract, that conveys the right to control the use of identified property, plant, or equipment (an identified asset) for a period of time in exchange for consideration.\"><span>Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lessee\" class=\"term\" title=\"An entity that enters into a contract to obtain the right to use an underlying asset for a period of time in exchange for consideration.\"><span>Lessee</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lessor\" class=\"term\" title=\"An entity that enters into a contract to provide the right to use an underlying asset for a period of time in exchange for consideration.\"><span>Lessor</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/r/#reinsurance\" class=\"term\" title=\"A transaction in which a reinsurer (assuming entity), for a consideration (premium), assumes all or part of a risk undertaken originally by another insurer (ceding entity). For indemnity reinsurance, the legal rights of the insured are not affected by the reinsurance transaction and the insurance entity issuing the insurance contract remains liable to the insured for payment of policy benefits. Assumption or novation reinsurance contracts that are legal replacements of one insurer by another extinguish the ceding entity's liability to the policyholder.\"><span>Reinsurance</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/t/#transaction-price\" class=\"term\" title=\"The amount of consideration to which an entity expects to be entitled in exchange for transferring promised goods or services to a customer, excluding amounts collected on behalf of third parties.\"><span>Transaction Price</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/glossary/u/#underlying-asset\" class=\"term\" title=\"An asset that is the subject of a lease for which a right to use that asset has been conveyed to a lessee. The underlying asset could be a physically distinct portion of a single asset.\"><span>Underlying Asset</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><strong class=\"ph b\">Variable Interest Entity</strong></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2025-03/\" class=\"xref\">Accounting Standards Update No. 2025-03</a></td><td class=\"entry\">05/12/2025</td></tr><tr><td class=\"entry\"><a href=\"/glossary/v/#variable-lease-payments\" class=\"term\" title=\"Payments made by a lessee to a lessor for the right to use an underlying asset that vary because of changes in facts or circumstances occurring after the commencement date, other than the passage of time.\"><span>Variable Lease Payments</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/450/10/#450-10-15-2A\" class=\"xref\">450-10-15-2A</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2023-05/\" class=\"xref\">Accounting Standards Update No. 2023-05</a></td><td class=\"entry\">08/23/2023</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/10/#450-10-15-2A\" class=\"xref\">450-10-15-2A</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2010-07/\" class=\"xref\">Accounting Standards Update No. 2010-07</a></td><td class=\"entry\">01/28/2010</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/10/#450-10-60-1\" class=\"xref\">450-10-60-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2025-11/\" class=\"xref\">Accounting Standards Update No. 2025-11</a></td><td class=\"entry\">12/08/2025</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/10/#450-10-60-2\" class=\"xref\">450-10-60-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/10/#450-10-60-3\" class=\"xref\">450-10-60-3</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/10/#450-10-60-4\" class=\"xref\">450-10-60-4</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/10/#450-10-60-8\" class=\"xref\">450-10-60-8</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/10/#450-10-60-12\" class=\"xref\">450-10-60-12</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\nAcquirer | Amended | Accounting Standards Update No. 2025-03 | 05/12/2025 |\nAcquisition …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c3f946ffe4cc04978fdb3ddb8b9302d3988a197113eb3fe2e59cc9d89d855a2d","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:49.502Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482980","source_sha256":"e2c9be776e0137454ffade80893e0edb977ba9b9c6681d7dc9355e6c0e07f78c"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e95d815127e0945d72c6f2dda22bd09e408de89e36916cc4ca6971e5d0545b8c","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:49.502Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482980","source_sha256":"e2c9be776e0137454ffade80893e0edb977ba9b9c6681d7dc9355e6c0e07f78c"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b82ae467ee8d6c224e0572cee13f67372e62bd222f34c75a13421e0a630d547d","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:49.502Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482980","source_sha256":"e2c9be776e0137454ffade80893e0edb977ba9b9c6681d7dc9355e6c0e07f78c"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-10-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The Contingencies Topic includes the following Subtopics:<ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\">Overall</div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\">Loss Contingencies</div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\">Gain Contingencies.</div></li></ol></div></div>","snippet":"The Contingencies Topic includes the following Subtopics:\n(a) Overall\n(b) Loss Contingencies\n(c) Gain Contingencies.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:af9090e7997e2345ae0213db18cab20c0ea58f3f8120f3c715b97204bc601ddd","downloaded_from":"2026-09-10T00:26:51.228Z","last_downloaded_at":"2026-09-10T00:26:51.228Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482952","source_sha256":"9694d1bf51ed188feec4119e03e3c903dddc1a06e6247bb9fede77279fbbc241"}},{"citation":"450-10-05-2","para":"05-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic, in combination with Subtopics <a altsource=\"GUID-E13146CA-1337-48D7-BF5C-574604DA8631.ditamap\" class=\"ditamap\">450-20</a> and <a altsource=\"GUID-96A265EB-2596-421B-9B8C-8112197B547C.ditamap\" class=\"ditamap\">450-30</a>, provides general guidance regarding gain and loss contingencies. Other Topics include gain or loss contingencies related to those specific Topics. Therefore, the Contingencies Topic does not include all standards related to contingencies. While not intended to be all-inclusive, the following Relationships Sections within the Contingency Subtopics provide links to many Topic-specific contingencies: <ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\">See Section <a altsource=\"GUID-F441826A-E9B7-4618-8CA8-2B698BB0A5DF.ditamap\" class=\"ditamap\">450-10-60</a> for references to other standards related to uncertainties that could result in either a gain or a loss. </div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\">See Section <a altsource=\"GUID-1DDD8F86-F868-4D66-8C17-BBDC08B1D63F.ditamap\" class=\"ditamap\">450-20-60</a> for references to other standards related to uncertainties that could result in a future loss.</div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\">See Section <a altsource=\"GUID-2110170A-1031-4515-8E24-EE95DD64197D.ditamap\" class=\"ditamap\">450-30-60</a> for references to other standards related to uncertainties that could result in a future gain. </div></li></ol></div></div>","snippet":"This Subtopic, in combination with Subtopics 450-20 and 450-30, provides general guidance regarding gain and loss contingencies. Other Topics include gain or loss contingencies related to those specific Topics. Therefore…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:31ee26c79761ce3524e0026394e59da0e94221970b42aeb186254e038fb12953","downloaded_from":"2026-09-10T00:26:51.228Z","last_downloaded_at":"2026-09-10T00:26:51.228Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482952","source_sha256":"9694d1bf51ed188feec4119e03e3c903dddc1a06e6247bb9fede77279fbbc241"}},{"citation":"450-10-05-3","para":"05-3","html":"<div class=\"asc-body\"><div class=\"norm-text\">The Overall Subtopic establishes the scope and scope exceptions for the Contingencies Topic, provides definitions, and includes links to the standards that appear in Subtopics <a altsource=\"GUID-E13146CA-1337-48D7-BF5C-574604DA8631.ditamap\" class=\"ditamap\">450-20</a> and <a altsource=\"GUID-96A265EB-2596-421B-9B8C-8112197B547C.ditamap\" class=\"ditamap\">450-30</a>.</div></div>","snippet":"The Overall Subtopic establishes the scope and scope exceptions for the Contingencies Topic, provides definitions, and includes links to the standards that appear in Subtopics 450-20 and 450-30.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e0e5def74d271c1620f9514f2a77eb2aa07b770ae268e10194e6ecdbcdfdf160","downloaded_from":"2026-09-10T00:26:51.228Z","last_downloaded_at":"2026-09-10T00:26:51.228Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482952","source_sha256":"9694d1bf51ed188feec4119e03e3c903dddc1a06e6247bb9fede77279fbbc241"}},{"citation":"450-10-05-4","para":"05-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_58C6D3BC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The Contingencies Topic establishes standards of financial accounting and reporting for loss contingencies and gain contingencies, including standards for disclosures. </span></span></div></div>","snippet":"The Contingencies Topic establishes standards of financial accounting and reporting for loss contingencies and gain contingencies, including standards for disclosures.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:77f02b6460af6d20a085a18366a68b39087022ec5f3f0a44c9e1e00ad6f30544","downloaded_from":"2026-09-10T00:26:51.228Z","last_downloaded_at":"2026-09-10T00:26:51.228Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482952","source_sha256":"9694d1bf51ed188feec4119e03e3c903dddc1a06e6247bb9fede77279fbbc241"}},{"citation":"450-10-05-5","para":"05-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_58C6D592-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Resolution of the uncertainty may confirm any of the following: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_58C6D720-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The acquisition of an asset </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_58C6D8D4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The reduction of a liability </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_58C6DA72-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The loss or impairment of an asset </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">d</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_58C6DB9A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The incurrence of a liability. </span></span></div></li></ol></div></div>","snippet":"Resolution of the uncertainty may confirm any of the following:\n(a) The acquisition of an asset\n(b) The reduction of a liability\n(c) The loss or impairment of an asset\n(d) The incurrence of a liability.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:864a0ca740fb1cc0deec8b2be5033c09f41ab59628182a9284e73513cf9470a9","downloaded_from":"2026-09-10T00:26:51.228Z","last_downloaded_at":"2026-09-10T00:26:51.228Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482952","source_sha256":"9694d1bf51ed188feec4119e03e3c903dddc1a06e6247bb9fede77279fbbc241"}},{"citation":"450-10-05-6","para":"05-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_58C6DCB5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Not all uncertainties inherent in the accounting process give rise to <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingencies</span></a>. </span></span><span class=\"sfragment\" id=\"sfr_58C6DDF2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Estimates are required in financial statements for many ongoing and recurring activities of an entity. The mere fact that an estimate is involved does not of itself constitute the type of uncertainty referred to in the definition of a loss contingency or a gain contingency. Several examples of situations that are not contingencies are included in Section <a altsource=\"GUID-6A3C6D72-47FD-4CFB-822D-B134C9EDDDE5.ditamap\" class=\"ditamap\">450-10-55</a>. </span></span></div></div>","snippet":"Not all uncertainties inherent in the accounting process give rise to contingencies. Estimates are required in financial statements for many ongoing and recurring activities of an entity. The mere fact that an estimate i…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:627e871f1bab0c7766f7a5cca1bf91ce184bc5051680e73e258be875ae3be6e2","downloaded_from":"2026-09-10T00:26:51.228Z","last_downloaded_at":"2026-09-10T00:26:51.228Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482952","source_sha256":"9694d1bf51ed188feec4119e03e3c903dddc1a06e6247bb9fede77279fbbc241"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2f1cd0d4aec72a7e462bb8915e0157a3735ba0ec42cea5d4583b56aedb737b72","downloaded_from":"2026-09-10T00:26:51.228Z","last_downloaded_at":"2026-09-10T00:26:51.228Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482952","source_sha256":"9694d1bf51ed188feec4119e03e3c903dddc1a06e6247bb9fede77279fbbc241"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:14aade1666094bf5a34d71ac616c74e8720c22222fa0307bab67383de12647e3","downloaded_from":"2026-09-10T00:26:51.228Z","last_downloaded_at":"2026-09-10T00:26:51.228Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482952","source_sha256":"9694d1bf51ed188feec4119e03e3c903dddc1a06e6247bb9fede77279fbbc241"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"450-10-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The Scope Section of the Overall Subtopic establishes the pervasive scope for all Subtopics of the Contingencies Topic. Unless explicitly addressed within specific Subtopics, the following scope guidance applies to all Subtopics of the Contingencies Topic.</div></div>","snippet":"The Scope Section of the Overall Subtopic establishes the pervasive scope for all Subtopics of the Contingencies Topic. Unless explicitly addressed within specific Subtopics, the following scope guidance applies to all S…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8fc9c5fa8333d379398c7536a10553a27d452e9fe8264628e77319e965daccc2","downloaded_from":"2026-09-10T00:26:53.128Z","last_downloaded_at":"2026-09-10T00:26:53.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482935","source_sha256":"dbb11eeea9ae730a3470a37fdac9cdee84d810320750d558c94928df7d4c66e6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1aece6a591e07742d9505796d34db6c6573573ae1bc7026f40bd2ee583e01bc4","downloaded_from":"2026-09-10T00:26:53.128Z","last_downloaded_at":"2026-09-10T00:26:53.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482935","source_sha256":"dbb11eeea9ae730a3470a37fdac9cdee84d810320750d558c94928df7d4c66e6"}},{"block":null,"heading":"Entities","paragraphs":[{"citation":"450-10-15-2","para":"15-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">The guidance in the Contingencies Topic applies to all entities.</div></div>","snippet":"The guidance in the Contingencies Topic applies to all entities.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6d8eb0edc7f20ac82989abf9ffd6e21d92ae329e42e8391104657917068abd54","downloaded_from":"2026-09-10T00:26:53.128Z","last_downloaded_at":"2026-09-10T00:26:53.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482935","source_sha256":"dbb11eeea9ae730a3470a37fdac9cdee84d810320750d558c94928df7d4c66e6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1e9413c58e2072cea1d7685b1f6628c02a062f8ba757a4455e16aff59c3aca00","downloaded_from":"2026-09-10T00:26:53.128Z","last_downloaded_at":"2026-09-10T00:26:53.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482935","source_sha256":"dbb11eeea9ae730a3470a37fdac9cdee84d810320750d558c94928df7d4c66e6"}},{"block":null,"heading":"Transactions","paragraphs":[{"citation":"450-10-15-2A","para":"15-2A","html":"<div class=\"asc-body\"><div class=\"norm-text\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"GUID-788346DA-516E-40D7-B82B-35125AE63B2C\"><span class=\"sfragment-source\">The guidance in the Contingencies Topic does not apply to the recognition and initial measurement of assets or liabilities arising from contingencies that are measured at fair value or assets arising from contingencies measured at an amount other than fair value on the <a href=\"/glossary/a/#acquisition-date\" class=\"term\" title=\"The date on which the acquirer obtains control of the acquiree.\"><span>acquisition date</span></a> in a business combination </span></span><span class=\"sfragment\" id=\"GUID-F6BE5D6D-61AC-4E7E-8B4F-2B6A753C3632\"><span class=\"sfragment-source\">under the requirements of Subtopic <a altsource=\"GUID-4C20CF40-DD8D-4F61-94A7-35C477A5F96C.ditamap\" class=\"ditamap\">805-20</a>, on the acquisition date in </span></span><span class=\"sfragment\" id=\"GUID-5996410A-B197-4D3E-AE77-C6AC1D7504CD\"><span class=\"sfragment-source\">an <a href=\"/glossary/a/#acquisition-by-a-not-for-profit-entity\" class=\"term\" title=\"A transaction or other event in which a not-for-profit acquirer obtains control of one or more nonprofit activities or businesses and initially recognizes their assets and liabilities in the acquirer's financial statements. When applicable guidance in Topic 805 is applied by a not-for-profit entity, the term business combination has the same meaning as this term has for a for-profit entity. Likewise, a reference to business combinations in guidance that links to Topic 805 has the same meaning as a reference to acquisitions by not-for-profit entities.\"><span>acquisition by a not-for-profit entity</span></a> under the requirements of Subtopic <a altsource=\"GUID-8F421D1C-F467-4235-96C7-D5FDABFEFC13.ditamap\" class=\"ditamap\">958-805</a>, </span></span><span class=\"sfragment\" id=\"GUID-5601690A-60FA-4099-8E6E-FD23C1364187\"><span class=\"sfragment-source\">or on the <a href=\"/glossary/f/#formation-date\" class=\"term\" title=\"The formation date of a joint venture is the date on which an entity initially meets the definition of a joint venture, which is not necessarily the legal entity formation date. The formation date is the measurement date for the formation transaction. If multiple arrangements are accounted for as a single transaction that establishes the formation of a joint venture, the formation date is the measurement date for all arrangements that form part of the single formation transaction.\"><span>formation date</span></a> in a <a href=\"/glossary/j/#joint-venture\" class=\"term\" title=\"An entity owned and operated by a small group of businesses (the joint venturers) as a separate and specific business or project for the mutual benefit of the members of the group. A government may also be a member of the group. The purpose of a joint venture frequently is to share risks and rewards in developing a new market, product, or technology; to combine complementary technological knowledge; or to pool resources in developing production or other facilities. A joint venture also usually provides an arrangement under which each joint venturer may participate, directly or indirectly, in the overall management of the joint venture. Joint venturers thus have an interest or relationship other than as passive investors. An entity that is a subsidiary of one of the joint venturers is not a joint venture. The ownership of a joint venture seldom changes, and its equity interests usually are not traded publicly. A minority public ownership, however, does not preclude an entity from being a joint venture. As distinguished from a corporate joint venture, a joint venture is not limited to corporate entities.\"><span>joint venture</span></a> formation under the requirements of Subtopic <a altsource=\"GUID-CE09B826-CDC8-43FF-A1EF-FB86248E753A.ditamap\" class=\"ditamap\">805-60</a>. </span></span><span class=\"sfragment\" id=\"GUID-4B698D20-E90C-4474-B185-68EB5C7B961E\"><span class=\"sfragment-source\">Those Subtopics provide the recognition and initial measurement requirements for assets and liabilities arising from contingencies measured at fair value and for assets arising from contingencies measured at an amount other than fair value as part of a business combination, an acquisition by a not-for-profit entity, </span></span><span class=\"sfragment\" id=\"GUID-D4162852-F734-4279-A6E6-D879B4C7C934\"><span class=\"sfragment-source\">or a joint venture formation. </span></span></div></div></div>","snippet":"The guidance in the Contingencies Topic does not apply to the recognition and initial measurement of assets or liabilities arising from contingencies that are measured at fair value or assets arising from contingencies m…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:29d8a24ce6f45a493f4480db3f03a45d62710644d7a3cc28081e8e55bd71c830","downloaded_from":"2026-09-10T00:26:53.128Z","last_downloaded_at":"2026-09-10T00:26:53.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482935","source_sha256":"dbb11eeea9ae730a3470a37fdac9cdee84d810320750d558c94928df7d4c66e6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3fbca5f90d013bc72755819086925503ba244d5c16e66c013608634610ea1882","downloaded_from":"2026-09-10T00:26:53.128Z","last_downloaded_at":"2026-09-10T00:26:53.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482935","source_sha256":"dbb11eeea9ae730a3470a37fdac9cdee84d810320750d558c94928df7d4c66e6"}},{"block":null,"heading":"Other Considerations","paragraphs":[{"citation":"450-10-15-3","para":"15-3","html":"<div class=\"asc-body\"><div class=\"norm-text\">In some cases, there may be uncertainty about whether a situation is a <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingency</span></a>. Section <a altsource=\"GUID-6A3C6D72-47FD-4CFB-822D-B134C9EDDDE5.ditamap\" class=\"ditamap\">450-10-55</a> includes several situations that are not contingencies, and thus are outside the scope of the Contingencies Topic.</div></div>","snippet":"In some cases, there may be uncertainty about whether a situation is a contingency. Section 450-10-55 includes several situations that are not contingencies, and thus are outside the scope of the Contingencies Topic.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d4d79207c2ea93050c4e358ac138c006ecff534a3ea3ce61ef34a7340339b98e","downloaded_from":"2026-09-10T00:26:53.128Z","last_downloaded_at":"2026-09-10T00:26:53.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482935","source_sha256":"dbb11eeea9ae730a3470a37fdac9cdee84d810320750d558c94928df7d4c66e6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e4c7bf21777996cc0b113799602a69041da891399ca2feac3bd4bbb924ba666c","downloaded_from":"2026-09-10T00:26:53.128Z","last_downloaded_at":"2026-09-10T00:26:53.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482935","source_sha256":"dbb11eeea9ae730a3470a37fdac9cdee84d810320750d558c94928df7d4c66e6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:812c92cee2e8f5e15195e83500493732c46f77ae84e865e184f11c4627e0739c","downloaded_from":"2026-09-10T00:26:53.128Z","last_downloaded_at":"2026-09-10T00:26:53.128Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482935","source_sha256":"dbb11eeea9ae730a3470a37fdac9cdee84d810320750d558c94928df7d4c66e6"}},{"number":"55","label":"55 Implementation Guidance and Illustrations","anchor":"55-implementation-guidance-and-illustrations","is_sec":false,"groups":[{"block":null,"heading":"Implementation Guidance","paragraphs":[{"citation":"450-10-55-1","para":"55-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Section includes several situations that do not meet the definition of a <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingency</span></a>, and thus are outside the scope of this Topic.</div></div>","snippet":"This Section includes several situations that do not meet the definition of a contingency, and thus are outside the scope of this Topic.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:314d359f0a3d482ebb9f4b75c1f2d6a869998fc2fb45d27740931f84484f8f03","downloaded_from":"2026-09-10T00:26:56.894Z","last_downloaded_at":"2026-09-10T00:26:56.894Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483084","source_sha256":"2ecae4e59c490f553b986271d61b41c1f55afb0eb2fee272ba1f555511c0ed12"}},{"citation":"450-10-55-2","para":"55-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_58E30A33-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The fact that estimates are used to allocate the known cost of a depreciable asset over the period of use by an entity does not make depreciation a contingency; the eventual expiration of the utility of the asset is not uncertain. Thus, depreciation of assets is not a contingency, nor are such matters as recurring repairs, maintenance, and overhauls, which interrelate with depreciation. </span></span><span class=\"sfragment\" id=\"sfr_58E30C4B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Topic is not intended to alter present depreciation practices as described in Section <a altsource=\"GUID-DB49B5A7-DC7E-40FE-86DC-A5103AAF103A.ditamap\" class=\"ditamap\">360-10-35</a>. </span></span></div></div>","snippet":"The fact that estimates are used to allocate the known cost of a depreciable asset over the period of use by an entity does not make depreciation a contingency; the eventual expiration of the utility of the asset is not …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:56896f8f0fe518f4a01131651258f1523b3c2951cac3ddfc7b65167c6de66bca","downloaded_from":"2026-09-10T00:26:56.894Z","last_downloaded_at":"2026-09-10T00:26:56.894Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483084","source_sha256":"2ecae4e59c490f553b986271d61b41c1f55afb0eb2fee272ba1f555511c0ed12"}},{"citation":"450-10-55-3","para":"55-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_58E30E07-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Amounts owed for services received, such as advertising and utilities, are not contingencies even though the accrued amounts may have been estimated; there is nothing uncertain about the fact that those obligations have been incurred. </span></span></div></div>","snippet":"Amounts owed for services received, such as advertising and utilities, are not contingencies even though the accrued amounts may have been estimated; there is nothing uncertain about the fact that those obligations have …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:eb2eaa2bafdd85a4c69336f795bc24ad518faeefd1eafaa5bf91a2eb1ebe394c","downloaded_from":"2026-09-10T00:26:56.894Z","last_downloaded_at":"2026-09-10T00:26:56.894Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483084","source_sha256":"2ecae4e59c490f553b986271d61b41c1f55afb0eb2fee272ba1f555511c0ed12"}},{"citation":"450-10-55-4","para":"55-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_58E30F9C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The possibility of a change in the tax law in some future year is not an uncertainty. </span></span></div></div>","snippet":"The possibility of a change in the tax law in some future year is not an uncertainty.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:12ac4deb39b1145400ff2c4eaff1fdba04285ae6a6d541be02bda39db2bef179","downloaded_from":"2026-09-10T00:26:56.894Z","last_downloaded_at":"2026-09-10T00:26:56.894Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483084","source_sha256":"2ecae4e59c490f553b986271d61b41c1f55afb0eb2fee272ba1f555511c0ed12"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:886325e4acab4b2f0e09d0703d35dfe62377039e7fd421ac0f09cfe5fb4f31e1","downloaded_from":"2026-09-10T00:26:56.894Z","last_downloaded_at":"2026-09-10T00:26:56.894Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483084","source_sha256":"2ecae4e59c490f553b986271d61b41c1f55afb0eb2fee272ba1f555511c0ed12"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7eede4c9ddfb21aed2bb048ba44600fa724cfca6d707588ae31bb693ba874990","downloaded_from":"2026-09-10T00:26:56.894Z","last_downloaded_at":"2026-09-10T00:26:56.894Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483084","source_sha256":"2ecae4e59c490f553b986271d61b41c1f55afb0eb2fee272ba1f555511c0ed12"}},{"number":"60","label":"60 Relationships","anchor":"60-relationships","is_sec":false,"groups":[{"block":null,"heading":"Interim Reporting","paragraphs":[{"citation":"450-10-60-1","para":"60-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590AC404-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingencies</span></a> and other uncertainties that could be expected to affect the fairness of presentation of financial data at an interim date, see paragraph <a href=\"/asc/270/10/#270-10-50-6\" class=\"xref\">270-10-50-6</a>. </span></span></div><div class=\"div pending-text\" id=\"d3e11419-108343__GUID-76F3CCB1-5F1F-4DAD-AAD0-D9664061DF0C\"><div class=\"div date-effective\"><span class=\"transition-header\">Transition date:</span><span class=\"p-alphabet\">(P) December 16, 2027; (N) December 16, 2028</span><span class=\"transition-header pipe-separator\">Transition guidance:</span></div><a href=\"/asc/270/10/#270-10-65-1\" class=\"xref\">270-10-65-1</a><span class=\"sfragment\" id=\"GUID-4E55D18D-F3F0-4357-83DE-0CEE884EBDD5\"><span class=\"sfragment-source\">For <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingencies</span></a> and other uncertainties that could be expected to affect the fairness of presentation of financial data at an interim date, see paragraph </span></span><span class=\"sfragment\" id=\"GUID-B74122A6-FF3E-4A6F-8D2D-50C7CEE297FF\"><span class=\"sfragment-source\"><a href=\"/asc/270/10/#270-10-50-69\" class=\"xref\">270-10-50-69</a>.</span></span></div></div>","snippet":"For contingencies and other uncertainties that could be expected to affect the fairness of presentation of financial data at an interim date, see paragraph 270-10-50-6. Transition date:(P) December 16, 2027; (N) December…","pending":true,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dccb8ebac5dc0a4dbcef837b5f8c6c0de870395431499278af0ec73a1a1ebd95","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c6cdf722703e20fdc717e45b5a52dc71a0c5650fee152604316b921f41383715","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"block":null,"heading":"Other Assets and Deferred Costs","paragraphs":[{"citation":"450-10-60-2","para":"60-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590AC534-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies associated with insurance and <a href=\"/glossary/r/#reinsurance\" class=\"term\" title=\"A transaction in which a reinsurer (assuming entity), for a consideration (premium), assumes all or part of a risk undertaken originally by another insurer (ceding entity). For indemnity reinsurance, the legal rights of the insured are not affected by the reinsurance transaction and the insurance entity issuing the insurance contract remains liable to the insured for payment of policy benefits. Assumption or novation reinsurance contracts that are legal replacements of one insurer by another extinguish the ceding entity's liability to the policyholder.\"><span>reinsurance</span></a> contracts that do not transfer insurance risk, see Section <a altsource=\"GUID-3460DAA7-3926-4A35-BF19-FD8C42B70408.ditamap\" class=\"ditamap\">340-30</a>. </span></span></div></div>","snippet":"For contingencies associated with insurance and reinsurance contracts that do not transfer insurance risk, see Section 340-30.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:439ffd5b9332cbdf78c4dfe4e625f960e9b59fae1e1fcc08360ab72a96a44129","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:96c9448a7123f97b1464bb1fc635bb3d1d166da6eb868da65c4620d849938442","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"block":null,"heading":"Revenue Recognition","paragraphs":[{"citation":"450-10-60-3","para":"60-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590AC618-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See the guidance on estimating and constraining estimates of variable consideration (for example, a sale with a right of return) in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/606/10/#606-10-32-5\" class=\"xref\">606-10-32-5 through 32-14</a></div> included in the <a href=\"/glossary/t/#transaction-price\" class=\"term\" title=\"The amount of consideration to which an entity expects to be entitled in exchange for transferring promised goods or services to a customer, excluding amounts collected on behalf of third parties.\"><span>transaction price</span></a> for <a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>contracts</span></a> with <a href=\"/glossary/c/#customer\" class=\"term\" title=\"A party that has contracted with an entity to obtain goods or services that are an output of the entity's ordinary activities in exchange for consideration.\"><span>customers</span></a>.</span></span></div></div>","snippet":"See the guidance on estimating and constraining estimates of variable consideration (for example, a sale with a right of return) in paragraphs 606-10-32-5 through 32-14 included in the transaction price for contracts wit…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dbbfb063978e921d2cbba25e69d50ee03ff995ac537de8fbf50e59862e4ac900","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"citation":"450-10-60-4","para":"60-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590AC71C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For cases in which a nonmonetary asset is destroyed or damaged (that is, an involuntary conversion) and the amount of monetary assets to be received is uncertain, see paragraph <a href=\"/asc/610/30/#610-30-25-4\" class=\"xref\">610-30-25-4</a>. </span></span></div></div>","snippet":"For cases in which a nonmonetary asset is destroyed or damaged (that is, an involuntary conversion) and the amount of monetary assets to be received is uncertain, see paragraph 610-30-25-4.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2ae14203fe784f503bd7f0bae1cf1e3c26d85101563e9894a7aa23c08e9797ee","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3aac1ecc8750972cbb998771868feb9979cb2642540234e01876373923afb08c","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"block":null,"heading":"Other Expenses","paragraphs":[{"citation":"450-10-60-5","para":"60-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590AC819-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For accounting by an insured entity for the contingencies associated with a multiple-year retrospectively rated insurance contract accounted for as insurance, see the Multiple-Year Retrospectively Rated Contracts Subsections of Subtopic <a altsource=\"GUID-2ED7ACCB-8936-4974-98DA-A89EAD3FE6D0.ditamap\" class=\"ditamap\">720-20</a>. </span></span></div></div>","snippet":"For accounting by an insured entity for the contingencies associated with a multiple-year retrospectively rated insurance contract accounted for as insurance, see the Multiple-Year Retrospectively Rated Contracts Subsect…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1842f03be17752ab8bd8b26ea6aaf4b02135085f16cc64fd7bdf643902b21216","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c5fed380dd3d80486f830cc8fee17f2730b7a8036071d6410cfa054e24f5a9e0","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"block":null,"heading":"Income Taxes","paragraphs":[{"citation":"450-10-60-6","para":"60-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590AC8FA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For accounting for uncertainty in income taxes, see Section <a altsource=\"GUID-7958AA0A-7DBB-49C1-ABB1-099225AE13D3.ditamap\" class=\"ditamap\">740-10-25</a>. </span></span></div></div>","snippet":"For accounting for uncertainty in income taxes, see Section 740-10-25.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:78e965bd7e304b561e8247863e8cecea175245534cae1a336e46a4a950546353","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:955b86782af22c0874295e3c5907b36989ab6316a7dc2f3902e808eb6798fadb","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"block":null,"heading":"Business Combinations","paragraphs":[{"citation":"450-10-60-7","para":"60-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590AC9DD-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For recognition of contingent obligations for contractual termination benefits and curtailment losses under employee benefit plans that will be triggered by the consummation of the business combination, see paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/805/20/#805-20-55-50\" class=\"xref\">805-20-55-50 through 55-51</a></div>. </span></span></div></div>","snippet":"For recognition of contingent obligations for contractual termination benefits and curtailment losses under employee benefit plans that will be triggered by the consummation of the business combination, see paragraphs 80…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4249ec5923e517c1c9c5b747a6ea463f59b61c823d76e18fd73ea44d86199815","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:646fcb54d8a06dcff9af12f293c0d0447a86d714ca370671a2d0a9f1af8da832","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"block":null,"heading":"Leases","paragraphs":[{"citation":"450-10-60-8","para":"60-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590ACB83-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For <a href=\"/glossary/v/#variable-lease-payments\" class=\"term\" title=\"Payments made by a lessee to a lessor for the right to use an underlying asset that vary because of changes in facts or circumstances occurring after the commencement date, other than the passage of time.\"><span>variable lease payments</span></a>, see paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/842/20/#842-20-55-1\" class=\"xref\">842-20-55-1 through 55-2</a></div>. </span></span></div></div>","snippet":"For variable lease payments, see paragraphs 842-20-55-1 through 55-2.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:33e1bd95bf2643cf179a17d15282862043e417dd03da6cab874a7a5bdac278a6","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:45853c67c385068704a2fe2d75370d7c7c457a8d1759deb23271a0ebb928dbda","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"block":null,"heading":"Financial Services—Insurance","paragraphs":[{"citation":"450-10-60-9","para":"60-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590ACC52-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies that arise when an insurance entity or a reinsurance entity issues an insurance contract, see Subtopic <a altsource=\"GUID-DE23C1D2-8518-4C4F-B092-B41011D05673.ditamap\" class=\"ditamap\">944-40</a>. </span></span></div></div>","snippet":"For contingencies that arise when an insurance entity or a reinsurance entity issues an insurance contract, see Subtopic 944-40.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:69b99245b3656f51e931190c3a56a327a40d0bdd9acd72cbd4ec45d9063c3308","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"citation":"450-10-60-10","para":"60-10","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590ACD1E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies associated with a reinsurance contract between insurance entities (including retrocession), see Section <a altsource=\"GUID-D419DBDC-F5E9-4982-9FEC-8C9AD90DCC4D.ditamap\" class=\"ditamap\">944-20-15</a>. </span></span></div></div>","snippet":"For contingencies associated with a reinsurance contract between insurance entities (including retrocession), see Section 944-20-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f47ee3b52f4a646b58c708923736844b21824726d6b86b261376b1eb080c8fba","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"citation":"450-10-60-11","para":"60-11","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_590ACDE1-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies associated with multiple-year retrospectively rated contracts, see Subtopic <a altsource=\"GUID-F4341DED-0F5B-433D-8291-11B4BCC32084.ditamap\" class=\"ditamap\">944-20</a>. </span></span></div></div>","snippet":"For contingencies associated with multiple-year retrospectively rated contracts, see Subtopic 944-20.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6f2e7ee9fd9435895dbea512cca743bb6e99cc72d6ab7fd86a171ae104e2225c","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}},{"citation":"450-10-60-12","para":"60-12","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-09</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-09.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:920124ee7cd6d1ae6c78280037c722e90c79181b4fc0d8d773f0716cc8624c70","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:92fe5dacecd0624e32f360796488a1305314b5d090fc102cd085c0323ab2508a","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f86bc0a72198972d02a7aeb1989c776de602743646d4b02af383e3acb4c28350","downloaded_from":"2026-09-10T00:26:58.831Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483058","source_sha256":"61aacd54a222502413a12c137b3bd7034da6f413400de91de9d9100a8da3fe99"}}],"enrichment":{"summary":"ASC 450-10 is the Overall subtopic of the Contingencies Topic; it sets the pervasive scope, definitions, and cross-references for gain and loss contingencies addressed in 450-20 and 450-30. A contingency exists when an existing condition, situation, or set of circumstances involves uncertainty that will be resolved by a future event confirming the acquisition of an asset, reduction of a liability, loss or impairment of an asset, or incurrence of a liability (450-10-05-5). Critically, the mere use of an estimate does not create a contingency (450-10-05-6), and the Topic does not apply to recognition and initial measurement of contingency-related assets and liabilities measured at fair value in a business combination, NFP acquisition, or joint venture formation (450-10-15-2A).","key_points":["Resolution of the uncertainty must confirm one of four outcomes: acquisition of an asset, reduction of a liability, loss or impairment of an asset, or incurrence of a liability (450-10-05-5).","Not all uncertainty is a contingency — the fact that an estimate is involved does not itself create a loss or gain contingency (450-10-05-6).","The Contingencies Topic applies to all entities (450-10-15-2), but excludes recognition and initial measurement of assets and liabilities arising from contingencies measured at fair value (and assets measured at other than fair value) on the acquisition date under Subtopic 805-20, 958-805, or on the formation date under 805-60 (450-10-15-2A).","Depreciation, and related recurring repairs, maintenance, and overhauls, are not contingencies because expiration of the asset's utility is not uncertain (450-10-55-2).","Accrued amounts owed for services already received, such as advertising and utilities, are not contingencies even if estimated, because the obligation has definitely been incurred (450-10-55-3).","The possibility of a future change in the tax law is not an uncertainty within the meaning of the Topic (450-10-55-4).","ASC 450 is not all-inclusive; Topic-specific contingency guidance exists elsewhere (e.g., uncertainty in income taxes at 740-10-25, variable consideration at 606-10-32-5 through 32-14, variable lease payments at 842-20-55-1 through 55-2, insurance contracts at 944-40)."],"categories":["Contingencies and guarantees","Recognition","Disclosure","Business combinations"],"audience_level":"introductory","student_note":"This is the gatekeeping subtopic: before applying the probable/reasonably possible/remote framework of 450-20, you must first confirm you actually have a contingency. The classic error is treating any estimated accrual (depreciation, accrued utilities, warranty-like estimates of known obligations) as a contingency, when the defining feature is uncertainty about whether an asset or liability exists at all, resolvable only by a future event.","related_topics":["450-20","450-30","805-20","740-10","606-10","944-40"],"key_concepts":["loss contingency","gain contingency","existing condition involving uncertainty","estimates versus contingencies","scope exception for business combinations","future confirming event","disclosure of uncertainties"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2d2f1ef67aa1dfb1fb65495fc0067bd4e78700b00fbb7c645ec4b690b649a7cf","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"450-20","title":"Loss Contingencies","topic_title":"Contingencies","score":0.8777,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5ffdf086179376941947f8281b9448a0dd30199fa44f9f94fa2771390a7e88a3","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-30","title":"Gain Contingencies","topic_title":"Contingencies","score":0.8515,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d0025a508049886fc2e06cb8d45b2b514b2b213386aa192f5222878c5946bf14","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:28:10.377Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"275-10","title":"Overall","topic_title":"Risks and Uncertainties","score":0.7806,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b70fce0284c81aead55faa057a41e5e52af8a8c777f7164ec4d8f82f4683c7b5","downloaded_from":"2026-09-09T23:21:55.847Z","last_downloaded_at":"2026-09-09T23:22:20.205Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"805-20","title":"Identifiable Assets and Liabilities, and Any Noncontrolling Interest","topic_title":"Business Combinations","score":0.7695,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c1b021ce889642bbbe0cb1298c1ad890203c0a4e73d1b461136c7694250b7f64","downloaded_from":"2026-09-10T01:23:05.700Z","last_downloaded_at":"2026-09-10T01:23:57.518Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-980","title":"Regulated Operations","topic_title":"Contingencies","score":0.7657,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b11fd3eea071d5189648daebe17678828a37abfd7459be6c2141a9e4482a6b58","downloaded_from":"2026-09-10T00:29:15.540Z","last_downloaded_at":"2026-09-10T00:29:23.763Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-958","title":"Not-for-Profit Entities","topic_title":"Contingencies","score":0.7615,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f42f0da468b14f8cf09894a409d34c5f6da684d339b1cb6208fdf0918b790770","downloaded_from":"2026-09-10T00:28:58.769Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"440-954","title":"Health Care Entities","topic_title":"Commitments","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f9ea1f2b1ecf53cf30cb4b1e44a8fd238f78f04f53763128446633c5a008a6c0","downloaded_from":"2026-09-10T00:26:23.932Z","last_downloaded_at":"2026-09-10T00:26:47.512Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"450-20","title":"Loss Contingencies","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5a752b56c6bb0c09c1df5ccac33f45b1956f06a832f48dcd212c627effc55d84","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7078c1b174f841eaf9cdc5491292974a7ee2ed9947a2d7bc586cc3cef7ee22c7","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-20","topic":"450","title":"Loss Contingencies","area":"Liabilities","paragraphs":99,"summary":"ASC 450-20 governs when a loss contingency must be accrued as a charge to income and when it must instead be disclosed. A loss is accrued only if, based on information available before the financial statements are issued, it is probable that an asset was impaired or a liability incurred at the balance sheet date and the amount of loss is reasonably estimable (450-20-25-2). If the estimate is a range, the best estimate in the range is accrued, or the minimum of the range if no amount is better than any other (450-20-30-1); if accrual criteria are not met but a loss is at least reasonably possible, disclosure of the nature of the contingency and an estimate of possible loss (or a statement that none can be made) is required (450-20-50-3 through 50-4).","concepts":["loss contingency","probable, reasonably possible, remote","reasonably estimable","range of loss","minimum of range accrual","unasserted claims and assessments","pending or threatened litigation","subsequent events"],"categories":["Contingencies and guarantees","Recognition","Initial measurement","Disclosure"],"level":"introductory","topic_title":"Contingencies","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-20-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" frame=\"all\" id=\"SL6954834-158272\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#commencement-date-of-the-lease-commencement-date\" class=\"term\" title=\"The date on which a lessor makes an underlying asset available for use by a lessee. See paragraphs 842-10-55-19842-10-55-20842-10-55-21 for implementation guidance on the commencement date.\"><span>Commencement Date of the Lease (Commencement Date)</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>Contract</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lease\" class=\"term\" title=\"A contract, or part of a contract, that conveys the right to control the use of identified property, plant, or equipment (an identified asset) for a period of time in exchange for consideration.\"><span>Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lessee\" class=\"term\" title=\"An entity that enters into a contract to obtain the right to use an underlying asset for a period of time in exchange for consideration.\"><span>Lessee</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lessor\" class=\"term\" title=\"An entity that enters into a contract to provide the right to use an underlying asset for a period of time in exchange for consideration.\"><span>Lessor</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/r/#reinsurance\" class=\"term\" title=\"A transaction in which a reinsurer (assuming entity), for a consideration (premium), assumes all or part of a risk undertaken originally by another insurer (ceding entity). For indemnity reinsurance, the legal rights of the insured are not affected by the reinsurance transaction and the insurance entity issuing the insurance contract remains liable to the insured for payment of policy benefits. Assumption or novation reinsurance contracts that are legal replacements of one insurer by another extinguish the ceding entity's liability to the policyholder.\"><span>Reinsurance</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/u/#underlying-asset\" class=\"term\" title=\"An asset that is the subject of a lease for which a right to use that asset has been conveyed to a lessee. The underlying asset could be a physically distinct portion of a single asset.\"><span>Underlying Asset</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/v/#variable-lease-payments\" class=\"term\" title=\"Payments made by a lessee to a lessor for the right to use an underlying asset that vary because of changes in facts or circumstances occurring after the commencement date, other than the passage of time.\"><span>Variable Lease Payments</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-05-3\" class=\"xref\">450-20-05-3</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-15-2\" class=\"xref\">450-20-15-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-50-1\" class=\"xref\">450-20-50-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2024-03/\" class=\"xref\">Accounting Standards Update No. 2024-03</a></td><td class=\"entry\">11/04/2024</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-50-2A\" class=\"xref\">450-20-50-2A</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-50-2A\" class=\"xref\">450-20-50-2A</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2010-20/\" class=\"xref\">Accounting Standards Update No. 2010-20</a></td><td class=\"entry\">07/21/2010</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-55-4\" class=\"xref\">450-20-55-4</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/asc-pdf/GUID-6A8ECCE2-2DD0-4750-978D-D37E5AA3DC28.pdf\" class=\"pdf-link\" target=\"_blank\" rel=\"noopener\">Maintenance Update 2018-02 (PDF)</a></td><td class=\"entry\">02/02/2018</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-60-2\" class=\"xref\">450-20-60-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-60-3\" class=\"xref\">450-20-60-3</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-13/\" class=\"xref\">Accounting Standards Update No. 2016-13</a></td><td class=\"entry\">06/16/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-60-14\" class=\"xref\">450-20-60-14</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-19/\" class=\"xref\">Accounting Standards Update No. 2016-19</a></td><td class=\"entry\">12/14/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-60-15\" class=\"xref\">450-20-60-15</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-60-16\" class=\"xref\">450-20-60-16</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\nCommencement Date of the Lease (Commencement Date) | Added | Accounting Standards Update…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7abfcfe0f7f90a30d567452fb7abdb2965adc6535fa7c40008217447050c3994","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:01.778Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483035","source_sha256":"c4597937162f7721270b6a2627e761e4465d969a4f8205b8334d22d5d3ef28af"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:624ff66b2574d59a0dcd0ccc66e58f936be30a37c866a2224c8d8b9f12469d8c","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:01.778Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483035","source_sha256":"c4597937162f7721270b6a2627e761e4465d969a4f8205b8334d22d5d3ef28af"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1de09c819c8f0d6b99c2d8c819598451219ad6bad857f9b1118dc26f480a631f","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:01.778Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483035","source_sha256":"c4597937162f7721270b6a2627e761e4465d969a4f8205b8334d22d5d3ef28af"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-20-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic provides guidance for the recognition and disclosure of a <a href=\"/glossary/l/#loss-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible loss to an entity that will ultimately be resolved when one or more future events occur or fail to occur. The term loss is used for convenience to include many charges against income that are commonly referred to as expenses and others that are commonly referred to as losses.\"><span>loss contingency</span></a>.</div></div>","snippet":"This Subtopic provides guidance for the recognition and disclosure of a loss contingency.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fc5531fa2af0e245d11f4f40ca8536b96363e7133ef980629c7977ea2c68bac9","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"citation":"450-20-05-2","para":"05-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic, in combination with Subtopics <a altsource=\"GUID-6150B9DA-E825-4089-9DE1-CFF705A602B6.ditamap\" class=\"ditamap\">450-10</a> and <a altsource=\"GUID-96A265EB-2596-421B-9B8C-8112197B547C.ditamap\" class=\"ditamap\">450-30</a>, provides general guidance regarding gain and loss contingencies. Other Topics include gain or loss contingencies related to those specific Topics. Therefore, the Contingencies Topic does not include all standards related to contingencies. While not intended to be all-inclusive, the following Relationships Sections within the Contingency Subtopics provide links to many Topic-specific contingencies: <ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\">See Section <a altsource=\"GUID-F441826A-E9B7-4618-8CA8-2B698BB0A5DF.ditamap\" class=\"ditamap\">450-10-60</a> for references to other standards related to uncertainties that could result in either a gain or a loss.</div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\">See Section <a altsource=\"GUID-1DDD8F86-F868-4D66-8C17-BBDC08B1D63F.ditamap\" class=\"ditamap\">450-20-60</a> for references to other standards related to uncertainties that could result in a future loss. </div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\">See Section <a altsource=\"GUID-2110170A-1031-4515-8E24-EE95DD64197D.ditamap\" class=\"ditamap\">450-30-60</a> for references to other standards related to uncertainties that could result in a future gain. </div></li></ol></div></div>","snippet":"This Subtopic, in combination with Subtopics 450-10 and 450-30, provides general guidance regarding gain and loss contingencies. Other Topics include gain or loss contingencies related to those specific Topics. Therefore…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:aa6cd5473d021f34b82359e38f053420097fd0e3306eb2a1d1ed3562fdac1c62","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"citation":"450-20-05-3","para":"05-3","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following are examples of loss contingencies for which links are provided in Section <a altsource=\"GUID-1DDD8F86-F868-4D66-8C17-BBDC08B1D63F.ditamap\" class=\"ditamap\">450-20-60</a>: <ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F3260-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Collectibility of receivables </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F33F1-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Obligations related to product warranties and product defects </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F3531-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Risk of loss from catastrophes assumed by property and casualty insurance entities including <a href=\"/glossary/r/#reinsurance\" class=\"term\" title=\"A transaction in which a reinsurer (assuming entity), for a consideration (premium), assumes all or part of a risk undertaken originally by another insurer (ceding entity). For indemnity reinsurance, the legal rights of the insured are not affected by the reinsurance transaction and the insurance entity issuing the insurance contract remains liable to the insured for payment of policy benefits. Assumption or novation reinsurance contracts that are legal replacements of one insurer by another extinguish the ceding entity's liability to the policyholder.\"><span>reinsurance</span></a> entities </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">d</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F3674-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Guarantees of indebtedness of others </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">e</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F379F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Obligations of commercial banks under standby letters of credit </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">f</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F38D5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Agreements to repurchase receivables (or to repurchase the related property) that have been sold. </span></span></div></li></ol></div></div>","snippet":"The following are examples of loss contingencies for which links are provided in Section 450-20-60:\n(a) Collectibility of receivables\n(b) Obligations related to product warranties and product defects\n(c) Risk of loss fro…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ec4bd9670dd52178fe2069eb672ebc5e5ef3754d767a63966611452b7bc472dd","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c503caa4aed2f40ada8ee1cace5349380bfdc76563c8c2628790670f7f917ca1","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"block":null,"heading":"Dealing with Uncertainty when Accounting for Losses","paragraphs":[{"citation":"450-20-05-4","para":"05-4","html":"<div class=\"asc-body\"><div class=\"norm-text\">Accounting standards use two primary approaches to dealing with uncertainty in loss circumstances:<ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\">Recognition using a probability threshold</div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\">Measurement using a fair value objective.</div></li></ol></div></div>","snippet":"Accounting standards use two primary approaches to dealing with uncertainty in loss circumstances:\n(a) Recognition using a probability threshold\n(b) Measurement using a fair value objective.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8d9855ff65ed159a04b60e67adfe85c68cc3ff02af66e9eb1a3acb45af0fb651","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"citation":"450-20-05-5","para":"05-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_592F3A2E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Subtopic deals with uncertainty by requiring a probability threshold for recognition of a loss contingency and that the amount of the loss be reasonably estimable. </span></span><span class=\"sfragment\" id=\"sfr_592F3B6E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">As noted in paragraph <a href=\"/asc/450/20/#450-20-30-1\" class=\"xref\">450-20-30-1</a>, when both of those recognition criteria are met, and the reasonably estimable loss is a range, it requires accrual of the amount that appears to be a better estimate than any other estimate within the range, or accrual of the minimum amount in the range if no amount within the range is a better estimate than any other amount.</span></span></div></div>","snippet":"This Subtopic deals with uncertainty by requiring a probability threshold for recognition of a loss contingency and that the amount of the loss be reasonably estimable. As noted in paragraph 450-20-30-1, when both of tho…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8722f9fe6a72d2dd3e010b0a7d4d6cc76e5780839095ab076693aebab03d613f","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"citation":"450-20-05-6","para":"05-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_592F3CA4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In contrast, fair value is not an estimate of the ultimate settlement amount or the present value of an estimate of the ultimate settlement amount. </span></span><span class=\"sfragment\" id=\"sfr_592F3DCB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Uncertainty in the amount and timing of the future cash flows necessary to settle a liability and the likelihood of possible outcomes are incorporated into the measurement of the fair value of the liability. </span></span><span class=\"sfragment\" id=\"sfr_592F3F0F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> For example, a third party would charge a price to assume an uncertain liability even though the likelihood of a future sacrifice is less than <a href=\"/glossary/p/#probable\" class=\"term\" title=\"The future event or events are likely to occur.\"><span>probable</span></a>. Similarly, when the likelihood of a future sacrifice is probable, the price a third party would charge to assume an obligation incorporates expectations about some future events that are less than probable. </span></span><span class=\"sfragment\" id=\"sfr_592F4041-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Recognizing the fair value of an obligation results in recognition of some obligations for which the likelihood of future settlement, although more than zero, is less than probable from a loss contingencies perspective. </span></span></div></div>","snippet":"In contrast, fair value is not an estimate of the ultimate settlement amount or the present value of an estimate of the ultimate settlement amount. Uncertainty in the amount and timing of the future cash flows necessary …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d08235897217a0aa04f58f5c4e5fac416a9169065af76ba93f27c1e8abc6e123","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"citation":"450-20-05-7","para":"05-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_592F4193-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Because this Subtopic deals with uncertainty differently, the recognition guidance in Section <a altsource=\"GUID-6542BDA9-F133-4EFC-9114-CE7EC1619A82.ditamap\" class=\"ditamap\">450-20-25</a> is inconsistent with standards in other Topics that have an objective of measuring fair value. </span></span></div></div>","snippet":"Because this Subtopic deals with uncertainty differently, the recognition guidance in Section 450-20-25 is inconsistent with standards in other Topics that have an objective of measuring fair value.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:372d4c753301eab467f2c6b79f1d68e9e32e9e0ee90962df5282e4f5a64ca2b2","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dc48f38ff84bfaeba454c4b9a2df706f5671a1acd67401a13db19671520476a6","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"block":null,"heading":"Accruals of Loss Contingencies Do Not Provide Financial Protection","paragraphs":[{"citation":"450-20-05-8","para":"05-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_592F42D4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Accrual of a loss related to a <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingency</span></a> does not create or set aside funds to lessen the possible financial impact of a loss. Confusion exists between accounting accruals (sometimes referred to as accounting reserves) and the reserving or setting aside of specific assets to be used for a particular purpose or contingency. Accounting accruals are simply a method of allocating costs among accounting periods and have no effect on an entity's cash flow. </span></span><span class=\"sfragment\" id=\"sfr_592F4403-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Those accruals in no way protect the assets available to replace or repair uninsured property that may be lost or damaged, or to satisfy claims that are not covered by insurance, or, in the case of insurance entities, to satisfy the claims of insured parties. Accrual, in and of itself, provides no financial protection that is not available in the absence of accrual. </span></span></div></div>","snippet":"Accrual of a loss related to a contingency does not create or set aside funds to lessen the possible financial impact of a loss. Confusion exists between accounting accruals (sometimes referred to as accounting reserves)…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b2a97074e11ee9172659787a609d15e22f530ceff03ac7719dbe428a44829efd","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"citation":"450-20-05-9","para":"05-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_592F4537-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity may choose to maintain or have access to sufficient liquid assets to replace or repair lost or damaged property or to pay claims in case a loss occurs. Alternatively, it may transfer the risk to others by purchasing insurance. </span></span><span class=\"sfragment\" id=\"sfr_592F4664-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The accounting standards set forth in this Subtopic do not affect the fundamental business economics of that decision. </span></span><span class=\"sfragment\" id=\"sfr_592F4786-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">That is a financial decision, and if an entity's management decides to do neither, the presence or absence of an accrued credit balance on the balance sheet will have no effect on the consequences of that decision. </span></span><span class=\"sfragment\" id=\"sfr_592F4897-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Insurance or reinsurance reduces or eliminates risks and the inherent earnings fluctuations that accompany risks. </span></span><span class=\"sfragment\" id=\"sfr_592F49A9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Unlike insurance and reinsurance, the use of accounting reserves does not reduce or eliminate risk. The use of accounting reserves is not an alternative to insurance and reinsurance in protecting against risk. Earnings fluctuations are inherent in risk retention, and they are reported as they occur. </span></span></div></div>","snippet":"An entity may choose to maintain or have access to sufficient liquid assets to replace or repair lost or damaged property or to pay claims in case a loss occurs. Alternatively, it may transfer the risk to others by purch…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e5ce226c188ec818a1c023f07f42cff8331095bc8fbdb5d2e3f59ff9519a4cf2","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0623d7e1cbe09565d2914ea3f0bc96e53ce9a36ee9aa866819e57d0e8340811f","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"block":null,"heading":"Types of Loss Contingencies","paragraphs":[{"citation":"450-20-05-10","para":"05-10","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_592F4AE7-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The following are examples of loss contingencies that are discussed in this Subtopic: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\">Injury or damage caused by products sold</div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F4BCF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Risk of loss or damage of property by fire, explosion, or other hazards </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F4D59-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Actual or possible claims and assessments </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">d</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F4E6F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Threat of expropriation of assets </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">e</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_592F4F80-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Pending or threatened litigation. </span></span></div></li></ol></div></div>","snippet":"The following are examples of loss contingencies that are discussed in this Subtopic:\n(a) Injury or damage caused by products sold\n(b) Risk of loss or damage of property by fire, explosion, or other hazards\n(c) Actual or…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f5127f5756dee008ca463c5fb1100da72f5a751a05cd8d3022792aaa194c4e0c","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:74efaa8d80c4a121fe07ebba8daabe9f652b3bddc56c224739e4f8a16d7cce41","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9472162c66d70d5b78f31d72f538e33d562b9c64179fff4b581745fa4cf0cd9f","downloaded_from":"2026-09-10T00:27:04.682Z","last_downloaded_at":"2026-09-10T00:27:04.682Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483010","source_sha256":"94771fd7d35127e6b5ee93b18b9cccd1283de24fdadcd50548eef68d72ec65a5"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"450-20-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section <a altsource=\"GUID-F79C9E66-C38A-4844-8CA8-ED75C2A63A96.ditamap\" class=\"ditamap\">450-10-15</a>, with specific transaction exceptions noted below.</div></div>","snippet":"This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 450-10-15, with specific transaction exceptions noted below.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:afca066ba50a201d3b7fbce6f9dd0640ce7b05bd6e65aa3fc4b258939dab6b37","downloaded_from":"2026-09-10T00:27:06.347Z","last_downloaded_at":"2026-09-10T00:27:06.347Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482991","source_sha256":"65478d592fa8d93535c3cf512b127675463959483f1e41eae9bc33789f4c6498"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1786efa9f3a6902350cc92d372c0e21021ffa6463bdf682c78d15ad3641e294c","downloaded_from":"2026-09-10T00:27:06.347Z","last_downloaded_at":"2026-09-10T00:27:06.347Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482991","source_sha256":"65478d592fa8d93535c3cf512b127675463959483f1e41eae9bc33789f4c6498"}},{"block":null,"heading":"Transactions","paragraphs":[{"citation":"450-20-15-2","para":"15-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_594214AA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The following transactions are excluded from the scope of this Subtopic because they are addressed elsewhere in the Codification: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\">Stock issued to employees, which is discussed in Topic <a altsource=\"GUID-37C8A489-7666-4EF7-AB4F-17B284EC8C1C.ditamap\" class=\"ditamap\">718</a>. </div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_594215C3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Employment-related costs, including deferred compensation contracts, which are discussed in Topics <a altsource=\"GUID-5042BCF9-3F77-47CF-8C84-829A89BA53BA.ditamap\" class=\"ditamap\">710</a>, <a altsource=\"GUID-BBDA7207-7EA6-4586-BB44-826C054E8A45.ditamap\" class=\"ditamap\">712</a>, and <a altsource=\"GUID-C2CD3349-F645-4EB6-A19F-077F1113E305.ditamap\" class=\"ditamap\">715</a>. However, certain postemployment benefits are included in the scope of this Subtopic through application of paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/712/10/#712-10-25-4\" class=\"xref\">712-10-25-4 through 25-5</a></div>. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_594216D5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Uncertainty in income taxes, which is discussed in Section <a altsource=\"GUID-7958AA0A-7DBB-49C1-ABB1-099225AE13D3.ditamap\" class=\"ditamap\">740-10-25</a>. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">d</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_594217D2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Accounting and reporting by insurance entities, which is discussed in Topic <a altsource=\"GUID-D4C70B82-5C51-49E3-9F8B-C0D3501813A4.ditamap\" class=\"ditamap\">944</a>. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">e</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_594218B4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Measurement of credit losses for instruments within the scope of Topic <a altsource=\"GUID-625589DC-9B5F-442F-8EE2-DE0905FB7CE6.ditamap\" class=\"ditamap\">326</a> on measurement of credit losses.</span></span></div></li></ol></div></div>","snippet":"The following transactions are excluded from the scope of this Subtopic because they are addressed elsewhere in the Codification:\n(a) Stock issued to employees, which is discussed in Topic 718.\n(b) Employment-related cos…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2055387f8ab6244943280de094af8d248400d9b57057cd2ca62cb86aeac1971b","downloaded_from":"2026-09-10T00:27:06.347Z","last_downloaded_at":"2026-09-10T00:27:06.347Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482991","source_sha256":"65478d592fa8d93535c3cf512b127675463959483f1e41eae9bc33789f4c6498"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:101f1e2643f2e17348c03ecbc107ec5690f7cd1d4ac56d44be82fd7ad27049b6","downloaded_from":"2026-09-10T00:27:06.347Z","last_downloaded_at":"2026-09-10T00:27:06.347Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482991","source_sha256":"65478d592fa8d93535c3cf512b127675463959483f1e41eae9bc33789f4c6498"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e9cf5826e95590a8f1dc6178a3bd9f86992604628676cdd2378a9d6149de1958","downloaded_from":"2026-09-10T00:27:06.347Z","last_downloaded_at":"2026-09-10T00:27:06.347Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482991","source_sha256":"65478d592fa8d93535c3cf512b127675463959483f1e41eae9bc33789f4c6498"}},{"number":"25","label":"25 Recognition","anchor":"25-recognition","is_sec":false,"groups":[{"block":null,"heading":"General Rule","paragraphs":[{"citation":"450-20-25-1","para":"25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_594FD23A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">When a <a href=\"/glossary/l/#loss-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible loss to an entity that will ultimately be resolved when one or more future events occur or fail to occur. The term loss is used for convenience to include many charges against income that are commonly referred to as expenses and others that are commonly referred to as losses.\"><span>loss contingency</span></a> exists, the likelihood that the future event or events will confirm the loss or impairment of an asset or the incurrence of a liability can range from <a href=\"/glossary/p/#probable\" class=\"term\" title=\"The future event or events are likely to occur.\"><span>probable</span></a> to <a href=\"/glossary/r/#remote\" class=\"term\" title=\"The chance of the future event or events occurring is slight.\"><span>remote</span></a>. </span></span> <span class=\"sfragment\" id=\"sfr_594FD3A5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">As indicated in the definition of <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingency</span></a>, the term <em class=\"ph i\">loss</em> is used for convenience to include many charges against income that are commonly referred to as expenses and others that are commonly referred to as losses. The Contingencies Topic uses the terms <em class=\"ph i\">probable</em>, <a href=\"/glossary/r/#reasonably-possible\" class=\"term\" title=\"The chance of the future event or events occurring is more than remote but less than likely.\"><span>reasonably possible</span></a>, and <em class=\"ph i\">remote</em> to identify three areas within that range. </span></span> </div> </div>","snippet":"When a loss contingency exists, the likelihood that the future event or events will confirm the loss or impairment of an asset or the incurrence of a liability can range from probable to remote. As indicated in the defin…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7bc8717da267e0c542e2e5fdff6bff22d393ae39aa229ede7a307d92141f3f5c","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}},{"citation":"450-20-25-2","para":"25-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_594FD4EC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An estimated loss from a loss contingency shall be accrued by a charge to income if both of the following conditions are met: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_594FD635-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Information available before the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>) indicates that it is probable that an asset had been impaired or a liability had been incurred at the date of the financial statements. </span></span> <span class=\"sfragment\" id=\"sfr_594FD7EF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Date of the financial statements means the end of the most recent accounting period for which financial statements are being presented. </span></span> <span class=\"sfragment\" id=\"sfr_594FD908-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> It is implicit in this condition that it must be probable that one or more future events will occur confirming the fact of the loss. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_594FDA60-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The amount of loss can be reasonably estimated. </span></span> </div> </li> </ol> <span class=\"sfragment\" id=\"sfr_594FDC18-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The purpose of those conditions is to require accrual of losses when they are reasonably estimable and relate to the current or a prior period. Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-55-1\" class=\"xref\">450-20-55-1 through 55-17</a></div> and Examples 1-2 (see paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-55-18\" class=\"xref\">450-20-55-18 through 55-35</a></div>) illustrate the application of the conditions. </span></span> <span class=\"sfragment\" id=\"sfr_594FDE2E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">As discussed in paragraph <a href=\"/asc/450/20/#450-20-50-5\" class=\"xref\">450-20-50-5</a>, disclosure is preferable to accrual when a reasonable estimate of loss cannot be made. </span></span> <span class=\"sfragment\" id=\"sfr_594FDFCB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Further, even losses that are reasonably estimable shall not be accrued if it is not probable that an asset has been impaired or a liability has been incurred at the date of an entity's financial statements because those losses relate to a future period rather than the current or a prior period. Attribution of a loss to events or activities of the current or prior periods is an element of asset impairment or liability incurrence. </span></span> </div> </div>","snippet":"An estimated loss from a loss contingency shall be accrued by a charge to income if both of the following conditions are met:\n(a) Information available before the financial statements are issued or are available to be is…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:09836dfbc6c00a3f9ab8891b5e23ca38bd39d13e79e7c9b6d325b8555339eb64","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:331e08d2cf4cf55d6720a459de9d234fd108c2bb822d09515993301e198301ad","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}},{"block":null,"heading":"Assessing Probability of Incurrence of a Loss","paragraphs":[{"citation":"450-20-25-3","para":"25-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_594FE179-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The conditions in the preceding paragraph are not intended to be so rigid that they require virtual certainty before a loss is accrued. </span></span> <span class=\"sfragment\" id=\"sfr_594FE312-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Instead, the condition in (a) in the preceding paragraph is intended to proscribe accrual of losses that relate to future periods. </span></span> </div> </div>","snippet":"The conditions in the preceding paragraph are not intended to be so rigid that they require virtual certainty before a loss is accrued. Instead, the condition in (a) in the preceding paragraph is intended to proscribe ac…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3d221cff8be31e00d745d2e44dad4c304abc4f949e790e9778a508d53f67b44c","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:017cc94f43edf4f8fc9a967faf53143e9da67a9ce521e6edaff6fb18e46d41d9","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}},{"block":null,"heading":"Assessing Whether a Loss Is Reasonably Estimable","paragraphs":[{"citation":"450-20-25-4","para":"25-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_594FE4A2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(b)</a> is intended to prevent accrual in the financial statements of amounts so uncertain as to impair the integrity of those statements. </span></span> </div> </div>","snippet":"The condition in paragraph 450-20-25-2(b) is intended to prevent accrual in the financial statements of amounts so uncertain as to impair the integrity of those statements.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ce3050a4b06a90e6a6e3081986f835e047259b05fee0def796ae48f804f673b6","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}},{"citation":"450-20-25-5","para":"25-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_594FE633-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">That requirement shall not delay accrual of a loss until only a single amount can be reasonably estimated. </span></span> <span class=\"sfragment\" id=\"sfr_594FE7E5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">To the contrary, when the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> is met and information available indicates that the estimated amount of loss is within a range of amounts, it follows that some amount of loss has occurred and can be reasonably estimated. </span></span> <span class=\"sfragment\" id=\"sfr_594FE98D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Thus, when the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> is met with respect to a particular loss contingency and the reasonable estimate of the loss is a range, the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(b)</a> is met and an amount shall be accrued for the loss. </span></span> </div> </div>","snippet":"That requirement shall not delay accrual of a loss until only a single amount can be reasonably estimated. To the contrary, when the condition in paragraph 450-20-25-2(a) is met and information available indicates that t…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:24e670cacf006bd826ff933a0d921cabe534f535ddf65168cfa2ba56600e61dc","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:358689193ed7674888897c64f583e6f8ef9aeda2fd01e7111e129aec346826e5","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}},{"block":null,"heading":"Events After the Date of the Financial Statements","paragraphs":[{"citation":"450-20-25-6","para":"25-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_594FEB37-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">After the date of an entity's financial statements but before those financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>), information may become available indicating that an asset was impaired or a liability was incurred after the date of the financial statements or that there is at least a reasonable possibility that an asset was impaired or a liability was incurred after that date. The information may relate to a loss contingency that existed at the date of the financial statements, for example, an asset that was not insured at the date of the financial statements. On the other hand, the information may relate to a loss contingency that did not exist at the date of the financial statements, for example, threat of expropriation of assets after the date of the financial statements or the filing for bankruptcy by an entity whose debt was guaranteed after the date of the financial statements. In none of the cases cited in this paragraph was an asset impaired or a liability incurred at the date of the financial statements, and the condition for accrual in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> is, therefore, not met. </span></span> </div> </div>","snippet":"After the date of an entity's financial statements but before those financial statements are issued or are available to be issued (as discussed in Section 855-10-25), information may become available indicating that an a…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:41fc7a191e7f42680e924989edd4e1f523abb52bb9e21354524673aad3e692c1","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}},{"citation":"450-20-25-7","para":"25-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_594FECCF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If a loss cannot be accrued in the period when it is probable that an asset had been impaired or a liability had been incurred because the amount of loss cannot be reasonably estimated, the loss shall be charged to the income of the period in which the loss can be reasonably estimated and shall not be charged retroactively to an earlier period. </span></span> <span class=\"sfragment\" id=\"sfr_594FEE57-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">All estimated losses for loss contingencies shall be charged to income rather than charging some to income and others to retained earnings as prior period adjustments. </span></span> </div> </div>","snippet":"If a loss cannot be accrued in the period when it is probable that an asset had been impaired or a liability had been incurred because the amount of loss cannot be reasonably estimated, the loss shall be charged to the i…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:29fad75b1a441977a0fe13a2a3ea4b9daf5a9b1e4632008bfde3ed5f6807b5b3","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c6ee45301dd5d2c87356be6f084057e82f8b3d1680b109fd33159d59de5feaeb","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}},{"block":null,"heading":"Business Risks","paragraphs":[{"citation":"450-20-25-8","para":"25-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_594FEFE9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">General or unspecified business risks do not meet the conditions for accrual in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a>, and no accrual for loss shall be made. </span></span> </div> </div>","snippet":"General or unspecified business risks do not meet the conditions for accrual in paragraph 450-20-25-2, and no accrual for loss shall be made.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2cf458cd182401ca3e7215c5b30f3324efc2c7d7780c14b8ed46664eca154c2e","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:27869db2dac6e9e72323d82905958235620d6c279c84b23c1c25776c091b866d","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e66df42e9fe4bc581a5bbb6f9f91c6dee58e65ba1c0ab2556e5f3c2b819dc09c","downloaded_from":"2026-09-10T00:27:12.550Z","last_downloaded_at":"2026-09-10T00:27:12.550Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482942","source_sha256":"67070c2196caf1f470785511bf4775048af36e5aa63c495f3006ed690a43e761"}},{"number":"30","label":"30 Initial Measurement","anchor":"30-initial-measurement","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-20-30-1","para":"30-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_59588382-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount shall be accrued. When no amount within the range is a better estimate than any other amount, however, the minimum amount in the range shall be accrued. </span></span> <span class=\"sfragment\" id=\"sfr_595884D8-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Even though the minimum amount in the range is not necessarily the amount of loss that will be ultimately determined, it is not likely that the ultimate loss will be less than the minimum amount. </span></span>Examples 1-2 (see paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-55-18\" class=\"xref\">450-20-55-18 through 55-35</a></div>) illustrate the application of these initial measurement standards.</div> </div>","snippet":"If some amount within a range of loss appears at the time to be a better estimate than any other amount within the range, that amount shall be accrued. When no amount within the range is a better estimate than any other …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c850b5d59cfbfc25ee33f1cbc4ada97284a04d24ef2d1c47e339ba36e7f2dba5","downloaded_from":"2026-09-10T00:27:15.994Z","last_downloaded_at":"2026-09-10T00:27:15.994Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483102","source_sha256":"39f71ed03273249b7115c39880121d32219e7368941901b86eedbeb358931759"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cda7fda620e51368ad4b1f12c84d482623ad022f7aa5cc7ff981f1328996ce6d","downloaded_from":"2026-09-10T00:27:15.994Z","last_downloaded_at":"2026-09-10T00:27:15.994Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483102","source_sha256":"39f71ed03273249b7115c39880121d32219e7368941901b86eedbeb358931759"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c2de6a724aaeada20f1da3a84d961462121ad4b6fa7d3a449f3910e258e9fd36","downloaded_from":"2026-09-10T00:27:15.994Z","last_downloaded_at":"2026-09-10T00:27:15.994Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483102","source_sha256":"39f71ed03273249b7115c39880121d32219e7368941901b86eedbeb358931759"}},{"number":"50","label":"50 Disclosure","anchor":"50-disclosure","is_sec":false,"groups":[{"block":null,"heading":"Accruals for Loss Contingencies","paragraphs":[{"citation":"450-20-50-1","para":"50-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975AA26-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure of the nature of an accrual made pursuant to the provisions of paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a>, and in some circumstances the amount accrued, may be necessary for the financial statements not to be misleading. </span></span><span class=\"sfragment\" id=\"sfr_5975ABF1-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Terminology used shall be descriptive of the nature of the accrual, such as estimated liability or liability of an estimated amount. The term <em class=\"ph i\">reserve</em> shall not be used for an accrual made pursuant to paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a>; that term is limited to an amount of unidentified or unsegregated assets held or retained for a specific purpose. </span></span>Examples 1 (see paragraph <a href=\"/asc/450/20/#450-20-55-18\" class=\"xref\">450-20-55-18</a>) and 2, Cases A, B, and D (see paragraphs <a href=\"/asc/450/20/#450-20-55-23\" class=\"xref\">450-20-55-23</a>, <a href=\"/asc/450/20/#450-20-55-27\" class=\"xref\">450-20-55-27</a>, and <a href=\"/asc/450/20/#450-20-55-32\" class=\"xref\">450-20-55-32</a>) illustrate the application of these disclosure standards.</div><div class=\"div pending-text\" id=\"d3e14319-108349__pending-text_ifs_xkm_zcc\"><div class=\"div date-effective\"><span class=\"transition-header\">Transition date:</span><span class=\"p-alphabet\">(P) December 16, 2026; (N) December 16, 2026</span><span class=\"transition-header pipe-separator\">Transition guidance:</span></div><a href=\"/asc/220/40/#220-40-65-1\" class=\"xref\">220-40-65-1</a><span class=\"sfragment\" id=\"GUID-A9399ACA-A893-4A80-8C1A-59F3A90EB93D\"><span class=\"sfragment-source\">Disclosure of the nature of an accrual made pursuant to the provisions of paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a>, and in some circumstances the amount accrued, may be necessary for the financial statements not to be misleading. </span></span><span class=\"sfragment\" id=\"GUID-7D4CD4A9-5836-4969-8C97-85CC736F1ED5\"><span class=\"sfragment-source\">Terminology used shall be descriptive of the nature of the accrual, such as estimated liability or liability of an estimated amount. The term <em class=\"ph i\">reserve</em> shall not be used for an accrual made pursuant to paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a>; that term is limited to an amount of unidentified or unsegregated assets held or retained for a specific purpose. </span></span>Examples 1 (see paragraph <a href=\"/asc/450/20/#450-20-55-18\" class=\"xref\">450-20-55-18</a>) and 2, Cases A, B, and D (see paragraphs <a href=\"/asc/450/20/#450-20-55-23\" class=\"xref\">450-20-55-23</a>, <a href=\"/asc/450/20/#450-20-55-27\" class=\"xref\">450-20-55-27</a>, and <a href=\"/asc/450/20/#450-20-55-32\" class=\"xref\">450-20-55-32</a>) illustrate the application of these disclosure standards. <span class=\"sfragment\" id=\"GUID-1B7E93EB-BE5B-4998-870A-BAA9420C65C4\"><span class=\"sfragment-source\">See paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/220/40/#220-40-50-21\" class=\"xref\">220-40-50-21 through 50-25</a></div> for additional disclosure requirements.</span></span></div></div>","snippet":"Disclosure of the nature of an accrual made pursuant to the provisions of paragraph 450-20-25-2, and in some circumstances the amount accrued, may be necessary for the financial statements not to be misleading. Terminolo…","pending":true,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d9d758c8a1a809c1f8cf73fc1f0f9507711e1987c8a8545d79b77b1950c15a8e","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"citation":"450-20-50-2","para":"50-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975AD57-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the criteria in paragraph <a href=\"/asc/275/10/#275-10-50-8\" class=\"xref\">275-10-50-8</a> are met, paragraph <a href=\"/asc/275/10/#275-10-50-9\" class=\"xref\">275-10-50-9</a> requires disclosure of an indication that it is at least <a href=\"/glossary/r/#reasonably-possible\" class=\"term\" title=\"The chance of the future event or events occurring is more than remote but less than likely.\"><span>reasonably possible</span></a> that a change in an entity's estimate of its <a href=\"/glossary/p/#probable\" class=\"term\" title=\"The future event or events are likely to occur.\"><span>probable</span></a> liability could occur in the near term. </span></span>Example 3 (see paragraph <a href=\"/asc/450/20/#450-20-55-36\" class=\"xref\">450-20-55-36</a>) illustrates this disclosure for an entity involved in litigation.</div></div>","snippet":"If the criteria in paragraph 275-10-50-8 are met, paragraph 275-10-50-9 requires disclosure of an indication that it is at least reasonably possible that a change in an entity's estimate of its probable liability could o…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b0d578bed0fcf0ec9e50c4ab1e88360be7499afd55edd0613bdecb4ad1d0fcfb","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:97c1e21c07a2b9ee9c3c86c0a9838db9bd92bf375d42905704a9a898212461cc","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"block":null,"heading":"Unrecognized Contingencies","paragraphs":[{"citation":"450-20-50-2A","para":"50-2A","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975B03B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The disclosures required by paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-3\" class=\"xref\">450-20-50-3 through 50-6</a></div> do not apply to credit losses on instruments within the scope of Topic <a altsource=\"GUID-625589DC-9B5F-442F-8EE2-DE0905FB7CE6.ditamap\" class=\"ditamap\">326</a> on measurement of credit losses. (See paragraph <a href=\"/asc/310/10/#310-10-50-21\" class=\"xref\">310-10-50-21</a>.)</span></span></div></div>","snippet":"The disclosures required by paragraphs 450-20-50-3 through 50-6 do not apply to credit losses on instruments within the scope of Topic 326 on measurement of credit losses. (See paragraph 310-10-50-21.)","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8d0ecf373bd44cb30ef8cd0595b6d7048e253d5863eb4ebfbc70cfac7e9c90f4","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"citation":"450-20-50-3","para":"50-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975B194-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure of the <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingency</span></a> shall be made if </span></span><span class=\"sfragment\" id=\"sfr_5975B2CA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">there is at least a reasonable possibility that a loss or an additional loss may have been incurred and either of the following conditions exists: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5975B401-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An accrual is not made for a <a href=\"/glossary/l/#loss-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible loss to an entity that will ultimately be resolved when one or more future events occur or fail to occur. The term loss is used for convenience to include many charges against income that are commonly referred to as expenses and others that are commonly referred to as losses.\"><span>loss contingency</span></a> because any of the conditions in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a> are not met. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5975B4FC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An exposure to loss exists in excess of the amount accrued pursuant to the provisions of paragraph <a href=\"/asc/450/20/#450-20-30-1\" class=\"xref\">450-20-30-1</a>. </span></span></div></li></ol>Examples 1-3 (see paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-55-18\" class=\"xref\">450-20-55-18 through 55-37</a></div>) illustrate the application of these disclosure standards.</div></div>","snippet":"Disclosure of the contingency shall be made if there is at least a reasonable possibility that a loss or an additional loss may have been incurred and either of the following conditions exists:\n(a) An accrual is not made…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:381f08fd1cec8fb2aa625aebcf56e2e627ca533ba438899b1bba48b92a895b29","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"citation":"450-20-50-4","para":"50-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975B607-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The disclosure in the preceding paragraph shall include both of the following: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5975B6F2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The nature of the contingency </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5975B7DA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An estimate of the possible loss or range of loss or a statement that such an estimate cannot be made. </span></span></div></li></ol></div></div>","snippet":"The disclosure in the preceding paragraph shall include both of the following:\n(a) The nature of the contingency\n(b) An estimate of the possible loss or range of loss or a statement that such an estimate cannot be made.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:549530268618b316bd49af914aec0d25df987c4ad6a04dcb426f5981cecf6144","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"citation":"450-20-50-5","para":"50-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975B8C0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure is preferable to accrual when a reasonable estimate of loss cannot be made. </span></span><span class=\"sfragment\" id=\"sfr_5975B99F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For example, disclosure shall be made of any loss contingency that meets the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> but that is not accrued because the amount of loss cannot be reasonably estimated (the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(b)</a>). Disclosure also shall be made of some loss contingencies that do not meet the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a>—namely, those contingencies for which there is a reasonable possibility that a loss may have been incurred even though information may not indicate that it is probable that an asset had been impaired or a liability had been incurred at the date of the financial statements. </span></span></div></div>","snippet":"Disclosure is preferable to accrual when a reasonable estimate of loss cannot be made. For example, disclosure shall be made of any loss contingency that meets the condition in paragraph 450-20-25-2(a) but that is not ac…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2b2a44e7d8c2146d227854c31ffc7dbd1782902115b496b6f9e14310e07d9a6b","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"citation":"450-20-50-6","para":"50-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975BA8A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure is not required of a loss contingency involving an unasserted claim or assessment if there has been no manifestation by a potential claimant of an awareness of a possible claim or assessment unless both of the following conditions are met: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5975BB66-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">It is considered probable that a claim will be asserted. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5975BC42-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">There is a reasonable possibility that the outcome will be unfavorable. </span></span></div></li></ol></div></div>","snippet":"Disclosure is not required of a loss contingency involving an unasserted claim or assessment if there has been no manifestation by a potential claimant of an awareness of a possible claim or assessment unless both of the…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:db4f4c7b14a4349434636f02150fcfae721e8991baa64ca42965f5b51ae0d236","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"citation":"450-20-50-7","para":"50-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975BD59-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure of noninsured or underinsured risks is not required by this Subtopic. </span></span><span class=\"sfragment\" id=\"sfr_5975BE45-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">However, disclosure in appropriate circumstances is not discouraged. </span></span></div></div>","snippet":"Disclosure of noninsured or underinsured risks is not required by this Subtopic. However, disclosure in appropriate circumstances is not discouraged.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1ad18ba0f98aec8bea694015320ba223c126d4c7682f9821087d287c46ae6b55","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"citation":"450-20-50-8","para":"50-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975BF20-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">No disclosure about general or unspecified business risks is required by this Subtopic, however, Topic <a altsource=\"GUID-294C94E6-5C72-461B-80D4-DB6361097428.ditamap\" class=\"ditamap\">275</a> requires disclosure of certain business risks. </span></span></div></div>","snippet":"No disclosure about general or unspecified business risks is required by this Subtopic, however, Topic 275 requires disclosure of certain business risks.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7a6f45ddff207033d81536e8704501f986af3806a4f440db9ea92a84cf788a84","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ed5534f2211b653fa79c2173ba92d216e937476c2ae441632940d6fa9f9779cb","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"block":null,"heading":"Losses Arising After the Date of the Financial Statements","paragraphs":[{"citation":"450-20-50-9","para":"50-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975BFFC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure of a loss, or a loss contingency, arising after the date of an entity's financial statements but before those financial statements are issued, as described in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-25-6\" class=\"xref\">450-20-25-6 through 25-7</a></div>, may be necessary to keep the financial statements from being misleading if an accrual is not required. </span></span><span class=\"sfragment\" id=\"sfr_5975C0CC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If disclosure is deemed necessary, the financial statements shall include both of the following: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5975C1AD-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The nature of the loss or loss contingency </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5975C27A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An estimate of the amount or range of loss or possible loss or a statement that such an estimate cannot be made. </span></span></div></li></ol></div></div>","snippet":"Disclosure of a loss, or a loss contingency, arising after the date of an entity's financial statements but before those financial statements are issued, as described in paragraphs 450-20-25-6 through 25-7, may be necess…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:57044a6186618d58f6bf02fdc61edd15a5e65df96c88dfdfb7275c1a72263058","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"citation":"450-20-50-10","para":"50-10","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5975C340-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Occasionally, in the case of a loss arising after the date of the financial statements if the amount of asset impairment or liability incurrence can be reasonably estimated, disclosure may best be made by supplementing the historical financial statements with pro forma financial data giving effect to the loss as if it had occurred at the date of the financial statements. It may be desirable to present pro forma statements, usually a balance sheet only, in columnar form on the face of the historical financial statements. </span></span></div></div>","snippet":"Occasionally, in the case of a loss arising after the date of the financial statements if the amount of asset impairment or liability incurrence can be reasonably estimated, disclosure may best be made by supplementing t…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:84888c57f346f0922c4a889eed14d97aa4b78e8dce7c0942414854f903ea3510","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4b4107826bec0500d84b33bf1e9de93c565cf279a26bf6562768e85ae769c8bc","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:909e7fa79607f70eb9147f87673d8ad17c4d6fb99ae50e70f106f89b007cde99","downloaded_from":"2026-09-10T00:27:19.230Z","last_downloaded_at":"2026-09-10T00:27:19.230Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483076","source_sha256":"431261e97f6a623910c718693c14eca942df55fc02d212be5c0d0fa01551f638"}},{"number":"55","label":"55 Implementation Guidance and Illustrations","anchor":"55-implementation-guidance-and-illustrations","is_sec":false,"groups":[{"block":null,"heading":"Implementation Guidance","paragraphs":[{"citation":"450-20-55-1","para":"55-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Section includes implementation guidance for the application of the conditions for accrual of <a href=\"/glossary/l/#loss-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible loss to an entity that will ultimately be resolved when one or more future events occur or fail to occur. The term loss is used for convenience to include many charges against income that are commonly referred to as expenses and others that are commonly referred to as losses.\"><span>loss contingencies</span></a> and for the disclosure requirements of this Subtopic. This guidance does not address all possible applications of the requirements of this Subtopic. Therefore, accrual and disclosure of loss contingencies should be based on an evaluation of the facts and circumstances in each particular situation.</div> </div>","snippet":"This Section includes implementation guidance for the application of the conditions for accrual of loss contingencies and for the disclosure requirements of this Subtopic. This guidance does not address all possible appl…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:960ca80f66a2641b3c2a719d8d298344811a70a1185713b173a4271e8a8a8393","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-2","para":"55-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598AFEE8-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If it is <a href=\"/glossary/p/#probable\" class=\"term\" title=\"The future event or events are likely to occur.\"><span>probable</span></a> that a claim </span></span> <span class=\"sfragment\" id=\"sfr_598B009B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> resulting from injury or damage caused by a product defect </span></span> <span class=\"sfragment\" id=\"sfr_598B0247-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">will arise with respect to products or services that have been sold, accrual for losses may be appropriate. </span></span> <span class=\"sfragment\" id=\"sfr_598B035F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> would be met, for instance, with respect to a drug product or toys that have been sold if a health or safety hazard related to those products is discovered and as a result it is considered probable that liabilities have been incurred. </span></span> <span class=\"sfragment\" id=\"sfr_598B0477-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(b)</a> would be met if experience or other information enables the entity to make a reasonable estimate of the loss with respect to the drug product or the toys. </span></span> </div> </div>","snippet":"If it is probable that a claim resulting from injury or damage caused by a product defect will arise with respect to products or services that have been sold, accrual for losses may be appropriate. The condition in parag…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:84e130972eac0be52a6c1d85f8b68316532d71f3862b8548d86ee1f6a2534402","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-3","para":"55-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B057E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">At the date of an entity's financial statements, it may not be insured against risk of future loss or damage to its property by fire, explosion, or other hazards. </span></span> <span class=\"sfragment\" id=\"sfr_598B0687-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Some risks, for all practical purposes, may be noninsurable, and the self-assumption of those risks is mandatory. </span></span> </div> </div>","snippet":"At the date of an entity's financial statements, it may not be insured against risk of future loss or damage to its property by fire, explosion, or other hazards. Some risks, for all practical purposes, may be noninsurab…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:97897c37ae5d98abf24c44fb19e43fba9ebaf7121c72cd6ac8136504684f9597","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-4","para":"55-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B078B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The absence of insurance against losses from risks of those types constitutes an existing condition involving uncertainty about the amount and timing of any losses that may occur, in which case a <a href=\"/glossary/l/#loss-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible loss to an entity that will ultimately be resolved when one or more future events occur or fail to occur. The term loss is used for convenience to include many charges against income that are commonly referred to as expenses and others that are commonly referred to as losses.\"><span>loss contingency</span></a> exists. Uninsured risks may arise in a number of ways, including the following: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B0896-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Noninsurance of certain risks </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B0992-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Co-insurance or deductible clauses in an insurance contract </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B0A8E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Insurance through a subsidiary or investee to the extent not reinsured with an independent insurer. </span></span> <span class=\"sfragment\" id=\"sfr_598B0B8F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">(The effects of transactions between a parent or other investor and a subsidiary or investee insurance entity should be eliminated from an entity's financial statements in accordance with paragraphs <a href=\"/asc/810/10/#810-10-45-1\" class=\"xref\">810-10-45-1</a> and <a href=\"/asc/323/10/#323-10-35-7\" class=\"xref\">323-10-35-7</a>.) </span></span> </div> </li> </ol> </div> </div>","snippet":"The absence of insurance against losses from risks of those types constitutes an existing condition involving uncertainty about the amount and timing of any losses that may occur, in which case a loss contingency exists.…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:31007af635a6f0aad707dc3137eb60910a9f6645c9d6cd893492c6a08cf4376b","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-5","para":"55-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B0C92-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The absence of insurance does not mean that an asset has been impaired or a liability has been incurred at the date of an entity's financial statements. </span></span> <span class=\"sfragment\" id=\"sfr_598B0D92-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Fires, explosions, and other similar events that may cause loss or damage of an entity's property are random in their occurrence. </span></span> <span class=\"sfragment\" id=\"sfr_598B0EC4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">With respect to events of that type, the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> is not satisfied prior to the occurrence of the event because until that time there is no diminution in the value of the property. There is no relationship of those events to the activities of the entity prior to their occurrence, and no asset is impaired prior to their occurrence. Further, unlike an insurance entity, which has a contractual obligation under policies in force to reimburse insureds for losses, an entity can have no such obligation to itself and, hence, no liability. </span></span> </div> </div>","snippet":"The absence of insurance does not mean that an asset has been impaired or a liability has been incurred at the date of an entity's financial statements. Fires, explosions, and other similar events that may cause loss or …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:250801cc733233aadf7a8fa1c0ce0b712be672dbc462781db78fbe5c0c703d7b","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-6","para":"55-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B0FC8-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity may choose not to purchase insurance against risk of loss that may result from injury to others, damage to the property of others, or interruption of its business operations. </span></span> <span class=\"sfragment\" id=\"sfr_598B10C2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Exposure to risks of those types constitutes an existing condition involving uncertainty about the amount and timing of any losses that may occur, in which case a <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingency</span></a> exists. </span></span> </div> </div>","snippet":"An entity may choose not to purchase insurance against risk of loss that may result from injury to others, damage to the property of others, or interruption of its business operations. Exposure to risks of those types co…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:536579edd91fcfefb6b3aef2b17abd70b0cbd86843b59996ea6035a7a080f26e","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-7","para":"55-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B11B5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Mere exposure to risks of those types, however, does not mean that an asset has been impaired or a liability has been incurred. </span></span> <span class=\"sfragment\" id=\"sfr_598B12AA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> is not met with respect to loss that may result from injury to others, damage to the property of others, or business interruption that may occur after the date of an entity's financial statements. Losses of those types do not relate to the current or a prior period but rather to the future period in which they occur. Thus, for example, an entity with a fleet of vehicles should not accrue for injury to others or damage to the property of others that might be caused by those vehicles in the future even if the amount of those losses may be reasonably estimable. </span></span> </div> </div>","snippet":"Mere exposure to risks of those types, however, does not mean that an asset has been impaired or a liability has been incurred. The condition in paragraph 450-20-25-2(a) is not met with respect to loss that may result fr…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a2563a891a77370151d0ceca24d6f315f55cb3bf438255107eb102bdb574c65c","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-8","para":"55-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B13A2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">On the other hand, the conditions in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a> would be met with respect to uninsured losses resulting from injury to others or damage to the property of others if both of the following are true: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B14A8-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The event took place prior to the date of the financial statements, even though the entity may not become aware of those matters until after that date. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B159F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The experience of the entity or other information enables it to make a reasonable estimate of the loss that was incurred prior to the date of its financial statements. </span></span> </div> </li> </ol> <span class=\"sfragment\" id=\"sfr_598B168F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Injury or damage resulting from products that have been sold are discussed in paragraph <a href=\"/asc/450/20/#450-20-55-2\" class=\"xref\">450-20-55-2</a>. </span></span> </div> </div>","snippet":"On the other hand, the conditions in paragraph 450-20-25-2 would be met with respect to uninsured losses resulting from injury to others or damage to the property of others if both of the following are true:\n(a) The even…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2e05347e573e2afd72bea2fb1de6a0da8d1a5084a939d2cf6ff0448b13a19136","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-9","para":"55-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B178A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The threat of expropriation of assets is a contingency (as defined) because of the uncertainty about its outcome and effect. </span></span> <span class=\"sfragment\" id=\"sfr_598B187A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> is met </span></span> <span class=\"sfragment\" id=\"sfr_598B196D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> if both of the following are true: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B1A5D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Expropriation is imminent. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B1B4E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Compensation will be less than the carrying amount of the assets. </span></span> </div> </li> </ol> <span class=\"sfragment\" id=\"sfr_598B1C6B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Imminence may be indicated, for example, by public or private declarations of intent by a government to expropriate assets of the entity or actual expropriation of assets of other entities. </span></span> <span class=\"sfragment\" id=\"sfr_598B1D62-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(b)</a> requires that accrual be made only if the amount of loss can be reasonably estimated. </span></span> <span class=\"sfragment\" id=\"sfr_598B1E61-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the conditions for accrual are not met, the disclosures described in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-3\" class=\"xref\">450-20-50-3 through 50-8</a></div> would be made if there is at least a reasonable possibility that an asset has been impaired. </span></span> </div> </div>","snippet":"The threat of expropriation of assets is a contingency (as defined) because of the uncertainty about its outcome and effect. The condition in paragraph 450-20-25-2(a) is met if both of the following are true:\n(a) Expropr…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:20e3a856ca676de849a83046cf79ab1f5faa429939d10cbb24f5de03d8fb3b0b","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-10","para":"55-10","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B1F86-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The following factors should be considered in determining whether accrual and/or disclosure is required with respect to pending or threatened litigation and actual or possible claims and assessments: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B208F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The period in which the underlying cause (that is, the cause for action) of the pending or threatened litigation or of the actual or possible claim or assessment occurred </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B219D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The degree of probability of an unfavorable outcome </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B2289-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The ability to make a reasonable estimate of the amount of loss. </span></span> </div> </li> </ol>Examples 1 through 2 (see paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-55-18\" class=\"xref\">450-20-55-18 through 55-35</a></div>) illustrate the consideration of these factors in determining whether to accrue or disclose litigation.</div> </div>","snippet":"The following factors should be considered in determining whether accrual and/or disclosure is required with respect to pending or threatened litigation and actual or possible claims and assessments:\n(a) The period in wh…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e4caf5ae9c54254b50daa1ea866ded5d6c1bf811b625dc7afc442c9dc43770ac","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-11","para":"55-11","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B239E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Accrual may be appropriate for litigation, claims, or assessments whose underlying cause is an event occurring on or before the date of an entity's financial statements even if the entity does not become aware of the existence or possibility of the lawsuit, claim, or assessment until after the date of the financial statements. </span></span> <span class=\"sfragment\" id=\"sfr_598B248E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If those financial statements have not been issued or are not yet available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>), accrual of a loss related to the litigation, claim, or assessment would be required if the probability of loss is such that the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> is met and the amount of loss can be reasonably estimated. </span></span> </div> </div>","snippet":"Accrual may be appropriate for litigation, claims, or assessments whose underlying cause is an event occurring on or before the date of an entity's financial statements even if the entity does not become aware of the exi…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b5cc8286921e69e6debcccb9a26269b3b6817a8bc7e5171b8ec1adf6272ff74d","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-12","para":"55-12","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B2599-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the underlying cause of the litigation, claim, or assessment is an event occurring before the date of an entity's financial statements, the probability of an outcome unfavorable to the entity must be assessed to determine whether the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> is met. Among the factors that should be considered are the following: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B268C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The nature of the litigation, claim, or assessment </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B277A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The progress of the case (including progress after the date of the financial statements but before those statements are issued or are available to be issued [as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>]) </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B2C0B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The opinions or views of legal counsel and other advisers, </span></span> <span class=\"sfragment\" id=\"sfr_598B2E10-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">although, the fact that legal counsel is unable to express an opinion that the outcome will be favorable to the entity should not necessarily be interpreted to mean that the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> is met </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">d</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B2F31-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The experience of the entity in similar cases </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">e</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B3039-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The experience of other entities </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">f</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B31C2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Any decision of the entity's management as to how the entity intends to respond to the lawsuit, claim, or assessment (for example, a decision to contest the case vigorously or a decision to seek an out-of-court settlement). </span></span> </div> </li> </ol> </div> </div>","snippet":"If the underlying cause of the litigation, claim, or assessment is an event occurring before the date of an entity's financial statements, the probability of an outcome unfavorable to the entity must be assessed to deter…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:79b5b91cf8b663419425d6cbbfb13ccf68a8f2875dad38c423144bc918b3559f","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-13","para":"55-13","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B32F4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The filing of a suit or formal assertion of a claim or assessment does not automatically indicate that accrual of a loss may be appropriate. The degree of probability of an unfavorable outcome must be assessed. The condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> would be met if an unfavorable outcome is determined to be probable. </span></span> <span class=\"sfragment\" id=\"sfr_598B345A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Accrual would be inappropriate, but disclosure would be required, </span></span> <span class=\"sfragment\" id=\"sfr_598B35AF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">if an unfavorable outcome is determined to be <a href=\"/glossary/r/#reasonably-possible\" class=\"term\" title=\"The chance of the future event or events occurring is more than remote but less than likely.\"><span>reasonably possible</span></a> but not probable, or </span></span> <span class=\"sfragment\" id=\"sfr_598B36F8-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">if the amount of loss cannot be reasonably estimated. </span></span> </div> </div>","snippet":"The filing of a suit or formal assertion of a claim or assessment does not automatically indicate that accrual of a loss may be appropriate. The degree of probability of an unfavorable outcome must be assessed. The condi…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e5ca161e22fa824e2fd49e8be2ae9a8b7e167bf2ff71167b9eb6ab27976c571a","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-14","para":"55-14","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B3852-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">With respect to unasserted claims and assessments, an entity must determine the degree of probability that a suit may be filed or a claim or assessment may be asserted and the possibility of an unfavorable outcome. </span></span> <span class=\"sfragment\" id=\"sfr_598B3948-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If an unfavorable outcome is probable and the amount of loss can be reasonably estimated, accrual of a loss is required by paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a>. </span></span> <span class=\"sfragment\" id=\"sfr_598B3A2D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> For example: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B3B5C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A catastrophe, accident, or other similar physical occurrence predictably engenders claims for redress, and in such circumstances their assertion may be probable. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B3CBC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An investigation of an entity by a governmental agency, if enforcement proceedings have been or are likely to be instituted, is often followed by private claims for redress, and the probability of their assertion and the possibility of loss should be considered in each case. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B3E30-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity may believe there is a possibility that it has infringed on another entity's patent rights, but the entity owning the patent rights has not indicated an intention to take any action and has not even indicated an awareness of the possible infringement. In that case, a judgment must first be made as to whether the assertion of a claim is probable. </span></span> </div> </li> </ol> </div> </div>","snippet":"With respect to unasserted claims and assessments, an entity must determine the degree of probability that a suit may be filed or a claim or assessment may be asserted and the possibility of an unfavorable outcome. If an…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:edb08ba6bb6256655c8aafa62701d9a98a3c69e32f55e6fccfc312921d4168f4","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-15","para":"55-15","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B3F2E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the judgment is that assertion is not probable, no accrual or disclosure would be required. </span></span> <span class=\"sfragment\" id=\"sfr_598B401C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">On the other hand, if the judgment is that assertion is probable, then a second judgment must be made as to the degree of probability of an unfavorable outcome. The disclosures described in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-3\" class=\"xref\">450-20-50-3 through 50-8</a></div> would be required in either of the following circumstances: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B410E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An unfavorable outcome is probable but the amount of loss cannot be reasonably estimated. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_598B41F4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An unfavorable outcome is reasonably possible but not probable. </span></span> </div> </li> </ol> </div> </div>","snippet":"If the judgment is that assertion is not probable, no accrual or disclosure would be required. On the other hand, if the judgment is that assertion is probable, then a second judgment must be made as to the degree of pro…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ca36103a31a2c9eeae0921507830851c1e546e4e4dd74ad0745884d764e990b6","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-16","para":"55-16","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B435D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">As a condition for accrual of a loss contingency, the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(b)</a> requires that the amount of loss can be reasonably estimated. In some cases, it may be determined that a loss was incurred because an unfavorable outcome of the litigation, claim, or assessment is probable (thus satisfying the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2[a]</a>), but the range of possible loss is wide. Examples 1 and 3 (see paragraphs <a href=\"/asc/450/20/#450-20-55-18\" class=\"xref\">450-20-55-18</a> and <a href=\"/asc/450/20/#450-20-55-36\" class=\"xref\">450-20-55-36</a>) illustrate the application of the standards in this Subtopic when the range of possible loss is wide. </span></span> </div> </div>","snippet":"As a condition for accrual of a loss contingency, the condition in paragraph 450-20-25-2(b) requires that the amount of loss can be reasonably estimated. In some cases, it may be determined that a loss was incurred becau…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ed53e3134f424f3e8d9ed48866a592730eeef00e140881ec4416e504fa36152a","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-17","para":"55-17","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B44B9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">As a condition for accrual of a loss contingency, the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> requires that information available before the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>) indicate that it is probable that an asset had been impaired or a liability had been incurred at the date of the financial statements. </span></span> <span class=\"sfragment\" id=\"sfr_598B45F5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Accordingly, accrual would clearly be inappropriate for litigation, claims, or assessments whose underlying cause is an event or condition occurring after the date of financial statements but before those financial statements are issued or are available to be issued. </span></span> <span class=\"sfragment\" id=\"sfr_598B46F9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For example, an entity would not accrue a suit for damages alleged to have been suffered as a result of an accident that occurred after the date of the financial statements. However, disclosure may be required by paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-9\" class=\"xref\">450-20-50-9 through 50-10</a></div>. </span></span> </div> </div>","snippet":"As a condition for accrual of a loss contingency, the condition in paragraph 450-20-25-2(a) requires that information available before the financial statements are issued or are available to be issued (as discussed in Se…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:739ab517e13db0198d307323eb08e661d7363dfbb0d5f32bbb2afc5033a48f7e","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-17A","para":"55-17A","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B481B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This Subtopic does not prohibit (and, in fact, requires) accrual of a net loss (that is, a loss in excess of deferred premiums) that probably will be incurred on insurance policies that are in force, provided that the loss can be reasonably estimated.</span></span> </div> </div>","snippet":"This Subtopic does not prohibit (and, in fact, requires) accrual of a net loss (that is, a loss in excess of deferred premiums) that probably will be incurred on insurance policies that are in force, provided that the lo…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:617b710a571d140f5edcaf177b819a87dd496d2cf67fe5a8cc5cb36f145ec5a1","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:389bac3fb964edc94d8c46ab167cfdcb25f2654fb7ef4a41545b3511f5ff7fd4","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"block":null,"heading":"Illustrations","paragraphs":[{"citation":"450-20-55-18","para":"55-18","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B495B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity may be litigating a dispute with another party. In preparation for the trial, it may determine that, based on recent developments involving one aspect of the litigation, it is probable that it will have to pay $2 million to settle the litigation. Another aspect of the litigation may, however, be open to considerable interpretation, and depending on the interpretation by the court the entity may have to pay an additional $8 million over and above the $2 million. </span></span> </div> </div>","snippet":"An entity may be litigating a dispute with another party. In preparation for the trial, it may determine that, based on recent developments involving one aspect of the litigation, it is probable that it will have to pay …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3c8174e9cc4121f69136ce7e7c078edab70e44780181d8a4a3c8ae6975f29877","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-19","para":"55-19","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B4A94-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In that case, paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a> requires accrual of the $2 million if that is considered a reasonable estimate of the loss. </span></span> </div> </div>","snippet":"In that case, paragraph 450-20-25-2 requires accrual of the $2 million if that is considered a reasonable estimate of the loss.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:451dc868260036ef0c9a6fb252e29368d90284020ee9e7570b9b1b59980ea603","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-20","para":"55-20","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B4BA2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-1\" class=\"xref\">450-20-50-1 through 50-2</a></div> require disclosure of the nature of the accrual, and depending on the circumstances, may require disclosure of the $2 million that was accrued. </span></span> </div> </div>","snippet":"Paragraphs 450-20-50-1 through 50-2 require disclosure of the nature of the accrual, and depending on the circumstances, may require disclosure of the $2 million that was accrued.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:755b33e3b6168aaca97d0475dc05851a1f10d57a9e93e1f8d5b1ce061ea99705","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-21","para":"55-21","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B4CAE-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-3\" class=\"xref\">450-20-50-3 through 50-8</a></div> require disclosure of the additional exposure to loss if there is a reasonable possibility that the additional amounts will be paid. </span></span> </div> </div>","snippet":"Paragraphs 450-20-50-3 through 50-8 require disclosure of the additional exposure to loss if there is a reasonable possibility that the additional amounts will be paid.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:939eb533b8dbddaa1cfe8e2d3b54959fdde585c548a9315b589cfa51ee9f4c10","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-22","para":"55-22","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following Cases illustrate application of the accrual and disclosure requirements in the following stages of litigation:<ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\">The trial is complete but the damages are undetermined (Case A).</div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\">The trial is incomplete but an unfavorable outcome is probable (Case B).</div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\">The trial is incomplete and unfavorable outcome is reasonably possible (Case C).</div></li><li class=\"li-norm\"><span class=\"linum\">d</span><div class=\"p\">There is a range of loss and one amount is a better estimate than any other (Case D).</div></li></ol></div> </div>","snippet":"The following Cases illustrate application of the accrual and disclosure requirements in the following stages of litigation:\n(a) The trial is complete but the damages are undetermined (Case A).\n(b) The trial is incomplet…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:49fb8397772cd881b1b8ecc0c675f90c0ecbd34fa3cfbfcc5699b276f6301cec","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-23","para":"55-23","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B4DF6-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entity is involved in litigation at the close of its fiscal year and information available indicates that an unfavorable outcome is probable. Subsequently, after a trial on the issues, a verdict unfavorable to the entity is handed down, but the amount of damages remains unresolved at the time the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>). Although the entity is unable to estimate the exact amount of loss, its reasonable estimate at the time is that the judgment will be for not less than $3 million or more than $9 million. No amount in that range appears at the time to be a better estimate than any other amount. </span></span> </div> </div>","snippet":"An entity is involved in litigation at the close of its fiscal year and information available indicates that an unfavorable outcome is probable. Subsequently, after a trial on the issues, a verdict unfavorable to the ent…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8a3f9c26b4c065fd41821f3081e4b8daf51f0400f398c1365e0048a6cdb8834a","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-24","para":"55-24","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B4F04-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In this Case, paragraph <a href=\"/asc/450/20/#450-20-30-1\" class=\"xref\">450-20-30-1</a> requires accrual of the $3 million (the minimum of the range) at the close of the fiscal year. </span></span> </div> </div>","snippet":"In this Case, paragraph 450-20-30-1 requires accrual of the $3 million (the minimum of the range) at the close of the fiscal year.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:88fc893fbe9cdd56f6e76d6ea02744ea0ab0c02e2227621a989c9a3d858cb39f","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-25","para":"55-25","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B5038-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-1\" class=\"xref\">450-20-50-1 through 50-2</a></div> require disclosure of the nature of the contingency </span></span> <span class=\"sfragment\" id=\"sfr_598B5148-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">and, depending on the circumstances, may require disclosure of the amount of the accrual. </span></span> </div> </div>","snippet":"Paragraphs 450-20-50-1 through 50-2 require disclosure of the nature of the contingency and, depending on the circumstances, may require disclosure of the amount of the accrual.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:615016591427505efd28c3d704d90ae3a8fa97bf328d237a711c30aecad457bc","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-26","para":"55-26","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B523B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-3\" class=\"xref\">450-20-50-3 through 50-8</a></div> require disclosure of the exposure to an additional amount of loss of up to $6 million. </span></span> </div> </div>","snippet":"Paragraphs 450-20-50-3 through 50-8 require disclosure of the exposure to an additional amount of loss of up to $6 million.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:baea3f47da1dd5804297e0272e15f2ef594305394990903beb8518b2f7c8070a","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-27","para":"55-27","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B532B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Assume the same facts as in Case A, except it is probable that a verdict will be unfavorable and the trial has not been completed before the financial statements are issued or are available to be issued (as discussed in Section <a altsource=\"GUID-44A13ED8-C2BD-4E8D-BBAA-5FE50B1FFE63.ditamap\" class=\"ditamap\">855-10-25</a>). In that situation, the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> would be met because information available to the entity indicates that an unfavorable verdict is probable. An assessment that the range of loss is between $3 million and $9 million would meet the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(b)</a>. </span></span> </div> </div>","snippet":"Assume the same facts as in Case A, except it is probable that a verdict will be unfavorable and the trial has not been completed before the financial statements are issued or are available to be issued (as discussed in …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f506dd25715d97988138d4e5bec17b6701f3d9d468b21cb42ed19991d9500aad","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-28","para":"55-28","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B5423-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In this Case, if no single amount in that range is a better estimate than any other amount, paragraph <a href=\"/asc/450/20/#450-20-30-1\" class=\"xref\">450-20-30-1</a> requires </span></span> <span class=\"sfragment\" id=\"sfr_598B551A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">accrual of $3 million (the minimum of the range) at the close of the fiscal year. </span></span> </div> </div>","snippet":"In this Case, if no single amount in that range is a better estimate than any other amount, paragraph 450-20-30-1 requires accrual of $3 million (the minimum of the range) at the close of the fiscal year.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:547739ca92b5062141c7c16ae6cf8283661ba1968232debe497dfd9012cfe15a","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-29","para":"55-29","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B5604-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-1\" class=\"xref\">450-20-50-1 through 50-2</a></div> require disclosure of the nature of the contingency and,</span></span> <span class=\"sfragment\" id=\"sfr_598B5724-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> depending on the circumstances, may require disclosure of the amount of the accrual. </span></span> </div> </div>","snippet":"Paragraphs 450-20-50-1 through 50-2 require disclosure of the nature of the contingency and, depending on the circumstances, may require disclosure of the amount of the accrual.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dbe27e92f3883bb188f0c80fbbf94aed175ea0db2dbb2dd1a3de5f5d20c1893c","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-30","para":"55-30","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B5876-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> <a href=\"/asc/450/20/#450-20-50-3\" class=\"xref\">Paragraphs 450-20-50-3 through 50-8</a> require disclosure of the exposure to an additional amount of loss of up to $6 million. </span></span> </div> </div>","snippet":"Paragraphs 450-20-50-3 through 50-8 require disclosure of the exposure to an additional amount of loss of up to $6 million.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:883d6297b16cb5dc3252eabc83d40ada0968a13ea3f463d1a4dab4cd8e07fc41","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-31","para":"55-31","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B5993-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Assume the same facts as in Case B, except the entity had assessed the verdict differently (for example, that an unfavorable verdict was not probable but was only reasonably possible). The condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> would not have been met and no amount of loss would be accrued. Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-3\" class=\"xref\">450-20-50-3 through 50-8</a></div> require disclosure of the nature of the contingency and any amount of loss that is reasonably possible. </span></span> </div> </div>","snippet":"Assume the same facts as in Case B, except the entity had assessed the verdict differently (for example, that an unfavorable verdict was not probable but was only reasonably possible). The condition in paragraph 450-20-2…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0478f5786806d61baa1c5006ee016c6f6f6e6f68f6aa061d8a5dbd00529e85c7","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-32","para":"55-32","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B5ABF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Assume that in Case A and Case B the condition in paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2(a)</a> has been met and a reasonable estimate of loss is a range between $3 million and $9 million but a loss of $4 million is a better estimate than any other amount in that range. </span></span> </div> </div>","snippet":"Assume that in Case A and Case B the condition in paragraph 450-20-25-2(a) has been met and a reasonable estimate of loss is a range between $3 million and $9 million but a loss of $4 million is a better estimate than an…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:44bcb8b1cea52d13973351ec6da0900fd340171435b846acff4ff6e30125dc7c","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-33","para":"55-33","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B5BD4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In this Case, paragraph <a href=\"/asc/450/20/#450-20-30-1\" class=\"xref\">450-20-30-1</a> requires accrual of $4 million. </span></span> </div> </div>","snippet":"In this Case, paragraph 450-20-30-1 requires accrual of $4 million.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4a457d62d478b877fed3a092c84115e58a6fb17dbbf748df7f6a2e8ef76ce6c8","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-34","para":"55-34","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B5D0C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-1\" class=\"xref\">450-20-50-1 through 50-2</a></div> require disclosure of the nature of the contingency </span></span> <span class=\"sfragment\" id=\"sfr_598B5E5C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">and, depending on the circumstances, may require disclosure of the amount of the accrual. </span></span> </div> </div>","snippet":"Paragraphs 450-20-50-1 through 50-2 require disclosure of the nature of the contingency and, depending on the circumstances, may require disclosure of the amount of the accrual.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:34f1055a43214ea7a3b4e0c196227ed0959e830d9140f8002aa77450f0928374","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-35","para":"55-35","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B5FAF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/20/#450-20-50-3\" class=\"xref\">450-20-50-3 through 50-8</a></div> require disclosure of the exposure to an additional amount of loss of up to $5 million. </span></span> </div> </div>","snippet":"Paragraphs 450-20-50-3 through 50-8 require disclosure of the exposure to an additional amount of loss of up to $5 million.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6184303926d6fa6391800f4a1cd6319d920d9b89d842c5d681304f1bd83515ca","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-36","para":"55-36","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_598B6119-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Entity A is the defendant in litigation involving a major competitor claiming patent infringement (Entity B). The suit claims damages of $200 million. Discovery has been completed, and Entity A is engaged in settlement discussions with the plaintiff. Entity A has made an offer of $5 million to settle the case, which offer was rejected by the plaintiff; the plaintiff has made an offer of $35 million to settle the case, which offer was rejected by Entity A. Based on the expressed willingness of the plaintiff to settle the case along with information revealed during discovery and the likely cost and risk to both sides of litigating, Entity A believes that it is probable the case will not come to trial. Accordingly, Entity A has determined that it is probable that it has some liability. Entity A's reasonable estimate of this liability is a range between $10 million and $35 million, with no amount within that range a better estimate than any other amount; accordingly, $10 million was accrued. </span></span> </div> </div>","snippet":"Entity A is the defendant in litigation involving a major competitor claiming patent infringement (Entity B). The suit claims damages of $200 million. Discovery has been completed, and Entity A is engaged in settlement d…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5261be1111d9897189ada13ba73ea65c247750726af9d302cbc552d23fcb3092","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"citation":"450-20-55-37","para":"55-37","html":"<div class=\"asc-body\"><div class=\"norm-text\">Entity A provides the following disclosure in accordance with Section <a altsource=\"GUID-C6FA6504-8DCA-4A60-B7C3-C902B444EF8E.ditamap\" class=\"ditamap\">450-20-50</a>.<ul class=\"ul simple\" id=\"d3e15711-108350__GUID-7E4370C3-7FDB-4CC7-9D0E-3C2E17CC6F3E\"><li class=\"li\" id=\"d3e15711-108350__SL6314950-108350\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_598B62E5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> On March 15, 19X1, Entity B filed a suit against the company claiming patent infringement. While the company believes it has meritorious defenses against the suit, the ultimate resolution of the matter, which is expected to occur within one year, could result in a loss of up to $25 million in excess of the amount accrued. </span></span></div></li></ul></div> </div>","snippet":"Entity A provides the following disclosure in accordance with Section 450-20-50.\nOn March 15, 19X1, Entity B filed a suit against the company claiming patent infringement. While the company believes it has meritorious de…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7adddbcde0d197676bb9496bd33b728d3ccc01429421521e41f065677a9c3499","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a23095ac55ae0a09b796a69e66c4602971bb6aa02101c46cbfa25739bbdf1dad","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a04b6b91f66670a50d98516d38938881cadca12a3f1767bf667baab7d0ef51e5","downloaded_from":"2026-09-10T00:27:21.859Z","last_downloaded_at":"2026-09-10T00:27:21.859Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483051","source_sha256":"782e997ab539424008df0c14289503a23a221f409432edce4ce8a62a5345bcfa"}},{"number":"60","label":"60 Relationships","anchor":"60-relationships","is_sec":false,"groups":[{"block":null,"heading":"Risks and Uncertainties","paragraphs":[{"citation":"450-20-60-1","para":"60-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B1EC4C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For disclosure of certain risks and uncertainties that stem from the nature of an entity's operations and from significant concentrations in certain aspects of an entity's operations, many of which are noninsured or underinsured risks, see Topic <a altsource=\"GUID-294C94E6-5C72-461B-80D4-DB6361097428.ditamap\" class=\"ditamap\">275</a>. </span></span></div></div>","snippet":"For disclosure of certain risks and uncertainties that stem from the nature of an entity's operations and from significant concentrations in certain aspects of an entity's operations, many of which are noninsured or unde…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5be68fbd352a08166e4e9d52ce7db7dcbae5e5187c659af399a1b8abf227aa67","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ae0542b62392abea084c7c6db2d08e4d0b2d8abf83e96ac2c7c7ad550473f6c6","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Receivables","paragraphs":[{"citation":"450-20-60-2","para":"60-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B1F030-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For <a href=\"/glossary/c/#contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain (gain contingency) or loss (loss contingency) to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>contingencies</span></a> related to the collectibility of receivables, see Subtopic <a altsource=\"GUID-B92DF57A-D31A-4A52-999E-127107B41EED.ditamap\" class=\"ditamap\">326-20</a> on financial instruments measured at amortized cost. </span></span></div></div>","snippet":"For contingencies related to the collectibility of receivables, see Subtopic 326-20 on financial instruments measured at amortized cost.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2ecd9b4a54a60001bfb7af80e1976db47a4f5c60560e94ea366ce7c368082adb","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"citation":"450-20-60-3","para":"60-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B1F424-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to the collectibility of a loan portfolio, see Subtopic <a altsource=\"GUID-B92DF57A-D31A-4A52-999E-127107B41EED.ditamap\" class=\"ditamap\">326-20</a>. </span></span></div></div>","snippet":"For contingencies related to the collectibility of a loan portfolio, see Subtopic 326-20.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e5f829e314020a8fc562e1b1d10bf971075c85fe54b50efffc6edff39d6f348c","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cc96d1dc8a1af2ead7c2386bebbdcaec26d69f37ddecd412f463ca9e7fd09830","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Inventory","paragraphs":[{"citation":"450-20-60-4","para":"60-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B1F5E5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For inventories that are impaired by damage, deterioration, obsolescence, changes in price levels, or other causes, see Section <a altsource=\"GUID-4B35A51A-6538-4363-9A02-9CBA0B401253.ditamap\" class=\"ditamap\">330-10-35</a>. </span></span></div></div>","snippet":"For inventories that are impaired by damage, deterioration, obsolescence, changes in price levels, or other causes, see Section 330-10-35.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a7a42daaddc0e6301c83e21031db9d8addf4f93583c72cebd7c46b32423b5af3","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"citation":"450-20-60-5","para":"60-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B1F830-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For losses that are expected to arise from firm, uncancelable, and unhedged commitments for the future purchase of inventory, see Section <a altsource=\"GUID-4B35A51A-6538-4363-9A02-9CBA0B401253.ditamap\" class=\"ditamap\">330-10-35</a>. </span></span></div></div>","snippet":"For losses that are expected to arise from firm, uncancelable, and unhedged commitments for the future purchase of inventory, see Section 330-10-35.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8748c08154130944f71c0bc511aefbff0c35726f5260b7d79bd40302ccaef921","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:75479ab6ec8f6e12433f314b961fccaed7d05b7f4b1d3cd63e280d171e2c3cce","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Liabilities","paragraphs":[{"citation":"450-20-60-6","para":"60-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B1FAB0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For assessments by state guaranty funds and workers' compensation second-injury funds and other assessments related to insurance activities, including insurance activities of an entity that self-insures, see Subtopic <a altsource=\"GUID-8E6C8FDF-15AC-4507-86B2-80E1BA014131.ditamap\" class=\"ditamap\">405-30</a>. </span></span></div></div>","snippet":"For assessments by state guaranty funds and workers' compensation second-injury funds and other assessments related to insurance activities, including insurance activities of an entity that self-insures, see Subtopic 405…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4584c531d799f657e17113dbb76e3b34d2b3865b54008a2e9e45c7a49bdd75cf","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2429e18d05a5c44881948809be2accc3f88b8aef9e780c7b0fb7e04e0034b84e","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Asset Retirement and Environmental Obligations","paragraphs":[{"citation":"450-20-60-7","para":"60-7","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B1FDC9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies associated with the retirement </span></span><span class=\"sfragment\" id=\"sfr_59B1FFBB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">of a tangible long-lived asset that result from the acquisition, construction, or development and/or the normal operation of a long-lived asset, see Subtopic <a altsource=\"GUID-4E041047-932A-4278-AD3B-0D0EF4B282B9.ditamap\" class=\"ditamap\">410-20</a>. </span></span></div></div>","snippet":"For contingencies associated with the retirement of a tangible long-lived asset that result from the acquisition, construction, or development and/or the normal operation of a long-lived asset, see Subtopic 410-20.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a7a4fa96077401f9f2a38d78f25b77a6964cf1fa7bae61d7c881046bb3940ba8","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"citation":"450-20-60-8","para":"60-8","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B20163-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to environmental remediation liabilities that arise from the improper operation of a long-lived asset, see Subtopic <a altsource=\"GUID-B703DF4B-EE18-458A-8968-CCC3E8B5936E.ditamap\" class=\"ditamap\">410-30</a>. </span></span></div></div>","snippet":"For contingencies related to environmental remediation liabilities that arise from the improper operation of a long-lived asset, see Subtopic 410-30.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:28db2593c538bfa4265def32f556591e567a80c36ff47eab80835578e6f9a6be","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7570b1201853aa379a607789c8743e9670d11bbb3e727ab1c4544b1201f39cc5","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Guarantees","paragraphs":[{"citation":"450-20-60-9","para":"60-9","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B20316-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to product warranties and product defects, see the Product Warranties Subsections of Subtopic <a altsource=\"GUID-C9BA38D2-0723-447C-8CD0-073DCA1E8DD3.ditamap\" class=\"ditamap\">460-10</a>. </span></span></div></div>","snippet":"For contingencies related to product warranties and product defects, see the Product Warranties Subsections of Subtopic 460-10.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:dbecf6c83102b61c4f4d8a54aba00858ef025c36bf8590de33b4e1a9a40886c9","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"citation":"450-20-60-10","para":"60-10","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B2050F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to guarantees of indebtedness of others, see Topic <a altsource=\"GUID-B9BF8A6B-4655-41A8-BF76-5BEFB1B846A3.ditamap\" class=\"ditamap\">460</a>. </span></span></div></div>","snippet":"For contingencies related to guarantees of indebtedness of others, see Topic 460.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b6fe9d39b61e0be60ee93ad7e26bb852484d295b03aca22f71e695742049a2d9","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"citation":"450-20-60-11","para":"60-11","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B2071A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to obligations of commercial banks under financial standby letters of credit, see Topic <a altsource=\"GUID-B9BF8A6B-4655-41A8-BF76-5BEFB1B846A3.ditamap\" class=\"ditamap\">460</a>. </span></span></div></div>","snippet":"For contingencies related to obligations of commercial banks under financial standby letters of credit, see Topic 460.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9e15aa7502ccd6ea491036970aa32bda634a927d8a14b7c0cc9b7e130c7554d6","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c5233cda5c8af7a0623ca72713a231e3544c27c96d99db8e8fa728ddcf05e33c","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Debt","paragraphs":[{"citation":"450-20-60-12","para":"60-12","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B208DA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingent payments of a troubled debt restructuring, see Section <a altsource=\"GUID-7DF94C6F-3805-4B5C-9A30-0D78025D7F5B.ditamap\" class=\"ditamap\">470-60-35</a>. </span></span></div></div>","snippet":"For contingent payments of a troubled debt restructuring, see Section 470-60-35.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c0f61885b4865de8725f2d249e81f057b193dc545b2aa46a956206404183e44b","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:20872e5515a295df270ba0ab4700bf5930850186d1cdb57fbfaf0a20d24d25d1","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Compensation—Retirement Benefits","paragraphs":[{"citation":"450-20-60-13","para":"60-13","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B20BC5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to withdrawal from a multiemployer plan, see paragraphs <a href=\"/asc/715/80/#715-80-35-2\" class=\"xref\">715-80-35-2</a> and <a href=\"/asc/715/80/#715-80-50-2\" class=\"xref\">715-80-50-2</a>. </span></span></div></div>","snippet":"For contingencies related to withdrawal from a multiemployer plan, see paragraphs 715-80-35-2 and 715-80-50-2.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8e816828fa301675a5d822638ce961e63e88bdcfbe6be27bfb2fe0f4a21ab908","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8b48569abe7aa075c96d708ffa8356f9fc6cb0947d39af93d5eccfb14237c186","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Other Expenses","paragraphs":[{"citation":"450-20-60-14","para":"60-14","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B20DD5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to an insurance contract or <a href=\"/glossary/r/#reinsurance\" class=\"term\" title=\"A transaction in which a reinsurer (assuming entity), for a consideration (premium), assumes all or part of a risk undertaken originally by another insurer (ceding entity). For indemnity reinsurance, the legal rights of the insured are not affected by the reinsurance transaction and the insurance entity issuing the insurance contract remains liable to the insured for payment of policy benefits. Assumption or novation reinsurance contracts that are legal replacements of one insurer by another extinguish the ceding entity's liability to the policyholder.\"><span>reinsurance</span></a> contract that does not, despite its form, provide for indemnification of the insured or the ceding company by the insurer or reinsurer against loss or liability, see paragraph <a href=\"/asc/720/20/#720-20-25-1\" class=\"xref\">720-20-25-1</a>. </span></span></div></div>","snippet":"For contingencies related to an insurance contract or reinsurance contract that does not, despite its form, provide for indemnification of the insured or the ceding company by the insurer or reinsurer against loss or lia…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c2945bea790501c6940c773c14fda4b63fc6575e81df737d157fa97d61513a89","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b2e4b9983477b7056f7032c96b7acca16059911639ac035e9e3d1b7bbfe17a23","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Leases","paragraphs":[{"citation":"450-20-60-15","para":"60-15","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B212C1-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For <a href=\"/glossary/v/#variable-lease-payments\" class=\"term\" title=\"Payments made by a lessee to a lessor for the right to use an underlying asset that vary because of changes in facts or circumstances occurring after the commencement date, other than the passage of time.\"><span>variable lease payments</span></a>, see paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/842/10/#842-10-55-1\" class=\"xref\">842-10-55-1 through 55-2</a></div>. </span></span></div></div>","snippet":"For variable lease payments, see paragraphs 842-10-55-1 through 55-2.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e67b6d688049e0a68f70e9178551784ac9103a47f4c4ec735bd174dfc4078976","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"citation":"450-20-60-16","para":"60-16","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B216FC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For the classification effects of a provision in a lease that requires lessee indemnifications for environmental contamination caused by the lessee during its use of the property, see paragraph <a href=\"/asc/842/10/#842-10-55-15\" class=\"xref\">842-10-55-15</a>. </span></span></div></div>","snippet":"For the classification effects of a provision in a lease that requires lessee indemnifications for environmental contamination caused by the lessee during its use of the property, see paragraph 842-10-55-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:974c94eb0831b1184e83e0a77f57617bd793b73d6910b10b66091ae7a7e30b63","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:32ab08cae38d044df8398e7f0e6ac53c7abfbed17c1cc0bf76903064bb9063cd","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Transfers and Servicing","paragraphs":[{"citation":"450-20-60-17","para":"60-17","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B218BB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to agreements to repurchase receivables (or to repurchase the related property) that have been sold or otherwise assigned, see Section <a altsource=\"GUID-2B788674-9D0A-432B-A59D-B1470F2DC999.ditamap\" class=\"ditamap\">860-10-40</a>. </span></span></div></div>","snippet":"For contingencies related to agreements to repurchase receivables (or to repurchase the related property) that have been sold or otherwise assigned, see Section 860-10-40.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ec14e12ed06391610023e0369a547026cc20458a2e1dfc3789bea97753674b1b","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bd5955a6b144a6e30c62a1a151b67efdf513c33d550196cbae807cb96ffd7680","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Extractive Activities—Mining","paragraphs":[{"citation":"450-20-60-18","para":"60-18","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B21ABA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies resulting from the Coal Industry Retiree Health Benefit Act of 1992, see Subtopic <a altsource=\"GUID-4C3F806C-4C8F-492C-9F7D-42038EB04F1A.ditamap\" class=\"ditamap\">930-715</a>. </span></span></div></div>","snippet":"For contingencies resulting from the Coal Industry Retiree Health Benefit Act of 1992, see Subtopic 930-715.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:efcb364f949b36da5202e3241174e07626b773629949c554d75412d627db0978","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2fd3fc8565d0f8af39a5f9aa548f490f59becfa131acb34d18021d8b8b88a539","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Financial Services—Insurance","paragraphs":[{"citation":"450-20-60-19","para":"60-19","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B21C43-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to the risk of loss that is assumed by a property and casualty insurance entity or reinsurance entity when it issues an insurance policy covering risk of loss from catastrophes, see Subtopic <a altsource=\"GUID-DE23C1D2-8518-4C4F-B092-B41011D05673.ditamap\" class=\"ditamap\">944-40</a>. </span></span></div></div>","snippet":"For contingencies related to the risk of loss that is assumed by a property and casualty insurance entity or reinsurance entity when it issues an insurance policy covering risk of loss from catastrophes, see Subtopic 944…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:107d45c25e33cebda7d6d87ec7061b6cc9fc79616592b05f2a8263e7abbbab91","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9b2c29d1ac49e84bb6890f043bca4fa9ca05721b945d5b487a63d63d0b3eec53","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Financial Services—Investment Companies","paragraphs":[{"citation":"450-20-60-20","para":"60-20","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B21DC4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to the collectibility of interest receivable, including purchased interest, see paragraph <a href=\"/asc/320/946/#320-946-35-17\" class=\"xref\">946-320-35-17 to 35-19</a>. </span></span></div></div>","snippet":"For contingencies related to the collectibility of interest receivable, including purchased interest, see paragraph 946-320-35-17 to 35-19.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0bb32367427d571392bb57a266a8b6dc75bce4736820c36e3a300b7f678239ef","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9fd9d36da87e5ec0710077abd7801f12c204173728f5aa3713ec59125405e805","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"block":null,"heading":"Health Care Entities","paragraphs":[{"citation":"450-20-60-21","para":"60-21","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59B21F41-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For contingencies related to malpractice claims, see Subtopic <a altsource=\"GUID-B81F3F43-0F3B-464D-9DE4-723FBB04BF56.ditamap\" class=\"ditamap\">954-450</a>. </span></span></div></div>","snippet":"For contingencies related to malpractice claims, see Subtopic 954-450.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8569ac8d20a1d97ee1b169ee63873e866700ee779e5d2841aa3272e02ecbb9f9","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8e002f46162e5fc4a2ef54eced427ea5e1c34d97fd9f02177d6f4689d8418adc","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4a07c42590c45cef8fa2c3de1e8ae15bcdc877a9a348b65cfe5f1ca41ce6f7c1","downloaded_from":"2026-09-10T00:27:25.699Z","last_downloaded_at":"2026-09-10T00:27:25.699Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483025","source_sha256":"1bd5e7156d93a3816bc0405d9ba0497d2b0379cea6afa250e82b22343b0e4178"}},{"number":"S00","label":"SEC 00 Status","anchor":"sec-00-status","is_sec":true,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-20-S00-1","para":"S00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" frame=\"all\" id=\"SL5311990-161645\"><tr><td class=\"entry text-align-center\" colspan=\"1\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-S99-1\" class=\"xref\">450-20-S99-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2012-03/\" class=\"xref\">Accounting Standards Update No. 2012-03</a></td><td class=\"entry\">08/27/2012</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/20/#450-20-S99-1\" class=\"xref\">450-20-S99-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2009-07/\" class=\"xref\">Accounting Standards Update No. 2009-07</a></td><td class=\"entry\">09/15/2009</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n|\n450-20-S99-1 | Amended | Accounting Standards Update No. 2012-03 | 08/27/2012 |\n450-20-S99-1 |…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4732860757b4b08102469a67cce8d5012771466fcdecd8cd208d1f3c24a8b266","downloaded_from":"2026-09-10T00:27:31.843Z","last_downloaded_at":"2026-09-10T00:27:31.843Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480254","source_sha256":"a8c653a8cb24994e3576e7af44c5d77bba0f64934c7b850c686ecd7e067d29b2"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e5a02c97236c16ef09d878129a22115428f6ba30d97061dd561c220c1f061223","downloaded_from":"2026-09-10T00:27:31.843Z","last_downloaded_at":"2026-09-10T00:27:31.843Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480254","source_sha256":"a8c653a8cb24994e3576e7af44c5d77bba0f64934c7b850c686ecd7e067d29b2"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:999cea4d9f33cff1494f54f445d254375b3dc15e818876ced8cbd6f9d63e9d27","downloaded_from":"2026-09-10T00:27:31.843Z","last_downloaded_at":"2026-09-10T00:27:31.843Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480254","source_sha256":"a8c653a8cb24994e3576e7af44c5d77bba0f64934c7b850c686ecd7e067d29b2"}},{"number":"S25","label":"SEC 25 Recognition","anchor":"sec-25-recognition","is_sec":true,"groups":[{"block":null,"heading":"Accounting for Legal Costs","paragraphs":[{"citation":"450-20-S25-1","para":"S25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59D719F3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/450/20/#450-20-S99-2\" class=\"xref\">450-20-S99-2</a>, SEC Staff Announcement: Accounting for Legal Costs Expected to Be Incurred in Connection with a Loss Contingency, for SEC Staff views on the recognition of such costs. </span></span></div></div>","snippet":"See paragraph 450-20-S99-2, SEC Staff Announcement: Accounting for Legal Costs Expected to Be Incurred in Connection with a Loss Contingency, for SEC Staff views on the recognition of such costs.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:95f4787e783cb5ebcc2944380ed1951885f902fc134c53f915e23058d1eb4add","downloaded_from":"2026-09-10T00:27:35.851Z","last_downloaded_at":"2026-09-10T00:27:35.851Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480225","source_sha256":"80074c646f4fcfaccee6fbcb978ef0c015212063dc76de5d2ce04397bf7c4c9e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a1272a0dc1653668b730ba510525b0592f79ca87f189e592e7df20183ef96b0d","downloaded_from":"2026-09-10T00:27:35.851Z","last_downloaded_at":"2026-09-10T00:27:35.851Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480225","source_sha256":"80074c646f4fcfaccee6fbcb978ef0c015212063dc76de5d2ce04397bf7c4c9e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6aff3e23c9a3afc124a932dbd1bbd65c5d7439356a51c53e746caa3767f1dafc","downloaded_from":"2026-09-10T00:27:35.851Z","last_downloaded_at":"2026-09-10T00:27:35.851Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480225","source_sha256":"80074c646f4fcfaccee6fbcb978ef0c015212063dc76de5d2ce04397bf7c4c9e"}},{"number":"S30","label":"SEC 30 Initial Measurement","anchor":"sec-30-initial-measurement","is_sec":true,"groups":[{"block":null,"heading":"Use of Discounts","paragraphs":[{"citation":"450-20-S30-1","para":"S30-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59DF1609-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/450/20/#450-20-S99-1\" class=\"xref\">450-20-S99-1</a>, SAB Topic 5.Y, Question 1, for the SEC Staff views on the use of discounts to measure loss contingencies. </span></span></div></div>","snippet":"See paragraph 450-20-S99-1, SAB Topic 5.Y, Question 1, for the SEC Staff views on the use of discounts to measure loss contingencies.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1897af79f392ee312a8abf60638891005e26b24222b3fb699e82d0dbe7e4f0ad","downloaded_from":"2026-09-10T00:27:37.671Z","last_downloaded_at":"2026-09-10T00:27:37.671Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480195","source_sha256":"61f28f2f9a1499849405066a36232fc06af37e1c63633b5fb41bead97c9a2ab6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:601b71af2ee62d7ba4892118428f697f8c9e0d6c47e83a50909d7bc35d260e55","downloaded_from":"2026-09-10T00:27:37.671Z","last_downloaded_at":"2026-09-10T00:27:37.671Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480195","source_sha256":"61f28f2f9a1499849405066a36232fc06af37e1c63633b5fb41bead97c9a2ab6"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e35ac2011e76ebf1dd13ddb32f1a4a89fb9ec19eccb62b362620275cf4696d0e","downloaded_from":"2026-09-10T00:27:37.671Z","last_downloaded_at":"2026-09-10T00:27:37.671Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480195","source_sha256":"61f28f2f9a1499849405066a36232fc06af37e1c63633b5fb41bead97c9a2ab6"}},{"number":"S50","label":"SEC 50 Disclosure","anchor":"sec-50-disclosure","is_sec":true,"groups":[{"block":null,"heading":"Accruals for Loss Contingencies","paragraphs":[{"citation":"450-20-S50-1","para":"S50-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59E7B76A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/450/20/#450-20-S99-1\" class=\"xref\">450-20-S99-1</a>, SAB Topic 5.Y., Question 2 and Question 4, for the SEC Staff views on disclosures pertaining to loss contingencies. </span></span></div></div>","snippet":"See paragraph 450-20-S99-1, SAB Topic 5.Y., Question 2 and Question 4, for the SEC Staff views on disclosures pertaining to loss contingencies.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1c1fda0b4620097a49fdd5cde73ce70792c921060d0d9f0850a4807779740e42","downloaded_from":"2026-09-10T00:27:39.885Z","last_downloaded_at":"2026-09-10T00:27:39.885Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480164","source_sha256":"c62e3698930eed065d726cd4e16c5a7403ecc7c9dda1a18f3cb97d89acacb93e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8ec570290a6a311c645475acd11ed886b27479e813ce6a1ec20acfc14d34889c","downloaded_from":"2026-09-10T00:27:39.885Z","last_downloaded_at":"2026-09-10T00:27:39.885Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480164","source_sha256":"c62e3698930eed065d726cd4e16c5a7403ecc7c9dda1a18f3cb97d89acacb93e"}},{"block":null,"heading":"Policy for Accrual of Legal Costs","paragraphs":[{"citation":"450-20-S50-2","para":"S50-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_59E7B86E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/450/20/#450-20-S99-2\" class=\"xref\">450-20-S99-2</a>, SEC Staff Announcement: Accounting for Legal Costs Expected to be Incurred in Connection with a Loss Contingency, for SEC Staff views on disclosures related to such accounting. </span></span></div></div>","snippet":"See paragraph 450-20-S99-2, SEC Staff Announcement: Accounting for Legal Costs Expected to be Incurred in Connection with a Loss Contingency, for SEC Staff views on disclosures related to such accounting.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:06b657e2c0cbed05ac65e16cb2a2c05aabbd1c5da2d614e4293cfb85751e444a","downloaded_from":"2026-09-10T00:27:39.885Z","last_downloaded_at":"2026-09-10T00:27:39.885Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480164","source_sha256":"c62e3698930eed065d726cd4e16c5a7403ecc7c9dda1a18f3cb97d89acacb93e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:783bd46ea23562dc3e24dee0370376d562ace20248d40576ba0a97cc52d42b24","downloaded_from":"2026-09-10T00:27:39.885Z","last_downloaded_at":"2026-09-10T00:27:39.885Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480164","source_sha256":"c62e3698930eed065d726cd4e16c5a7403ecc7c9dda1a18f3cb97d89acacb93e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:48a9be9331e8b0db545d75eca9e3491b147153ec108370212327462f9cabe21a","downloaded_from":"2026-09-10T00:27:39.885Z","last_downloaded_at":"2026-09-10T00:27:39.885Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480164","source_sha256":"c62e3698930eed065d726cd4e16c5a7403ecc7c9dda1a18f3cb97d89acacb93e"}},{"number":"S99","label":"SEC 99 SEC Materials","anchor":"sec-99-sec-materials","is_sec":true,"groups":[{"block":null,"heading":"SEC Staff Guidance","paragraphs":[{"citation":"450-20-S99-1","para":"S99-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following is the text of SAB Topic 5.Y, Accounting and Disclosures Relating to Loss Contingencies.<ul class=\"ul simple\" id=\"d3e149875-122751__GUID-BEF19604-CC4E-4BBC-9684-9A815D22FB65\"><li class=\"li\" id=\"d3e149875-122751__SL6397365-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A05F69B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Facts: A registrant believes it may be obligated to pay material amounts as a result of product or environmental remediation liability. These amounts may relate to, for example, damages attributed to the registrant's products or processes, clean-up of hazardous wastes, reclamation costs, fines, and litigation costs. The registrant may seek to recover a portion or all of these amounts by filing a claim against an insurance carrier or other third parties. </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397366-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A05F896-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Question 1: Assuming that the registrant's estimate of an environmental remediation or product liability meets the conditions set forth in FASB ASC paragraph <a href=\"/asc/410/30/#410-30-35-12\" class=\"xref\">410-30-35-12</a> (Asset Retirement and Environmental Obligations Topic) for recognition on a discounted basis, what discount rate should be applied and what, if any, special disclosures are required in the notes to the financial statements? </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397367-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A05FA42-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Interpretive Response: The rate used to discount the cash payments should be the rate that will produce an amount at which the environmental or product liability could be settled in an arm's-length transaction with a third party. Further, the discount rate used to discount the cash payments should not exceed the interest rate on monetary assets that are essentially risk free FN48 and have maturities comparable to that of the environmental or product liability. </span></span></div><ul class=\"ul simple\" id=\"d3e149875-122751__GUID-B90135C0-7EEF-4E35-84B7-5FBA04A6BAEB\"><li class=\"li\" id=\"d3e149875-122751__SL6397368-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A05FBCC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">FN48 As described in Concepts Statement 7, <em class=\"ph i\">Using Cash Flow Information and Present Value in Accounting Measurements</em>. </span></span></div></li></ul></li><li class=\"li\" id=\"d3e149875-122751__SL6397369-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A05FD63-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the liability is recognized on a discounted basis to reflect the time value of money, the notes to the financial statements should, at a minimum, include disclosures of the discount rate used, the expected aggregate undiscounted amount, expected payments for each of the five succeeding years and the aggregate amount thereafter, and a reconciliation of the expected aggregate undiscounted amount to amounts recognized in the statements of financial position. Material changes in the expected aggregate amount since the prior balance sheet date, other than those resulting from pay-down of the obligation, should be explained. </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397370-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A05FEEF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Question 2: What financial statement disclosures should be furnished with respect to recorded and unrecorded product or environmental remediation liabilities? </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397371-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A060083-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Interpretive Response: FASB ASC Section <a altsource=\"GUID-C6FA6504-8DCA-4A60-B7C3-C902B444EF8E.ditamap\" class=\"ditamap\">450-20-50</a>, Contingencies—Loss Contingencies—Disclosure, identifies disclosures regarding loss contingencies that generally are furnished in notes to financial statements. FASB ASC Section <a altsource=\"GUID-1C8474F5-2429-4094-B19D-D7A5C97E464D.ditamap\" class=\"ditamap\">410-30-50</a>, Asset Retirement and Environmental Obligations—Environmental Obligations—Disclosure, identifies disclosures that are required and recommended regarding both recorded and unrecorded environmental remediation liabilities. The staff believes that product and environmental remediation liabilities typically are of such significance that detailed disclosures regarding the judgments and assumptions underlying the recognition and measurement of the liabilities are necessary to prevent the financial statements from being misleading and to inform readers fully regarding the range of reasonably possible outcomes that could have a material effect on the registrant's financial condition, results of operations, or liquidity. In addition to the disclosures required by FASB ASC Section <a altsource=\"GUID-C6FA6504-8DCA-4A60-B7C3-C902B444EF8E.ditamap\" class=\"ditamap\">450-20-50</a> and FASB ASC Section <a altsource=\"GUID-1C8474F5-2429-4094-B19D-D7A5C97E464D.ditamap\" class=\"ditamap\">410-30-50</a>, examples of disclosures that may be necessary include: </span></span></div><ul class=\"ul simple\" id=\"d3e149875-122751__GUID-BCFAA025-2D9A-48E2-B1FB-EEAD162E8B9A\"><li class=\"li\" id=\"d3e149875-122751__SL6397372-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A060213-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Circumstances affecting the reliability and precision of loss estimates. </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397373-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A060386-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The extent to which unasserted claims are reflected in any accrual or may affect the magnitude of the contingency. </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397374-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A0604F4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Uncertainties with respect to joint and several liability that may affect the magnitude of the contingency, including disclosure of the aggregate expected cost to remediate particular sites that are individually material if the likelihood of contribution by the other significant parties has not been established. </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397375-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A06066E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Disclosure of the nature and terms of cost-sharing arrangements with other potentially responsible parties. </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397376-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A0607D3-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The extent to which disclosed but unrecognized contingent losses are expected to be recoverable through insurance, indemnification arrangements, or other sources, with disclosure of any material limitations of that recovery. </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397377-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A06099A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Uncertainties regarding the legal sufficiency of insurance claims or solvency of insurance carriers. FN49 </span></span></div><ul class=\"ul simple\" id=\"d3e149875-122751__GUID-787D13DC-154C-403F-B34D-9F5AAB8778AD\"><li class=\"li\" id=\"d3e149875-122751__SL6397378-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A060B0B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">FN49 The staff believes there is a rebuttable presumption that no asset should be recognized for a claim for recovery from a party that is asserting that it is not liable to indemnify the registrant. Registrants that overcome that presumption should disclose the amount of recorded recoveries that are being contested and discuss the reasons for concluding that the amounts are probable of recovery. </span></span></div></li></ul></li><li class=\"li\" id=\"d3e149875-122751__SL6397379-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A060CC9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The time frame over which the accrued or presently unrecognized amounts may be paid out. </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397380-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A060E9D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Material components of the accruals and significant assumptions underlying estimates. </span></span></div></li></ul></li><li class=\"li\" id=\"d3e149875-122751__SL6397381-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A061039-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Registrants are cautioned that a statement that the contingency is not expected to be material does not satisfy the requirements of FASB ASC Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a> if there is at least a reasonable possibility that a loss exceeding amounts already recognized may have been incurred and the amount of that additional loss would be material to a decision to buy or sell the registrant's securities. In that case, the registrant must either (a) disclose the estimated additional loss, or range of loss, that is reasonably possible, or (b) state that such an estimate cannot be made. </span></span></div></li><li class=\"li\" id=\"d3e149875-122751__SL6397382-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A0611B0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Question 4: What disclosures should be furnished with respect to site restoration costs or other environmental remediation costs? FN52 </span></span></div><ul class=\"ul simple\" id=\"d3e149875-122751__GUID-5A7400CD-55F7-40F1-8DF4-16B77A76F7DE\"><li class=\"li\" id=\"d3e149875-122751__SL6397383-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A061315-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">FN52 Registrants are reminded that FASB ASC Subtopic <a altsource=\"GUID-4E041047-932A-4278-AD3B-0D0EF4B282B9.ditamap\" class=\"ditamap\">410-20</a>, Asset Retirement and Environmental Obligations—Asset Retirement Obligations, provides guidance for accounting and reporting for costs associated with asset retirement obligations. </span></span></div></li></ul></li><li class=\"li\" id=\"d3e149875-122751__SL6397384-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A0614DB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Interpretive Response: The staff believes that material liabilities for site restoration, post-closure, and monitoring commitments, or other exit costs that may occur on the sale, disposal, or abandonment of a property as a result of unanticipated contamination of the asset should be disclosed in the notes to the financial statements. Appropriate disclosures generally would include the nature of the costs involved, the total anticipated cost, the total costs accrued to date, the balance sheet classification of accrued amounts, and the range or amount of reasonably possible additional losses. If an asset held for sale or development will require remediation to be performed by the registrant prior to development, sale, or as a condition of sale, a note to the financial statements should describe how the necessary expenditures are considered in the assessment of the asset's value and the possible need to reflect an impairment loss. Additionally, if the registrant may be liable for remediation of environmental damage relating to assets or businesses previously disposed, disclosure should be made in the financial statements unless the likelihood of a material unfavorable outcome of that contingency is remote. FN53 The registrant's accounting policy with respect to such costs should be disclosed in accordance with FASB ASC Topic <a altsource=\"GUID-1F1D7CAF-6E05-4ECA-9FC2-6AE06A642580.ditamap\" class=\"ditamap\">235</a>, Notes to Financial Statements. </span></span></div><ul class=\"ul simple\" id=\"d3e149875-122751__GUID-797F9387-AE58-4C8A-B0B7-FFF83596B1F9\"><li class=\"li\" id=\"d3e149875-122751__SL6397385-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A06167E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">FN53 If the company has a guarantee as defined by FASB ASC Topic <a altsource=\"GUID-B9BF8A6B-4655-41A8-BF76-5BEFB1B846A3.ditamap\" class=\"ditamap\">460</a>, Guarantees, the entity is required to provide the disclosures and recognize the fair value of the guarantee in the company's financial statements even if the \"contingent\" aspect of the guarantee is deemed to be remote. </span></span></div></li></ul></li></ul></div></div>","snippet":"The following is the text of SAB Topic 5.Y, Accounting and Disclosures Relating to Loss Contingencies.\nFacts: A registrant believes it may be obligated to pay material amounts as a result of product or environmental reme…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2bb745ab26585518edf7768d542cef8a86f02719faae7d0030315d117d9948ec","downloaded_from":"2026-09-10T00:27:44.704Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480102","source_sha256":"ebc9853ff2eca2f8d8e52d550e0b2d7a24f7c3032dbe1614b075c63a1e6accc9"}},{"citation":"450-20-S99-2","para":"S99-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following is the text of SEC Staff Announcement: Accounting for Legal Costs Expected to Be Incurred in Connection with a Loss Contingency.<ul class=\"ul simple\" id=\"d3e149971-122751__GUID-659C3188-EFE2-48FE-9BB9-6DB0567A9181\"><li class=\"li\" id=\"d3e149971-122751__SL6397386-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A061841-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Dates Discussed: January 23, 1997; March 24-25, 1999 </span></span></div></li><li class=\"li\" id=\"d3e149971-122751__SL6397387-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A0619A1-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The Task Force discussed a potential new issue relating to the accounting for legal costs expected to be incurred in connection with a FASB Statement No. 5, Accounting for Contingencies, loss contingency. Some Task Force members observed that they believe practice typically has expensed such costs as incurred; however, other Task Force members suggested that practice may not be consistent in this area. The Task Force declined to add this potential new issue to its agenda. </span></span></div></li><li class=\"li\" id=\"d3e149971-122751__SL6397388-122751\"><div class=\"p\"><span class=\"sfragment\" id=\"sfr_5A061AF1-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The SEC Observer noted that the SEC staff would expect a registrant's accounting policy to be applied consistently and that APB Opinion No. 22, Disclosure of Accounting Policies, requires disclosure of material accounting policies and the methods of applying those policies. </span></span></div></li></ul></div></div>","snippet":"The following is the text of SEC Staff Announcement: Accounting for Legal Costs Expected to Be Incurred in Connection with a Loss Contingency.\nDates Discussed: January 23, 1997; March 24-25, 1999\nThe Task Force discussed…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:251386d14a4a77719f129c8641646fe36bea4dc75866b8e30767e2e5d4d5adc7","downloaded_from":"2026-09-10T00:27:44.704Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480102","source_sha256":"ebc9853ff2eca2f8d8e52d550e0b2d7a24f7c3032dbe1614b075c63a1e6accc9"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3fe99cae3f844a73a83f066a6889f7cba4babdc140b69723e056444bd6b5da64","downloaded_from":"2026-09-10T00:27:44.704Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480102","source_sha256":"ebc9853ff2eca2f8d8e52d550e0b2d7a24f7c3032dbe1614b075c63a1e6accc9"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d2e3dad00128db63457a0fdc7ef3f8378d788f34d799ca1eedbedf394f38efb4","downloaded_from":"2026-09-10T00:27:44.704Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147480102","source_sha256":"ebc9853ff2eca2f8d8e52d550e0b2d7a24f7c3032dbe1614b075c63a1e6accc9"}}],"enrichment":{"summary":"ASC 450-20 governs when a loss contingency must be accrued as a charge to income and when it must instead be disclosed. A loss is accrued only if, based on information available before the financial statements are issued, it is probable that an asset was impaired or a liability incurred at the balance sheet date and the amount of loss is reasonably estimable (450-20-25-2). If the estimate is a range, the best estimate in the range is accrued, or the minimum of the range if no amount is better than any other (450-20-30-1); if accrual criteria are not met but a loss is at least reasonably possible, disclosure of the nature of the contingency and an estimate of possible loss (or a statement that none can be made) is required (450-20-50-3 through 50-4).","key_points":["Accrual requires both conditions of 450-20-25-2: (a) information available before issuance indicates it is probable that an asset had been impaired or a liability incurred at the date of the financial statements, and (b) the amount of loss is reasonably estimable.","A range estimate does not defer accrual: per 450-20-25-5 and 450-20-30-1, accrue the amount that is the better estimate within the range, or the minimum of the range if no amount is better than any other (e.g., accrue $3 million of a $3-$9 million range).","Losses relating to future periods, general or unspecified business risks, and mere absence of insurance are not accruable (450-20-25-3, 450-20-25-8, 450-20-55-5, 450-20-55-7); events causing impairment after the balance sheet date fail condition (a) (450-20-25-6).","If probability is met but the amount cannot be reasonably estimated, the loss is charged to income in the period it becomes estimable and is never treated as a prior period adjustment (450-20-25-7); disclosure is preferable to accrual in that period (450-20-50-5).","Disclosure is required when there is at least a reasonable possibility that a loss or additional loss was incurred and either no accrual was made or exposure exists beyond the amount accrued, and must state the nature of the contingency and an estimate of possible loss or range, or that no estimate can be made (450-20-50-3 through 50-4).","For unasserted claims, no disclosure is required unless it is probable a claim will be asserted and there is a reasonable possibility of an unfavorable outcome (450-20-50-6; 450-20-55-14 through 55-15).","Accruals must be labeled descriptively (e.g., 'estimated liability'); the term 'reserve' is prohibited for a 450-20-25-2 accrual, and accrual itself sets aside no funds and provides no economic protection (450-20-50-1; 450-20-05-8 through 05-9)."],"categories":["Contingencies and guarantees","Recognition","Initial measurement","Disclosure"],"audience_level":"introductory","student_note":"This is the classic litigation-accrual rule tested on exams: probable + estimable = accrue; reasonably possible = disclose only; remote = generally nothing. The most common error is thinking a wide range of loss defeats estimability — instead you accrue the minimum of the range and disclose the additional exposure.","related_topics":["450-10","450-30","460","855","275","410-30"],"key_concepts":["loss contingency","probable, reasonably possible, remote","reasonably estimable","range of loss","minimum of range accrual","unasserted claims and assessments","pending or threatened litigation","subsequent events"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b88725758e9fb0c035bc42a39b2890c75b9b16b41778b0293dba60334e74e7b9","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"450-10","title":"Overall","topic_title":"Contingencies","score":0.8777,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:eb055d90a651594da5e9319cf495cd90ffc654232f91ed7567aba05c9364ae2e","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-30","title":"Gain Contingencies","topic_title":"Contingencies","score":0.824,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c3b4df1a2bd185bc2bf2c8e094745ce8662c4f7d20c08d08a0e487c7d9f95ce5","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:28:10.377Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"275-10","title":"Overall","topic_title":"Risks and Uncertainties","score":0.8211,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b23a836084ec28a7684d4e6527721971e814c76655065cb31d32542ff294a7f0","downloaded_from":"2026-09-09T23:21:55.847Z","last_downloaded_at":"2026-09-09T23:22:20.205Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-954","title":"Health Care Entities","topic_title":"Contingencies","score":0.7905,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:331f0aaa9bb0d4c5754a5df2f33eb5257beb5c7b916c8e5e03268388b9df4235","downloaded_from":"2026-09-10T00:28:27.303Z","last_downloaded_at":"2026-09-10T00:28:57.040Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"440-10","title":"Overall","topic_title":"Commitments","score":0.7718,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0be90fea9f6fac574d25e9ab114b2bcbd3b8a75e768e35e3c327ee90bd4bdb12","downloaded_from":"2026-09-10T00:25:16.890Z","last_downloaded_at":"2026-09-10T00:25:37.457Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"460-10","title":"Overall","topic_title":"Guarantees","score":0.7542,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:65d56668e385e14ba5aa8e57f43958017cecfa64b338e400b839656e11cf1a57","downloaded_from":"2026-09-10T00:29:25.783Z","last_downloaded_at":"2026-09-10T00:30:02.138Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"450-10","title":"Overall","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:718fd25cc3cc94d19765f9c7cafde62f95632d802beb9c16f61a280972d43bff","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"450-30","title":"Gain Contingencies","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8ee5e4c5fb04964bcaa29de4b3c01be4af2a83290d89406690bb476a1dbf70c6","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:28:10.377Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9ad6b9ace38e8df0e1bf33716f25a9ac2220c1ca4f05aeac0aff5572099ac313","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-30","topic":"450","title":"Gain Contingencies","area":"Liabilities","paragraphs":11,"summary":"ASC 450-30 governs gain contingencies — existing conditions or situations involving uncertainty that may result in a future gain to the entity. The core rule is asymmetric to loss contingencies: a gain contingency usually should not be reflected in the financial statements, because doing so might recognize revenue before it is realized (450-30-25-1). Instead, adequate disclosure is required, worded carefully so as not to imply that realization is more likely than it is (450-30-50-1).","concepts":["gain contingency","realization","conservatism asymmetry","adequate disclosure","misleading implications","insurance recoveries","offsetting receivable against liability","variable lease payments"],"categories":["Recognition","Disclosure","Contingencies and guarantees","Presentation"],"level":"introductory","topic_title":"Contingencies","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-30-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" id=\"SL77940446-209996\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#commencement-date-of-the-lease-commencement-date\" class=\"term\" title=\"The date on which a lessor makes an underlying asset available for use by a lessee. See paragraphs 842-10-55-19842-10-55-20842-10-55-21 for implementation guidance on the commencement date.\"><span>Commencement Date of the Lease (Commencement Date)</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#contract\" class=\"term\" title=\"An agreement between two or more parties that creates enforceable rights and obligations.\"><span>Contract</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/d/#direct-financing-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets none of the criteria in paragraph 842-10-25-2 but meets the criteria in paragraph 842-10-25-3(b)and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>Direct Financing Lease</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2021-05/\" class=\"xref\">Accounting Standards Update No. 2021-05</a></td><td class=\"entry\">07/19/2021</td></tr><tr><td class=\"entry\"><a href=\"/glossary/d/#direct-financing-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets none of the criteria in paragraph 842-10-25-2 but meets the criteria in paragraph 842-10-25-3(b)and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>Direct Financing Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/f/#finance-lease\" class=\"term\" title=\"From the perspective of a lessee, a lease that meets one or more of the criteria in paragraph 842-10-25-2.\"><span>Finance Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lease\" class=\"term\" title=\"A contract, or part of a contract, that conveys the right to control the use of identified property, plant, or equipment (an identified asset) for a period of time in exchange for consideration.\"><span>Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lessee\" class=\"term\" title=\"An entity that enters into a contract to obtain the right to use an underlying asset for a period of time in exchange for consideration.\"><span>Lessee</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/l/#lessor\" class=\"term\" title=\"An entity that enters into a contract to provide the right to use an underlying asset for a period of time in exchange for consideration.\"><span>Lessor</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/o/#operating-lease\" class=\"term\" title=\"From the perspective of a lessee, any lease other than a finance lease. From the perspective of a lessor, any lease other than a sales-type lease or a direct financing lease.\"><span>Operating Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/s/#sales-type-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets one or more of the criteria in paragraph 842-10-25-2 and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>Sales-Type Lease</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2021-05/\" class=\"xref\">Accounting Standards Update No. 2021-05</a></td><td class=\"entry\">07/19/2021</td></tr><tr><td class=\"entry\"><a href=\"/glossary/s/#sales-type-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets one or more of the criteria in paragraph 842-10-25-2 and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>Sales-Type Lease</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/u/#underlying-asset\" class=\"term\" title=\"An asset that is the subject of a lease for which a right to use that asset has been conveyed to a lessee. The underlying asset could be a physically distinct portion of a single asset.\"><span>Underlying Asset</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/v/#variable-lease-payments\" class=\"term\" title=\"Payments made by a lessee to a lessor for the right to use an underlying asset that vary because of changes in facts or circumstances occurring after the commencement date, other than the passage of time.\"><span>Variable Lease Payments</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/450/30/#450-30-60-5\" class=\"xref\">450-30-60-5</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-02/\" class=\"xref\">Accounting Standards Update No. 2016-02</a></td><td class=\"entry\">02/25/2016</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\nCommencement Date of the Lease (Commencement Date) | Added | Accounting Standards Update…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f03b36d85f881007db180b0ca814003f7f741bd891eca10b7481931f6df54400","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:27:48.583Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482973","source_sha256":"3e11435d26712c19cd2ed116a518c87c7a2d7d3ea6db75df90887d56c85a501a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:52bcdbbf34b5503a2516e1c1593f759ad5552a85ec57e8643784a50797763e34","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:27:48.583Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482973","source_sha256":"3e11435d26712c19cd2ed116a518c87c7a2d7d3ea6db75df90887d56c85a501a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2fe6f59e0df5d2437dfee15e2ffafabc687d8cff4150c0280feac8cf2a2a0712","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:27:48.583Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482973","source_sha256":"3e11435d26712c19cd2ed116a518c87c7a2d7d3ea6db75df90887d56c85a501a"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-30-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic provides guidance for the recognition and disclosure of a <a href=\"/glossary/g/#gain-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>gain contingency</span></a>.</div></div>","snippet":"This Subtopic provides guidance for the recognition and disclosure of a gain contingency.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fb2b08a8b51fa19a8dda4e6e90840ac62f456df3b1fdaf9d26d9add13d9ded1e","downloaded_from":"2026-09-10T00:27:52.539Z","last_downloaded_at":"2026-09-10T00:27:52.539Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482947","source_sha256":"b33a7b2b743f2adbbf41278adf361316c59b597f21a28b5771b9a16f81abc7b0"}},{"citation":"450-30-05-2","para":"05-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic, in combination with Subtopics <a altsource=\"GUID-6150B9DA-E825-4089-9DE1-CFF705A602B6.ditamap\" class=\"ditamap\">450-10</a> and <a altsource=\"GUID-E13146CA-1337-48D7-BF5C-574604DA8631.ditamap\" class=\"ditamap\">450-20</a>, provides general guidance regarding gain and <a href=\"/glossary/l/#loss-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible loss to an entity that will ultimately be resolved when one or more future events occur or fail to occur. The term loss is used for convenience to include many charges against income that are commonly referred to as expenses and others that are commonly referred to as losses.\"><span>loss contingencies</span></a>. Other Topics include gain or loss contingencies related to those specific Topics. Therefore, the Contingencies Topic does not include all standards related to contingencies. While not intended to be all-inclusive, the following Relationships Sections within the Contingency Subtopics provide links to many Topic-specific contingencies: <ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\">See Section <a altsource=\"GUID-F441826A-E9B7-4618-8CA8-2B698BB0A5DF.ditamap\" class=\"ditamap\">450-10-60</a> for references to other standards related to uncertainties that could result in either a gain or a loss.</div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\">See Section <a altsource=\"GUID-1DDD8F86-F868-4D66-8C17-BBDC08B1D63F.ditamap\" class=\"ditamap\">450-20-60</a> for references to other standards related to uncertainties that could result in a future loss. </div></li><li class=\"li-norm\"><span class=\"linum\">c</span><div class=\"p\">See Section <a altsource=\"GUID-2110170A-1031-4515-8E24-EE95DD64197D.ditamap\" class=\"ditamap\">450-30-60</a> for references to other standards related to uncertainties that could result in a future gain.</div></li></ol></div></div>","snippet":"This Subtopic, in combination with Subtopics 450-10 and 450-20, provides general guidance regarding gain and loss contingencies. Other Topics include gain or loss contingencies related to those specific Topics. Therefore…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:22d27c65410ce39bdf3e68df4c89d3a4f2d00fa1ee4daea4077e32fcd7249468","downloaded_from":"2026-09-10T00:27:52.539Z","last_downloaded_at":"2026-09-10T00:27:52.539Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482947","source_sha256":"b33a7b2b743f2adbbf41278adf361316c59b597f21a28b5771b9a16f81abc7b0"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:37fd04b3c16d984e233330276703f6f7f4b227ff2c2f43061d02564e426f88c7","downloaded_from":"2026-09-10T00:27:52.539Z","last_downloaded_at":"2026-09-10T00:27:52.539Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482947","source_sha256":"b33a7b2b743f2adbbf41278adf361316c59b597f21a28b5771b9a16f81abc7b0"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:826d22e45feed7e4e2e452fab537e2a144bd6d800923ba540a2094608d9ab2bb","downloaded_from":"2026-09-10T00:27:52.539Z","last_downloaded_at":"2026-09-10T00:27:52.539Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482947","source_sha256":"b33a7b2b743f2adbbf41278adf361316c59b597f21a28b5771b9a16f81abc7b0"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"450-30-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section <a altsource=\"GUID-F79C9E66-C38A-4844-8CA8-ED75C2A63A96.ditamap\" class=\"ditamap\">450-10-15</a>.</div></div>","snippet":"This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 450-10-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6c1713c0bc39f249531f3cb29d626dc5d1dbd97f1f9ec57bd412c017e79674c0","downloaded_from":"2026-09-10T00:27:55.964Z","last_downloaded_at":"2026-09-10T00:27:55.964Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482923","source_sha256":"72be0190cf4828e80766e682054d02b3a331ae92ebf7869afbfa06f0edd9905a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9888c0edd63d8e8d01d1a299a09785a664aaabf0c82f31c0208b419c68604cb1","downloaded_from":"2026-09-10T00:27:55.964Z","last_downloaded_at":"2026-09-10T00:27:55.964Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482923","source_sha256":"72be0190cf4828e80766e682054d02b3a331ae92ebf7869afbfa06f0edd9905a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:39029e37411b4b70abe94f45de4a9afb13851c773da0d6b3bf64fb6b979ed45f","downloaded_from":"2026-09-10T00:27:55.964Z","last_downloaded_at":"2026-09-10T00:27:55.964Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482923","source_sha256":"72be0190cf4828e80766e682054d02b3a331ae92ebf7869afbfa06f0edd9905a"}},{"number":"25","label":"25 Recognition","anchor":"25-recognition","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-30-25-1","para":"25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5A3512E7-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A contingency that might result in a gain usually should not be reflected in the financial statements because to do so might be to recognize revenue before its realization. </span></span></div></div>","snippet":"A contingency that might result in a gain usually should not be reflected in the financial statements because to do so might be to recognize revenue before its realization.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c68fdf1f9e1f23467c52af19b461dd44bc7898806ad0dd7ab7da13718e2e2d75","downloaded_from":"2026-09-10T00:28:02.205Z","last_downloaded_at":"2026-09-10T00:28:02.205Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483074","source_sha256":"e00296a5f6ac688b1f92b61a45b90c56f23a9c823159646a4c01098552f1b99d"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7a5a756487b013eb3655a489c7be4fe2cf4d5cd1f330ba88e8478a29c0842a7f","downloaded_from":"2026-09-10T00:28:02.205Z","last_downloaded_at":"2026-09-10T00:28:02.205Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483074","source_sha256":"e00296a5f6ac688b1f92b61a45b90c56f23a9c823159646a4c01098552f1b99d"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4d37f0ca81d467ac67f79eaab9c7ffef1c6c485a60fb86efcc2f2bc6ae2d3a22","downloaded_from":"2026-09-10T00:28:02.205Z","last_downloaded_at":"2026-09-10T00:28:02.205Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483074","source_sha256":"e00296a5f6ac688b1f92b61a45b90c56f23a9c823159646a4c01098552f1b99d"}},{"number":"50","label":"50 Disclosure","anchor":"50-disclosure","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-30-50-1","para":"50-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_5A3DD1D8-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Adequate disclosure shall be made of a contingency that might result in a gain, but care shall be exercised to avoid misleading implications as to the likelihood of realization. </span></span></div></div>","snippet":"Adequate disclosure shall be made of a contingency that might result in a gain, but care shall be exercised to avoid misleading implications as to the likelihood of realization.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:987a2f5cf8f4147a77ddd074431057a32e68c680dcb88f9108c466c518a27d56","downloaded_from":"2026-09-10T00:28:04.439Z","last_downloaded_at":"2026-09-10T00:28:04.439Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483049","source_sha256":"d01603e86bf20ac36ffd5747959b0f336c012b77884474896e76a69f215ebf00"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0f9f46a8e629a8d5e7a4d085b384b9b93e6ca3967508e04f343d3d2cfc13d2e7","downloaded_from":"2026-09-10T00:28:04.439Z","last_downloaded_at":"2026-09-10T00:28:04.439Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483049","source_sha256":"d01603e86bf20ac36ffd5747959b0f336c012b77884474896e76a69f215ebf00"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8fa30498a711add719e50ed3d026ed37463c4ead3e6374a4ef9e03803ac1c84f","downloaded_from":"2026-09-10T00:28:04.439Z","last_downloaded_at":"2026-09-10T00:28:04.439Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483049","source_sha256":"d01603e86bf20ac36ffd5747959b0f336c012b77884474896e76a69f215ebf00"}},{"number":"60","label":"60 Relationships","anchor":"60-relationships","is_sec":false,"groups":[{"block":null,"heading":"Balance Sheet","paragraphs":[{"citation":"450-30-60-1","para":"60-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_5A50A551-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For the determination of whether a receivable resulting from the recognition of a <a href=\"/glossary/g/#gain-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible gain to an entity that will ultimately be resolved when one or more future events occur or fail to occur.\"><span>gain contingency</span></a> may be offset against an existing liability, see Section <a altsource=\"GUID-3855C9FB-56A8-4E2D-B6AF-8012B5941A62.ditamap\" class=\"ditamap\">210-20-45</a>. </span></span> </div> </div>","snippet":"For the determination of whether a receivable resulting from the recognition of a gain contingency may be offset against an existing liability, see Section 210-20-45.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2ad3163944be2f20ba02e2ee8393385294e8dc2ab19546ef34b1adff7a06bde1","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:430a2d0d2dc0319d12d848f09cfb43b9915f77655eec30c3a0cf64d3f2ade127","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}},{"block":null,"heading":"Income Statement","paragraphs":[{"citation":"450-30-60-2","para":"60-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_5A50A679-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For the presentation of business interruption insurance recoveries in the income statement, see Section <a altsource=\"GUID-F7AA5257-1D52-4505-A041-11562996DEEA.ditamap\" class=\"ditamap\">220-30-45</a>. </span></span> </div> </div>","snippet":"For the presentation of business interruption insurance recoveries in the income statement, see Section 220-30-45.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:64f00d96212f301d5df5e8bf18e134bc8b8a12bc7fe6b9505947ece706beb326","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}},{"citation":"450-30-60-3","para":"60-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_5A50A7B0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For disclosure of information about business interruption insurance recoveries, see Section <a altsource=\"GUID-E4599CEC-8BA1-4030-B801-0652A27B8049.ditamap\" class=\"ditamap\">220-30-50</a>. </span></span> </div> </div>","snippet":"For disclosure of information about business interruption insurance recoveries, see Section 220-30-50.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5ad61ca841d5ddcf7c66cdc6172961766e7020ff112ef13d43eea4344e511789","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f36da82f4766faa3d7836e1f3e2998f0684302228c8aff3b415eb97200cb4aee","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}},{"block":null,"heading":"Other Expenses","paragraphs":[{"citation":"450-30-60-4","para":"60-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_5A50A8FA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For recognition of insurance recoveries by an entity insured through a purchased retroactive insurance contract (other than for core insurance operations of an insurance entity), see paragraph <a href=\"/asc/720/20/#720-20-25-3\" class=\"xref\">720-20-25-3</a>. </span></span> </div> </div>","snippet":"For recognition of insurance recoveries by an entity insured through a purchased retroactive insurance contract (other than for core insurance operations of an insurance entity), see paragraph 720-20-25-3.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f9424b9672e2923c07052078988d50a7c20f8c27f34ea619357a3d111bc283e1","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:51c3e74b31f367c4865a39f58b327227ca118c82364b9e4d6aba5ac32a73fc89","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}},{"block":null,"heading":"Leases","paragraphs":[{"citation":"450-30-60-5","para":"60-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_5A50AB3E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For a lessor's accounting for income from <a href=\"/glossary/v/#variable-lease-payments\" class=\"term\" title=\"Payments made by a lessee to a lessor for the right to use an underlying asset that vary because of changes in facts or circumstances occurring after the commencement date, other than the passage of time.\"><span>variable lease payments</span></a>, see paragraphs <a href=\"/asc/842/30/#842-30-25-2\" class=\"xref\">842-30-25-2</a> (for <a href=\"/glossary/s/#sales-type-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets one or more of the criteria in paragraph 842-10-25-2 and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>sales-type leases</span></a>), <a href=\"/asc/842/30/#842-30-25-9\" class=\"xref\">842-30-25-9</a> (for <a href=\"/glossary/d/#direct-financing-lease\" class=\"term\" title=\"From the perspective of a lessor, a lease that meets none of the criteria in paragraph 842-10-25-2 but meets the criteria in paragraph 842-10-25-3(b)and is not an operating lease in accordance with paragraph 842-10-25-3A.\"><span>direct financing leases</span></a>), and <a href=\"/asc/842/30/#842-30-25-11\" class=\"xref\">842-30-25-11</a> (for <a href=\"/glossary/o/#operating-lease\" class=\"term\" title=\"From the perspective of a lessee, any lease other than a finance lease. From the perspective of a lessor, any lease other than a sales-type lease or a direct financing lease.\"><span>operating leases</span></a>). </span></span> </div> </div>","snippet":"For a lessor's accounting for income from variable lease payments, see paragraphs 842-30-25-2 (for sales-type leases), 842-30-25-9 (for direct financing leases), and 842-30-25-11 (for operating leases).","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0a69b834ee73b24f46ad3c33f564e45bbc4bc0489c61e34218607c669c185616","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0ab39997ade187224e3cd72090d29d4ea45b74f347ff75c68d81148c80bbdbe4","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6d9089c89fa28a796e29c3bdef66ebaae530eaa181aa108aa6ce72c19b458b53","downloaded_from":"2026-09-10T00:28:08.097Z","last_downloaded_at":"2026-09-10T00:28:08.097Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147483026","source_sha256":"8742bf22c80ca090055864fb419e92621bd6aabf54f93b3e9051878f2df41f74"}}],"enrichment":{"summary":"ASC 450-30 governs gain contingencies — existing conditions or situations involving uncertainty that may result in a future gain to the entity. The core rule is asymmetric to loss contingencies: a gain contingency usually should not be reflected in the financial statements, because doing so might recognize revenue before it is realized (450-30-25-1). Instead, adequate disclosure is required, worded carefully so as not to imply that realization is more likely than it is (450-30-50-1).","key_points":["A contingency that might result in a gain usually should not be reflected in the financial statements because to do so might be to recognize revenue before its realization (450-30-25-1).","Adequate disclosure shall be made of a gain contingency, but care shall be exercised to avoid misleading implications as to the likelihood of realization (450-30-50-1).","The Subtopic follows the same scope and scope exceptions as the Overall Subtopic in Section 450-10-15 (450-30-15-1).","The Contingencies Topic is not all-inclusive; Topic-specific gain contingencies are cross-referenced in Section 450-30-60, with parallel links for either-gain-or-loss uncertainties in 450-10-60 and loss uncertainties in 450-20-60 (450-30-05-2).","Whether a receivable arising from a recognized gain contingency may be offset against an existing liability is determined under Section 210-20-45 (450-30-60-1).","Business interruption insurance recoveries are presented and disclosed under Sections 220-30-45 and 220-30-50 (450-30-60-2, 450-30-60-3); insurance recoveries under purchased retroactive insurance contracts follow paragraph 720-20-25-3 (450-30-60-4).","A lessor's income from variable lease payments is recognized under paragraphs 842-30-25-2, 842-30-25-9, and 842-30-25-11 (450-30-60-5)."],"categories":["Recognition","Disclosure","Contingencies and guarantees","Presentation"],"audience_level":"introductory","student_note":"Exams love the asymmetry: probable losses are accrued under 450-20, but probable gains are only disclosed — never accrued until realized. The common error is treating a likely litigation win or insurance claim as an accrued receivable, or writing a disclosure that implies recovery is assured.","related_topics":["450-10","450-20","210-20","220-30","720-20","842-30"],"key_concepts":["gain contingency","realization","conservatism asymmetry","adequate disclosure","misleading implications","insurance recoveries","offsetting receivable against liability","variable lease payments"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8280039f69c88fef445cf7136102a3c8a3019ad36d324b98b31033c16d8c4db7","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:28:10.377Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"450-10","title":"Overall","topic_title":"Contingencies","score":0.8515,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3e6dc0a322fb9d943e45413759c89c93d1bff5b6c56bdc7303e97eccb448e9de","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-20","title":"Loss Contingencies","topic_title":"Contingencies","score":0.824,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7a779f5acc851b6feaf046014d5884ed6bedd41078cc5ca290dba7806f6a03ac","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-958","title":"Not-for-Profit Entities","topic_title":"Contingencies","score":0.7258,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:54458b3febb62f1019a43a2b93bfaa941504901f9b9a84b149fecc69c2f47f3f","downloaded_from":"2026-09-10T00:28:58.769Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-980","title":"Regulated Operations","topic_title":"Contingencies","score":0.7244,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b7101f2199fae44313d3d236420b51ee8ccbe8bd91f6990b4b7daa56e2226876","downloaded_from":"2026-09-10T00:29:15.540Z","last_downloaded_at":"2026-09-10T00:29:23.763Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-954","title":"Health Care Entities","topic_title":"Contingencies","score":0.7102,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bc39f2f148875df9435a516009f49b79897d6beb45e55fb02dd5a5d7ef1d956b","downloaded_from":"2026-09-10T00:28:27.303Z","last_downloaded_at":"2026-09-10T00:28:57.040Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"605-40","title":"Gains and Losses","topic_title":"Revenue Recognition","score":0.6914,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:83d2b3759aff4bba2aeddd329006332135802ab2e253f2c4259b79c8bd94bd2c","downloaded_from":"2026-09-10T00:44:00.264Z","last_downloaded_at":"2026-09-10T00:44:30.985Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"450-20","title":"Loss Contingencies","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5a752b56c6bb0c09c1df5ccac33f45b1956f06a832f48dcd212c627effc55d84","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"450-912","title":"Contractors—Federal Government","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:874f310466e801d520ae285dc12746bb894cf4d2cea8475d286ed95aac6e59c9","downloaded_from":"2026-09-10T00:28:13.837Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2cf765d165bbdcef3057adc296568e6d2dffce35ff9c5fca3363a73d87c8f57c","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:28:10.377Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-912","topic":"450","title":"Contractors—Federal Government","area":"Liabilities","paragraphs":5,"summary":"ASC 450-912 is the contingencies guidance specific to contractors dealing with the U.S. federal government. It addresses contingencies arising when a contract is terminated for the convenience of the government and contingencies related to subcontractor claims under those terminated contracts. The substantive recognition guidance is largely cross-referenced elsewhere—subcontractor claim contingencies are addressed in paragraph 912-20-25-3, and the former recognition paragraph was superseded by ASU 2014-09.","concepts":["termination for convenience","government contracts","subcontractor claims","loss contingency","gain contingency","terminated contract claims","superseded guidance"],"categories":["Contingencies and guarantees","Industry-specific","Recognition","Revenue"],"level":"intermediate","topic_title":"Contingencies","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-912-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" id=\"SL51653166-203231\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/450/912/#450-912-25-1\" class=\"xref\">912-450-25-1</a></td><td class=\"entry\">Superseded</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\n912-450-25-1 | Superseded | Accounting Standards Update No. 2014-09 | 05/28/2014 |","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4046d837f1b48c2279e50297136297cf7de2421f3332b89e8ae5a9d646cc7346","downloaded_from":"2026-09-10T00:28:13.837Z","last_downloaded_at":"2026-09-10T00:28:13.837Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478599","source_sha256":"32ed3473c05ea50b6af24ee183f77c41c10dc1c1fd3c529732615a3c9126c630"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:27d500032d048ce360d73b6655f95d23c0d519243cdfdbc38900a496b9d06a91","downloaded_from":"2026-09-10T00:28:13.837Z","last_downloaded_at":"2026-09-10T00:28:13.837Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478599","source_sha256":"32ed3473c05ea50b6af24ee183f77c41c10dc1c1fd3c529732615a3c9126c630"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b8b42abd54027795b4c3ecc1813f2674c7382d51679c9988f186b1cdbe0f545a","downloaded_from":"2026-09-10T00:28:13.837Z","last_downloaded_at":"2026-09-10T00:28:13.837Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478599","source_sha256":"32ed3473c05ea50b6af24ee183f77c41c10dc1c1fd3c529732615a3c9126c630"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-912-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic provides guidance to government contractors related to contingencies associated with contracts terminated for the convenience of the government and <a href=\"/glossary/s/#subcontractor-claims\" class=\"term\" title=\"Those obligations of a contractor to a subcontractor that arise from the subcontractor's costs incurred through transactions that were related to a contract terminated but did not result in the transfer of billable materials or services to the contractor before termination.\"><span>subcontractor claims</span></a> under terminated contracts.</div></div>","snippet":"This Subtopic provides guidance to government contractors related to contingencies associated with contracts terminated for the convenience of the government and subcontractor claims under terminated contracts.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ab8eeec8e5b7937b5e30c0c916296394d9b9b9a27a48a51c751a90524bd6d51c","downloaded_from":"2026-09-10T00:28:16.856Z","last_downloaded_at":"2026-09-10T00:28:16.856Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478227","source_sha256":"aa4a7c2ee4e17b9fcb43f99405648eaa913040fd1c302151c21943556ae5f77f"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2e45c7c243ed023fb0a20808a4f1d1513a3993be3babd87779ddd56d58f1ea38","downloaded_from":"2026-09-10T00:28:16.856Z","last_downloaded_at":"2026-09-10T00:28:16.856Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478227","source_sha256":"aa4a7c2ee4e17b9fcb43f99405648eaa913040fd1c302151c21943556ae5f77f"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0e6bc9879f2300669d31c251757594ccf04319f1d674ae3ab315dafef9304cd1","downloaded_from":"2026-09-10T00:28:16.856Z","last_downloaded_at":"2026-09-10T00:28:16.856Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478227","source_sha256":"aa4a7c2ee4e17b9fcb43f99405648eaa913040fd1c302151c21943556ae5f77f"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"450-912-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section <a altsource=\"GUID-EFF9C8BB-54F8-4F3B-8687-D616705EBFFA.ditamap\" class=\"ditamap\">912-10-15</a>.</div></div>","snippet":"This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 912-10-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:34e7a36bd04a1e62ed6efef8f826ac2e766e7ef8ce420f8cf208df636af2a4a3","downloaded_from":"2026-09-10T00:28:19.356Z","last_downloaded_at":"2026-09-10T00:28:19.356Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478470","source_sha256":"d33bd7d7e80811fc5ef3c0ae982f3cb4ef45b1adbc2d50c70b620f59066c4bb0"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5f7d0df50e7b582e4984cdddd9b8960233950feb50394ae786693d8ced44e77b","downloaded_from":"2026-09-10T00:28:19.356Z","last_downloaded_at":"2026-09-10T00:28:19.356Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478470","source_sha256":"d33bd7d7e80811fc5ef3c0ae982f3cb4ef45b1adbc2d50c70b620f59066c4bb0"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7b8baac88c46c5c8e8d47d9baf5ca7eeb292235369bbca835be185cd2ec28359","downloaded_from":"2026-09-10T00:28:19.356Z","last_downloaded_at":"2026-09-10T00:28:19.356Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478470","source_sha256":"d33bd7d7e80811fc5ef3c0ae982f3cb4ef45b1adbc2d50c70b620f59066c4bb0"}},{"number":"25","label":"25 Recognition","anchor":"25-recognition","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-912-25-1","para":"25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Paragraph superseded by Accounting Standards Update No. 2014-09</a>.</div></div>","snippet":"Paragraph superseded by Accounting Standards Update No. 2014-09.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a7b918e08e19ecbeb28c2cf4d131075da2fb2017cdb441fb1e171a362667a60d","downloaded_from":"2026-09-10T00:28:25.535Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477238","source_sha256":"2c731a1ac49120c5f6d89eba0516879bb5095aa78b8f51b9347c1de75f43715e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1eaa634639d9cf1b3917a746387bbe2091d7ff2564b721376a85391cc186ba93","downloaded_from":"2026-09-10T00:28:25.535Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477238","source_sha256":"2c731a1ac49120c5f6d89eba0516879bb5095aa78b8f51b9347c1de75f43715e"}},{"block":null,"heading":"Subcontractor Claims","paragraphs":[{"citation":"450-912-25-2","para":"25-2","html":"<div class=\"asc-body\"><div class=\"norm-text\">For a discussion of <a href=\"/glossary/s/#subcontractor-claims\" class=\"term\" title=\"Those obligations of a contractor to a subcontractor that arise from the subcontractor's costs incurred through transactions that were related to a contract terminated but did not result in the transfer of billable materials or services to the contractor before termination.\"><span>subcontractor claims</span></a> as they relate to contingencies, see paragraph <a href=\"/asc/912/20/#912-20-25-3\" class=\"xref\">912-20-25-3</a>.</div></div>","snippet":"For a discussion of subcontractor claims as they relate to contingencies, see paragraph 912-20-25-3.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8e6d3863481037dd262164d591a048d0637d7b144024700e4979735129f9b116","downloaded_from":"2026-09-10T00:28:25.535Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477238","source_sha256":"2c731a1ac49120c5f6d89eba0516879bb5095aa78b8f51b9347c1de75f43715e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:40c7338e062e7c5b69c1e6cb48f0f1ba64822374b9c3fc08036385f183aeb0de","downloaded_from":"2026-09-10T00:28:25.535Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477238","source_sha256":"2c731a1ac49120c5f6d89eba0516879bb5095aa78b8f51b9347c1de75f43715e"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3d15964b7e463a98ae2d0abe89e341643c6bb78037df4ce7c587b3640a5e0185","downloaded_from":"2026-09-10T00:28:25.535Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477238","source_sha256":"2c731a1ac49120c5f6d89eba0516879bb5095aa78b8f51b9347c1de75f43715e"}}],"enrichment":{"summary":"ASC 450-912 is the contingencies guidance specific to contractors dealing with the U.S. federal government. It addresses contingencies arising when a contract is terminated for the convenience of the government and contingencies related to subcontractor claims under those terminated contracts. The substantive recognition guidance is largely cross-referenced elsewhere—subcontractor claim contingencies are addressed in paragraph 912-20-25-3, and the former recognition paragraph was superseded by ASU 2014-09.","key_points":["The Subtopic covers contingencies of government contractors associated with contracts terminated for the convenience of the government and subcontractor claims under those terminated contracts (450-912-05-1).","Scope follows the Overall Subtopic scope in Section 912-10-15, so it applies to entities with federal government contracts (450-912-15-1).","Paragraph 450-912-25-1, which previously provided recognition guidance, was superseded by Accounting Standards Update No. 2014-09 (the revenue recognition standard).","Subcontractor claims as they relate to contingencies are addressed by cross-reference to paragraph 912-20-25-3 rather than in this Subtopic (450-912-25-2).","Because of the ASU 2014-09 supersession, termination-for-convenience claim amounts are now generally analyzed under the contract-with-customer revenue model rather than as contingent gains under Topic 450."],"categories":["Contingencies and guarantees","Industry-specific","Recognition","Revenue"],"audience_level":"intermediate","student_note":"This is a short, mostly cross-referencing industry subtopic—its practical significance is that ASU 2014-09 gutted its recognition paragraph, pushing termination claims into the Topic 606 revenue model. The common misunderstanding is assuming Topic 450's gain-contingency rules still govern claims on contracts terminated for the government's convenience.","related_topics":["912-10","912-20","912-605","606","450-20","450-30"],"key_concepts":["termination for convenience","government contracts","subcontractor claims","loss contingency","gain contingency","terminated contract claims","superseded guidance"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3be460a8241727c1fc07022dcc7686a0cdfaec415cb2612169de54f82d68801b","downloaded_from":"2026-09-10T00:28:13.837Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"405-912","title":"Contractors—Federal Government","topic_title":"Liabilities","score":0.8038,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d2cd815408c85b15ac7e27695c4195d72bf70330d0a0ab298f4cbd7abb3f190d","downloaded_from":"2026-09-10T00:16:17.263Z","last_downloaded_at":"2026-09-10T00:16:37.609Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"275-912","title":"Contractors—Federal Government","topic_title":"Risks and Uncertainties","score":0.7684,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c6ba5022673343322a43c6c896735bce93e7f53693c6baf9b315b64bc6a2731e","downloaded_from":"2026-09-09T23:22:22.572Z","last_downloaded_at":"2026-09-09T23:22:31.368Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"912-20","title":"Contract Costs","topic_title":"Contractors—Federal Government","score":0.7372,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1fd65e87e6231faee21c1e6bb40778039d661c8588f13ceb3d5d931e282e1b95","downloaded_from":"2026-09-10T02:10:07.952Z","last_downloaded_at":"2026-09-10T02:10:28.388Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"912-10","title":"Overall","topic_title":"Contractors—Federal Government","score":0.7366,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9f4456d27cce8060112a2cf368f00504b66b66238c40f1112ca4d1c17df91283","downloaded_from":"2026-09-10T02:09:56.619Z","last_downloaded_at":"2026-09-10T02:10:05.382Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"220-912","title":"Contractors—Federal Government","topic_title":"Income Statement—Reporting Comprehensive Income","score":0.7101,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b9174df8e0379cf9fec1db15cae0d8634c63476b101cb59d0ff0ea4e36ff653d","downloaded_from":"2026-09-09T23:05:16.949Z","last_downloaded_at":"2026-09-09T23:05:24.159Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-10","title":"Overall","topic_title":"Contingencies","score":0.6954,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8cd5e762689b250ba6b4e993d3bdc032a4ff9946309f02decee51b3d4769abca","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"450-30","title":"Gain Contingencies","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8ee5e4c5fb04964bcaa29de4b3c01be4af2a83290d89406690bb476a1dbf70c6","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:28:10.377Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"450-954","title":"Health Care Entities","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9f94417382ca035dd8c3cdf61955523cc36ac0eb650a03390ecab3c31522b8c7","downloaded_from":"2026-09-10T00:28:27.303Z","last_downloaded_at":"2026-09-10T00:28:57.040Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b4c20571eab6d21dfa83b2df41f512651a8502c39e565376dc5608e55015a423","downloaded_from":"2026-09-10T00:28:13.837Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-954","topic":"450","title":"Health Care Entities","area":"Liabilities","paragraphs":17,"summary":"This subtopic applies Topic 450 loss-contingency principles to health care entities, principally medical malpractice claims, prepaid health care contract losses, and preferred provider \"stop-loss\" guarantees. Malpractice liabilities must be accrued when the incidents giving rise to the claims occur — including losses from incidents probable of having occurred but not yet reported — based on best estimates of ultimate claim costs, and may not be presented net of anticipated insurance recoveries. Losses on prepaid health care contracts are recognized when it is probable that expected future health care and maintenance costs on a group of existing contracts will exceed anticipated future premiums and stop-loss recoveries.","concepts":["medical malpractice claims","incurred but not reported claims","loss contingency accrual","gross presentation of insurance recoveries","insurance receivable","prepaid health care contract losses","risk of adverse deviation","discounting of accrued claims"],"categories":["Contingencies and guarantees","Industry-specific","Recognition","Disclosure"],"level":"intermediate","topic_title":"Contingencies","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-954-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" id=\"SL6250424-165482\"><tr><td class=\"entry\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/glossary/s/#stop-loss-insurance\" class=\"term\" title=\"A contract in which an entity agrees to indemnify providers for certain health care costs incurred by members.\"><span>Stop-Loss Insurance</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2014-06/\" class=\"xref\">Accounting Standards Update No. 2014-06</a></td><td class=\"entry\">03/14/2014</td></tr><tr><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/asc/450/954/#450-954-25-1\" class=\"xref\">954-450-25-1</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-06/\" class=\"xref\">Accounting Standards Update No. 2014-06</a></td><td class=\"entry\">03/14/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/954/#450-954-25-2\" class=\"xref\">954-450-25-2</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2010-24/\" class=\"xref\">Accounting Standards Update No. 2010-24</a></td><td class=\"entry\">08/27/2010</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/954/#450-954-25-3\" class=\"xref\">954-450-25-3</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2012-04/\" class=\"xref\">Accounting Standards Update No. 2012-04</a></td><td class=\"entry\">10/01/2012</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/954/#450-954-25-3\" class=\"xref\">954-450-25-3</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2010-24/\" class=\"xref\">Accounting Standards Update No. 2010-24</a></td><td class=\"entry\">08/27/2010</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/954/#450-954-30-4\" class=\"xref\">954-450-30-4</a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2014-09/\" class=\"xref\">Accounting Standards Update No. 2014-09</a></td><td class=\"entry\">05/28/2014</td></tr><tr><td class=\"entry\"><a href=\"/asc/450/954/#450-954-65-1\" class=\"xref\">954-450-65-1</a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2010-24/\" class=\"xref\">Accounting Standards Update No. 2010-24</a></td><td class=\"entry\">08/27/2010</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n| | | |\nStop-Loss Insurance | Added | Accounting Standards Update No. 2014-06 | 03/14/2014 |\n| |…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:23e4f54fda7d6c42651fbc40bee70628290b43086cdd663a9d322b3711ca4564","downloaded_from":"2026-09-10T00:28:27.303Z","last_downloaded_at":"2026-09-10T00:28:27.303Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478085","source_sha256":"8164e54f8123cdf0498528c161d24a4406c2c5c205c821069a310d1707a46128"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:01e8fb1b4d4b9272f4f8a4d557fc954a4a54bf76461867cb0fd619859ece3ca5","downloaded_from":"2026-09-10T00:28:27.303Z","last_downloaded_at":"2026-09-10T00:28:27.303Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478085","source_sha256":"8164e54f8123cdf0498528c161d24a4406c2c5c205c821069a310d1707a46128"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9c7c00c87f422cd5c94602dd2eaa04247b4667031286d69ad2a98ed2094a7e9d","downloaded_from":"2026-09-10T00:28:27.303Z","last_downloaded_at":"2026-09-10T00:28:27.303Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478085","source_sha256":"8164e54f8123cdf0498528c161d24a4406c2c5c205c821069a310d1707a46128"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-954-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic provides guidance on accounting for contingencies for health care entities within the scope of this Topic.</div></div>","snippet":"This Subtopic provides guidance on accounting for contingencies for health care entities within the scope of this Topic.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2c79dcd7d9e5903fe7f1aa750ac6e8d22c18eec993175663d34fa95f5de9fb8c","downloaded_from":"2026-09-10T00:28:29.279Z","last_downloaded_at":"2026-09-10T00:28:29.279Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478070","source_sha256":"aabf12c02936ee5674c59e3bdbd62e3ea60baf129e9ee8777d68adf3c9f2559a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:26fadd2f073c824262984e6e54da05afcbd6bd08c0ecff797a4f95a53c7efa40","downloaded_from":"2026-09-10T00:28:29.279Z","last_downloaded_at":"2026-09-10T00:28:29.279Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478070","source_sha256":"aabf12c02936ee5674c59e3bdbd62e3ea60baf129e9ee8777d68adf3c9f2559a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:abb21a31027b87879ef02c133dd555c5a9108b1ea384cfdafa6368f84c74ab53","downloaded_from":"2026-09-10T00:28:29.279Z","last_downloaded_at":"2026-09-10T00:28:29.279Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478070","source_sha256":"aabf12c02936ee5674c59e3bdbd62e3ea60baf129e9ee8777d68adf3c9f2559a"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"450-954-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section <a altsource=\"GUID-01767497-DC99-41A9-BBB5-8E9F5C2009B6.ditamap\" class=\"ditamap\">954-10-15</a>.</div></div>","snippet":"This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 954-10-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2e1b7ed531e38952de126f2febdedf41265bd163092fbea361db1ee1886b8e0d","downloaded_from":"2026-09-10T00:28:32.964Z","last_downloaded_at":"2026-09-10T00:28:32.964Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477214","source_sha256":"6614988a53f8b8916ffc4394bd3c21835e0db3bdac29f79287498b4b75daeb3c"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7c60500377a5ad1427d091d7eebb2997251ab125ac2621598a257ea1d9f73b21","downloaded_from":"2026-09-10T00:28:32.964Z","last_downloaded_at":"2026-09-10T00:28:32.964Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477214","source_sha256":"6614988a53f8b8916ffc4394bd3c21835e0db3bdac29f79287498b4b75daeb3c"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9533dddb8ac7a2c51791640dd709301051c2671902a1bc079002befd6207c92d","downloaded_from":"2026-09-10T00:28:32.964Z","last_downloaded_at":"2026-09-10T00:28:32.964Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477214","source_sha256":"6614988a53f8b8916ffc4394bd3c21835e0db3bdac29f79287498b4b75daeb3c"}},{"number":"25","label":"25 Recognition","anchor":"25-recognition","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-954-25-1","para":"25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_277A355C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Sometimes health care providers enter preferred provider arrangements with self-insured employers whereby the provider guarantees that the employer's health care cost will not increase over a specified amount or percentage. </span></span> <span class=\"sfragment\" id=\"sfr_277A36CF-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In substance, these providers may have provided aggregate <a href=\"/glossary/s/#stop-loss-insurance\" class=\"term\" title=\"A contract in which an entity agrees to indemnify providers for certain health care costs incurred by members.\"><span>stop-loss insurance</span></a> to the self-insured employer, and a material liability to the provider may exist. </span></span> <span class=\"sfragment\" id=\"sfr_277A3807-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a> provides guidance on accounting for these contingencies. </span></span> </div> </div>","snippet":"Sometimes health care providers enter preferred provider arrangements with self-insured employers whereby the provider guarantees that the employer's health care cost will not increase over a specified amount or percenta…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5eafd11626b74965d2e8c0e6a84df5a203c08cc0faf44ced5ad690c1f08980e2","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7b1b5a69e357a23af1fc7f118b79e1d4708141127bfae3f8bcad6994d8366f82","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}},{"block":null,"heading":"Medical Malpractice Claims","paragraphs":[{"citation":"450-954-25-2","para":"25-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_277A399E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The ultimate costs of malpractice claims or similar contingent liabilities, which include costs associated with litigating or settling claims, shall be accrued when the incidents that give rise to the claims occur. </span></span> <span class=\"sfragment\" id=\"sfr_277A3AF4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A health care entity shall evaluate its exposure to losses arising from claims and recognize a liability, if appropriate. </span></span> <span class=\"sfragment\" id=\"sfr_277A3C78-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The liability shall not be presented net of anticipated insurance recoveries. An entity that is indemnified for these liabilities shall recognize an insurance receivable at the same time that it recognizes the liability, measured on the same basis as the liability, subject to the need for a valuation allowance for uncollectible amounts. The provisions in Section <a altsource=\"GUID-89F33CEA-52AF-415C-93CF-C0D04D29905E.ditamap\" class=\"ditamap\">720-20-25</a> and </span></span> <span class=\"sfragment\" id=\"sfr_277A3DF0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Subtopic <a altsource=\"GUID-DE23C1D2-8518-4C4F-B092-B41011D05673.ditamap\" class=\"ditamap\">944-40</a> discusses accounting for insurance claims costs, including estimates of costs relating to incurred-but-not-reported claims. </span></span> <span class=\"sfragment\" id=\"sfr_277A3FA4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Subtopic <a altsource=\"GUID-E13146CA-1337-48D7-BF5C-574604DA8631.ditamap\" class=\"ditamap\">450-20</a> discusses the accounting for loss contingencies.</span></span> </div> </div>","snippet":"The ultimate costs of malpractice claims or similar contingent liabilities, which include costs associated with litigating or settling claims, shall be accrued when the incidents that give rise to the claims occur. A hea…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3eef7a77ef3f5f0df792bdcff3a8328891fa40b3e4ebca822bd68e6d89d65155","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}},{"citation":"450-954-25-2A","para":"25-2A","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_277A40DC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Pursuant to paragraph <a href=\"/asc/720/954/#720-954-25-3\" class=\"xref\">954-720-25-3</a>, an accrual for malpractice losses shall be based on estimated ultimate losses and costs associated with settling claims. </span></span> <span class=\"sfragment\" id=\"sfr_277A4285-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Accruals shall not be based on recommended funding amounts, which in addition to a provision for the actuarially determined liability also includes a provision for both of the following: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_277A43D4-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Credit for investment income </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_277A4561-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A margin for risk of adverse deviation. </span></span> </div> </li> </ol> </div> </div>","snippet":"Pursuant to paragraph 954-720-25-3, an accrual for malpractice losses shall be based on estimated ultimate losses and costs associated with settling claims. Accruals shall not be based on recommended funding amounts, whi…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ff12aa86a4cfa70fa808afef4f270604a34897b3c3f042703a2fb988f3174b6c","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}},{"citation":"450-954-25-2B","para":"25-2B","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_277A4738-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The following are examples of factors to consider and adjustments that may be required to convert actuarially determined malpractice funding amounts to an appropriate loss accrual to be reported in the financial statements: </span></span> <ol class=\"ol-norm\"> <li class=\"li-norm\"><span class=\"linum\">a</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_277A49E2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The risk of adverse deviation is an additional cost factor applied to bring a funding requirement to a selected confidence level. </span></span> <span class=\"sfragment\" id=\"sfr_277A4BA9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This factor does not meet the criteria for recognition as a liability in accordance with Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a>. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">b</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_277A4D7E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An evaluation shall be made of the extent and validity of industry data when the credibility factor actuarial technique is used. </span></span> <span class=\"sfragment\" id=\"sfr_277A4F45-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The lower the credibility factor, the greater the blending of industry data. </span></span> <span class=\"sfragment\" id=\"sfr_277A512C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">This may create an unacceptable level of industry data at lower confidence levels. </span></span> <span class=\"sfragment\" id=\"sfr_277A52EC-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Further, a low credibility factor may indicate that provider-specific data is not sufficient to support the claims liability estimation process. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">c</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_277A54BB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A review of the discounting approach used is necessary to develop the required disclosure. </span></span> <span class=\"sfragment\" id=\"sfr_277A5677-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The impact on the discounting calculation of any other adjustment made to the actuarially determined amounts (such as risk of adverse deviation or the credibility of the risk management system) has to be evaluated. </span></span> </div> </li> <li class=\"li-norm\"><span class=\"linum\">d</span> <div class=\"p\"> <span class=\"sfragment\" id=\"sfr_277A583A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A review of the expenses included in the loss estimation process shall be made. </span></span> <span class=\"sfragment\" id=\"sfr_277A59FA-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Such expenses include the expense of settlement and litigation (that is, allocated loss adjustment expenses). </span></span> </div> </li> </ol> </div> </div>","snippet":"The following are examples of factors to consider and adjustments that may be required to convert actuarially determined malpractice funding amounts to an appropriate loss accrual to be reported in the financial statemen…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:db4f534f1e87dacb693d4dec433de77637e3cb53205dac69dfe320c5df797921","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f0c342f0c583fce9ceb2d691e534fe22b26b71f492d183eb62f12537372a94b7","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}},{"block":null,"heading":"Medical Malpractice Trust Funds","paragraphs":[{"citation":"450-954-25-3","para":"25-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_277A5BF7-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Estimated losses from asserted and unasserted claims shall be accrued and reported, as indicated in paragraphs <div class=\"xref-range displayInline\"><a href=\"/asc/450/954/#450-954-30-1\" class=\"xref\">954-450-30-1 through 30-2</a></div>. </span></span> <span class=\"sfragment\" id=\"sfr_277A5D92-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The estimated losses are not based on payments to the trust fund. </span></span> <span class=\"sfragment\" id=\"sfr_277A5F58-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See paragraph <a href=\"/asc/720/954/#720-954-25-5\" class=\"xref\">954-720-25-5</a> for guidance concerning an entity that participates in a common trust fund and forfeits its rights to any excess funding. </span></span> <span class=\"sfragment\" id=\"sfr_277A6133-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">See also paragraph <a href=\"/asc/810/954/#810-954-45-4\" class=\"xref\">954-810-45-4</a>. </span></span> </div> </div>","snippet":"Estimated losses from asserted and unasserted claims shall be accrued and reported, as indicated in paragraphs 954-450-30-1 through 30-2. The estimated losses are not based on payments to the trust fund. See paragraph 95…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e2b28ac7ee52398675c4aa2abf3de346ae61256d56310f5e89583957b1a96150","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d34d804622b36075b697343fbe4f8ed398a301e6c6262360e7e83868e4c918ec","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}},{"block":null,"heading":"Prepaid Health Care Services","paragraphs":[{"citation":"450-954-25-4","para":"25-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"> <span class=\"sfragment\" id=\"sfr_277A630F-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A prepaid health care provider enters into contracts to provide members with specified health care services for specified periods in return for fixed periodic premiums. </span></span> <span class=\"sfragment\" id=\"sfr_277A64B8-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The premium revenue is expected to cover health care costs and other costs over the terms of the contracts. </span></span> <span class=\"sfragment\" id=\"sfr_277A6667-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Only in unusual circumstances would a provider be able to increase premiums on contracts in force to cover expected losses. </span></span> <span class=\"sfragment\" id=\"sfr_277A682A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A provider may be able to control or reduce future health care delivery costs to avoid anticipated losses, but the ability to avoid losses under existing contracts may be difficult to measure or to demonstrate. </span></span> <span class=\"sfragment\" id=\"sfr_277A6A07-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Associated entities such as hospitals, medical groups, and individual practice associations may enter into similar contracts with prepaid health care providers in which they agree to deliver identified health care services to the providers' members for specified periods in return for fixed fees. </span></span> </div> </div>","snippet":"A prepaid health care provider enters into contracts to provide members with specified health care services for specified periods in return for fixed periodic premiums. The premium revenue is expected to cover health car…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f1ce944ccad6d855050e4b63d69ca25053f5ad0bfcb3cb2d04c7df6b85e4bc7f","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:27208b9c75404998c367c8d63e29945ad3fb03588af19b17eefe8afd55362311","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:75d25c72b7224eb398d7ad4aa83c70eaba12586eb0fde5086fe7e86acf193bbd","downloaded_from":"2026-09-10T00:28:39.369Z","last_downloaded_at":"2026-09-10T00:28:39.369Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477527","source_sha256":"80700a570e899b8991551c069bcb17dcf1d7b8808eb1976061cefdbb675660cc"}},{"number":"30","label":"30 Initial Measurement","anchor":"30-initial-measurement","is_sec":false,"groups":[{"block":null,"heading":"Medical Malpractice Claims","paragraphs":[{"citation":"450-954-30-1","para":"30-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_27930315-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Estimated losses from asserted and unasserted medical malpractice claims shall be accrued either individually or on a group basis, based on the best estimates of the ultimate costs of the claims and the relationship of past reported incidents to eventual claims payments. </span></span><span class=\"sfragment\" id=\"sfr_279304B2-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">All relevant information, including industry experience, the entity's own historical experience, the entity's existing asserted claims, and reported incidents, shall be used in estimating the expected amount of claims. </span></span><span class=\"sfragment\" id=\"sfr_279305C9-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The accrual includes an estimate of the losses that will result from unreported incidents, which are probable of having occurred before the end of the reporting period. </span></span></div></div>","snippet":"Estimated losses from asserted and unasserted medical malpractice claims shall be accrued either individually or on a group basis, based on the best estimates of the ultimate costs of the claims and the relationship of p…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a9359d88adaf330a31002a1d1bd75ae59b2dd6bb93ffe9de3c398350d619c8ea","downloaded_from":"2026-09-10T00:28:42.400Z","last_downloaded_at":"2026-09-10T00:28:42.400Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478201","source_sha256":"08020a9515c39ebe99a3fed7abd509a40e40b9a1c0a18ab219fab67c3772291c"}},{"citation":"450-954-30-2","para":"30-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_279306DD-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In estimating the probability that unreported incidents have occurred, some health care entities may develop a range of possible estimates of the number of unreported incidents, including zero. </span></span><span class=\"sfragment\" id=\"sfr_27930818-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">However, the greater the volume of a health care entity's operations, the greater the likelihood that the entity's minimum estimate of the number of probable unreported incidents will be greater than zero. </span></span><span class=\"sfragment\" id=\"sfr_2793091B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In estimating losses from malpractice claims, a health care entity may need to modify data drawn from industry experience so it is relevant to developing an estimate that is specific to the entity. </span></span><span class=\"sfragment\" id=\"sfr_27930A1B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Various factors (such as the nature of operations, size, and the provider's past experience) shall be considered in assessing comparability. </span></span><span class=\"sfragment\" id=\"sfr_27930B59-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Further, industry data that are not current may not be relevant. </span></span></div></div>","snippet":"In estimating the probability that unreported incidents have occurred, some health care entities may develop a range of possible estimates of the number of unreported incidents, including zero. However, the greater the v…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:388cca4f1f4849dc1fa7ddba3da95973414a67d4459426349701b8aae32ad630","downloaded_from":"2026-09-10T00:28:42.400Z","last_downloaded_at":"2026-09-10T00:28:42.400Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478201","source_sha256":"08020a9515c39ebe99a3fed7abd509a40e40b9a1c0a18ab219fab67c3772291c"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:44543bf171fc1bb015fb9922fb1702474b95ec4279defc5f4dcb88d854a8d7d9","downloaded_from":"2026-09-10T00:28:42.400Z","last_downloaded_at":"2026-09-10T00:28:42.400Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478201","source_sha256":"08020a9515c39ebe99a3fed7abd509a40e40b9a1c0a18ab219fab67c3772291c"}},{"block":null,"heading":"Prepaid Health Care Services","paragraphs":[{"citation":"450-954-30-3","para":"30-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_27930C95-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The estimated future health care costs and maintenance costs to be considered in determining whether a loss has been incurred shall include fixed and variable, direct and allocable indirect costs. </span></span></div></div>","snippet":"The estimated future health care costs and maintenance costs to be considered in determining whether a loss has been incurred shall include fixed and variable, direct and allocable indirect costs.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6d8f1930ea3a55ddd19c697745c3953331fb4a9fcd2e56a150a430d60e9e9862","downloaded_from":"2026-09-10T00:28:42.400Z","last_downloaded_at":"2026-09-10T00:28:42.400Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478201","source_sha256":"08020a9515c39ebe99a3fed7abd509a40e40b9a1c0a18ab219fab67c3772291c"}},{"citation":"450-954-30-4","para":"30-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_27930DA6-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Losses under <a href=\"/glossary/p/#prepaid-health-care-services\" class=\"term\" title=\"Any form of health care service provided to a member in exchange for a scheduled payment (or payments) established before care is provided, regardless of the level of service subsequently provided.\"><span>prepaid health care services</span></a> contracts shall be recognized when it is probable that expected future health care costs and maintenance costs under a group of existing contracts will exceed anticipated future premiums and stop-loss insurance recoveries on those contracts. </span></span><span class=\"sfragment\" id=\"sfr_27930EA0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">To determine the need to recognize a loss, contracts shall be grouped in a manner consistent with the provider's method of establishing premium rates, for example, by community rating practices, geographical area, or statutory requirements, to determine whether a loss has been incurred. </span></span></div></div>","snippet":"Losses under prepaid health care services contracts shall be recognized when it is probable that expected future health care costs and maintenance costs under a group of existing contracts will exceed anticipated future …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4d6fd651c5533d7c4bc19367919b59f539bc3b7740ac289b0dd0636aee7dbbe3","downloaded_from":"2026-09-10T00:28:42.400Z","last_downloaded_at":"2026-09-10T00:28:42.400Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478201","source_sha256":"08020a9515c39ebe99a3fed7abd509a40e40b9a1c0a18ab219fab67c3772291c"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0b39175a4dc6f8d819665c99dc21c12967ddf90bb85abd2e8abd69efefa40983","downloaded_from":"2026-09-10T00:28:42.400Z","last_downloaded_at":"2026-09-10T00:28:42.400Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478201","source_sha256":"08020a9515c39ebe99a3fed7abd509a40e40b9a1c0a18ab219fab67c3772291c"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ef9d07bbbdd360e1bf0d3f3b69390df851fd46cf6fa5e4590eba49eb6e6587ab","downloaded_from":"2026-09-10T00:28:42.400Z","last_downloaded_at":"2026-09-10T00:28:42.400Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478201","source_sha256":"08020a9515c39ebe99a3fed7abd509a40e40b9a1c0a18ab219fab67c3772291c"}},{"number":"35","label":"35 Subsequent Measurement","anchor":"35-subsequent-measurement","is_sec":false,"groups":[{"block":null,"heading":"Medical Malpractice Claims","paragraphs":[{"citation":"450-954-35-1","para":"35-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_279C933C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Estimated losses are reviewed and changed, if necessary, at each reporting date. The amounts of the changes are recognized currently as additional expense or as a reduction of expense. </span></span></div></div>","snippet":"Estimated losses are reviewed and changed, if necessary, at each reporting date. The amounts of the changes are recognized currently as additional expense or as a reduction of expense.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f6faaaea0562204a8e60f514da732b0d109458e00a11a0b1c0c6495c32f7a707","downloaded_from":"2026-09-10T00:28:45.873Z","last_downloaded_at":"2026-09-10T00:28:45.873Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477284","source_sha256":"8bb7d792d9dc106cb6588ed210f1c743caf3e8384cf7b759faa79d630482af2f"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3cff7c05ea903862b30286b2119f01339cf5e202fc8be03c836e85a2101d9adf","downloaded_from":"2026-09-10T00:28:45.873Z","last_downloaded_at":"2026-09-10T00:28:45.873Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477284","source_sha256":"8bb7d792d9dc106cb6588ed210f1c743caf3e8384cf7b759faa79d630482af2f"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b2e4c6e4818b469172896e281cb2bbc756a2ad85c0463b11f960e394aebcda2c","downloaded_from":"2026-09-10T00:28:45.873Z","last_downloaded_at":"2026-09-10T00:28:45.873Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477284","source_sha256":"8bb7d792d9dc106cb6588ed210f1c743caf3e8384cf7b759faa79d630482af2f"}},{"number":"50","label":"50 Disclosure","anchor":"50-disclosure","is_sec":false,"groups":[{"block":null,"heading":"Medical Malpractice Insurance","paragraphs":[{"citation":"450-954-50-1","para":"50-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_27A6E50A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Health care entities shall disclose their program of medical malpractice insurance coverages. </span></span></div></div>","snippet":"Health care entities shall disclose their program of medical malpractice insurance coverages.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:931aea4e508cb28f6ff2a8640fffc8b0ade609ccd6e38d6d9e8cbc7c6e5cb242","downloaded_from":"2026-09-10T00:28:49.716Z","last_downloaded_at":"2026-09-10T00:28:49.716Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477850","source_sha256":"37b93f70a201d28d5e232ceb6852fbbaeb580c1d43816f9f3c19fb79fd1b793f"}},{"citation":"450-954-50-2","para":"50-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_27A6E6A0-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Health care entities that discount accrued malpractice claims shall disclose in the notes to the financial statements the carrying amount of accrued malpractice claims that are discounted in the financial statements and the interest rate or rates used to discount those claims. </span></span></div></div>","snippet":"Health care entities that discount accrued malpractice claims shall disclose in the notes to the financial statements the carrying amount of accrued malpractice claims that are discounted in the financial statements and …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c861759e0996a8c6f95fdff89c4c157bd8bc3c3e95c1fa07028540e230853190","downloaded_from":"2026-09-10T00:28:49.716Z","last_downloaded_at":"2026-09-10T00:28:49.716Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477850","source_sha256":"37b93f70a201d28d5e232ceb6852fbbaeb580c1d43816f9f3c19fb79fd1b793f"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:115efc00475704cdb35c5364dca0b877a47af24d49fa49206813e05ac5257849","downloaded_from":"2026-09-10T00:28:49.716Z","last_downloaded_at":"2026-09-10T00:28:49.716Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477850","source_sha256":"37b93f70a201d28d5e232ceb6852fbbaeb580c1d43816f9f3c19fb79fd1b793f"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fd679d972e6c1d01f151f16770605332faa14dee5059d0307c61bfb3b849cb8c","downloaded_from":"2026-09-10T00:28:49.716Z","last_downloaded_at":"2026-09-10T00:28:49.716Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477850","source_sha256":"37b93f70a201d28d5e232ceb6852fbbaeb580c1d43816f9f3c19fb79fd1b793f"}},{"number":"65","label":"65 Transition and Open Effective Date Information","anchor":"65-transition-and-open-effective-date-information","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-954-65-1","para":"65-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_27B11391-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraph superseded on 06/18/2012 after the end of the transition period stated in Accounting Standards Update No. 2010-24, <em class=\"ph i\">Health Care Entities (Topic 954): Presentation of Insurance Claims and Related Insurance Recoveries</em>.</span></span></div></div>","snippet":"Paragraph superseded on 06/18/2012 after the end of the transition period stated in Accounting Standards Update No. 2010-24, Health Care Entities (Topic 954): Presentation of Insurance Claims and Related Insurance Recove…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1e52ca92c334969069c2215d4c4c1a3a917b178dac789d4f3b91091435742a5b","downloaded_from":"2026-09-10T00:28:53.753Z","last_downloaded_at":"2026-09-10T00:28:53.753Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478729","source_sha256":"eebd03e6fca419dff6d60d842eb1931eb734b13e15b81fd2f5ccdb3f5f63c590"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:402b76a5313c19cea0786007bb8b76744c4f4c91222d01c463ba82104c743436","downloaded_from":"2026-09-10T00:28:53.753Z","last_downloaded_at":"2026-09-10T00:28:53.753Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478729","source_sha256":"eebd03e6fca419dff6d60d842eb1931eb734b13e15b81fd2f5ccdb3f5f63c590"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f680f3d8cfa9dc6652b216d621188213127ee8db20ecacd2ee257fab38892c2d","downloaded_from":"2026-09-10T00:28:53.753Z","last_downloaded_at":"2026-09-10T00:28:53.753Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478729","source_sha256":"eebd03e6fca419dff6d60d842eb1931eb734b13e15b81fd2f5ccdb3f5f63c590"}}],"enrichment":{"summary":"This subtopic applies Topic 450 loss-contingency principles to health care entities, principally medical malpractice claims, prepaid health care contract losses, and preferred provider \"stop-loss\" guarantees. Malpractice liabilities must be accrued when the incidents giving rise to the claims occur — including losses from incidents probable of having occurred but not yet reported — based on best estimates of ultimate claim costs, and may not be presented net of anticipated insurance recoveries. Losses on prepaid health care contracts are recognized when it is probable that expected future health care and maintenance costs on a group of existing contracts will exceed anticipated future premiums and stop-loss recoveries.","key_points":["Ultimate costs of malpractice claims and similar contingent liabilities, including litigation and settlement costs, are accrued when the incidents giving rise to the claims occur (450-954-25-2).","A malpractice liability shall not be presented net of anticipated insurance recoveries; an indemnified entity recognizes an insurance receivable at the same time and on the same basis as the liability, subject to a valuation allowance for uncollectible amounts (450-954-25-2).","Accruals are based on estimated ultimate losses and settlement costs, not on recommended funding amounts, which improperly include credit for investment income and a margin for risk of adverse deviation (450-954-25-2A); the adverse-deviation factor does not meet the Topic 450 liability recognition criteria (450-954-25-2B(a)).","Estimated losses from asserted and unasserted claims are accrued individually or on a group basis using all relevant information — industry experience, the entity's own historical experience, existing asserted claims, and reported incidents — and include losses from unreported incidents probable of having occurred before period end (450-954-30-1); estimates are not based on payments to a trust fund (450-954-25-3).","The greater the volume of operations, the greater the likelihood that the minimum estimate of probable unreported incidents exceeds zero, and industry data must be adjusted for comparability and currency (450-954-30-2).","Losses under prepaid health care services contracts are recognized when it is probable that expected future health care and maintenance costs (fixed and variable, direct and allocable indirect) under a group of existing contracts will exceed anticipated future premiums and stop-loss insurance recoveries, with contracts grouped consistently with the provider's premium-rating method (450-954-30-3 through 30-4).","Estimated losses are reviewed and changed at each reporting date, with changes recognized currently as additional expense or a reduction of expense (450-954-35-1); entities must disclose their malpractice insurance program and, if claims are discounted, the discounted carrying amount and the interest rate(s) used (450-954-50-1 through 50-2)."],"categories":["Contingencies and guarantees","Industry-specific","Recognition","Disclosure"],"audience_level":"intermediate","student_note":"The classic trap is netting: a health care entity must gross up the malpractice liability and record a separate insurance receivable, never report the liability net of expected recoveries, and must accrue for incurred-but-not-reported incidents rather than only asserted claims. A second trap is confusing an actuary's recommended funding amount (which builds in investment income credit and a risk margin) with the GAAP loss accrual.","related_topics":["450-20","954-450","954-720","944-40","720-20","954-810"],"key_concepts":["medical malpractice claims","incurred but not reported claims","loss contingency accrual","gross presentation of insurance recoveries","insurance receivable","prepaid health care contract losses","risk of adverse deviation","discounting of accrued claims"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:907ef4d97a15bdf37cc25ad376598c1ec8da1971a85e70edd99a860cb94c7e31","downloaded_from":"2026-09-10T00:28:27.303Z","last_downloaded_at":"2026-09-10T00:28:57.040Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"720-954","title":"Health Care Entities","topic_title":"Other Expenses","score":0.8654,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:5a0489cdcbb8ebf3a86ea134bbdee420cc53c2c25ee8911ac410b8aec113bab4","downloaded_from":"2026-09-10T01:12:28.117Z","last_downloaded_at":"2026-09-10T01:12:54.691Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"405-954","title":"Health Care Entities","topic_title":"Liabilities","score":0.8434,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:01ef7839b0e530ca36a7744586fad4134b677fbd52448ebafe531f314e9b28ef","downloaded_from":"2026-09-10T00:19:21.041Z","last_downloaded_at":"2026-09-10T00:19:37.991Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-20","title":"Loss Contingencies","topic_title":"Contingencies","score":0.7905,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:6f8dcc7f608d3f31945cb6caf873e26b8e56dcd72cc6dfaf4cadec35ea20bf8d","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"310-954","title":"Health Care Entities","topic_title":"Receivables","score":0.7457,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4185e50f5645a8a318cd703c7b0c2a1c3c8ed3961cfde2f4ca7c9d1d2a4fb702","downloaded_from":"2026-09-09T23:31:29.416Z","last_downloaded_at":"2026-09-09T23:32:00.586Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-10","title":"Overall","topic_title":"Contingencies","score":0.7329,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:56887ee6aebb318eecd4b3868a1ecf15c1354125559f0054a35eb60b190697a0","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"944-60","title":"Premium Deficiency and Loss Recognition","topic_title":"Financial Services—Insurance","score":0.7189,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:35ce73d94d9f17f07d09eeb51e7b34c7019e20e6d41532e19bd2138a0e34a5a9","downloaded_from":"2026-09-10T02:17:42.336Z","last_downloaded_at":"2026-09-10T02:18:05.734Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"450-912","title":"Contractors—Federal Government","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:874f310466e801d520ae285dc12746bb894cf4d2cea8475d286ed95aac6e59c9","downloaded_from":"2026-09-10T00:28:13.837Z","last_downloaded_at":"2026-09-10T00:28:25.535Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"450-958","title":"Not-for-Profit Entities","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bd53ac8021a51fd4e33effcfaba3a8b857ef1900443f21b208718aa74ed2065f","downloaded_from":"2026-09-10T00:28:58.769Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:7484ad054d89645883db95fc36fd32a844e4f2461a6a4e844835e44eee586e28","downloaded_from":"2026-09-10T00:28:27.303Z","last_downloaded_at":"2026-09-10T00:28:57.040Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-958","topic":"450","title":"Not-for-Profit Entities","area":"Liabilities","paragraphs":7,"summary":"This Subtopic applies the general loss contingency model of Topic 450 to not-for-profit entities. It identifies two NFP-specific triggers — noncompliance with donor-imposed restrictions on contributed assets and problems with (or absence of a determination letter for) tax-exempt status — that may require accrual of a loss contingency under Subtopic 450-20 and disclosure under Section 450-20-50.","concepts":["loss contingency","donor-imposed restrictions","tax-exempt status","determination letter","reasonable possibility","going concern","composition of assets","accrual of liability"],"categories":["Contingencies and guarantees","Not-for-profit","Recognition","Disclosure"],"level":"intermediate","topic_title":"Contingencies","sections":[{"number":"00","label":"00 Status","anchor":"00-status","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-958-00-1","para":"00-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">The following table identifies the changes made to this Subtopic.</div><div class=\"norm-text\"><table class=\"asc-table\" id=\"SL6269126-165547\"><tr><td class=\"entry text-align-center\" colspan=\"1\"><strong class=\"ph b\">Paragraph</strong></td><td class=\"entry\"><strong class=\"ph b\">Action</strong></td><td class=\"entry\"><strong class=\"ph b\">Accounting Standards Update</strong></td><td class=\"entry\"><strong class=\"ph b\">Date</strong></td></tr><tr><td class=\"entry\"></td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#conditional-contribution\" class=\"term\" title=\"A contribution that contains a donor-imposed condition.\"><span>Conditional Contribution</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2018-08/\" class=\"xref\">Accounting Standards Update No. 2018-08</a></td><td class=\"entry\">06/21/2018</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#contribution\" class=\"term\" title=\"An unconditional transfer of cash or other assets, as well as unconditional promises to give, to an entity or a reduction, settlement, or cancellation of its liabilities in a voluntary nonreciprocal transfer by another entity acting other than as an owner. Those characteristics distinguish contributions from:Exchange transactions, which are reciprocal transfers in which each party receives and sacrifices approximately commensurate valueInvestments by owners and distributions to owners, which are nonreciprocal transfers between an entity and its ownersOther nonreciprocal transfers, such as impositions of taxes or legal judgments, fines, and thefts, which are not voluntary transfers. In a contribution transaction, the resource provider often receives value indirectly by providing a societal benefit although that benefit is not considered to be of commensurate value. In an exchange transaction, the potential public benefits are secondary to the potential direct benefits to the resource provider. The term contribution revenue is used to apply to transactions that are part of the entity's ongoing major or central activities (revenues), or are peripheral or incidental to the entity (gains). See also Inherent Contribution and Conditional Contribution.\"><span>Contribution</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2018-08/\" class=\"xref\">Accounting Standards Update No. 2018-08</a></td><td class=\"entry\">06/21/2018</td></tr><tr><td class=\"entry\"><a href=\"/glossary/c/#contribution\" class=\"term\" title=\"An unconditional transfer of cash or other assets, as well as unconditional promises to give, to an entity or a reduction, settlement, or cancellation of its liabilities in a voluntary nonreciprocal transfer by another entity acting other than as an owner. Those characteristics distinguish contributions from:Exchange transactions, which are reciprocal transfers in which each party receives and sacrifices approximately commensurate valueInvestments by owners and distributions to owners, which are nonreciprocal transfers between an entity and its ownersOther nonreciprocal transfers, such as impositions of taxes or legal judgments, fines, and thefts, which are not voluntary transfers. In a contribution transaction, the resource provider often receives value indirectly by providing a societal benefit although that benefit is not considered to be of commensurate value. In an exchange transaction, the potential public benefits are secondary to the potential direct benefits to the resource provider. The term contribution revenue is used to apply to transactions that are part of the entity's ongoing major or central activities (revenues), or are peripheral or incidental to the entity (gains). See also Inherent Contribution and Conditional Contribution.\"><span>Contribution</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2010-07/\" class=\"xref\">Accounting Standards Update No. 2010-07</a></td><td class=\"entry\">01/28/2010</td></tr><tr><td class=\"entry\"><a href=\"/glossary/d/#donor-imposed-condition\" class=\"term\" title=\"A donor stipulation (donors include other types of contributors, including makers of certain grants) that represents a barrier that must be overcome before the recipient is entitled to the assets transferred or promised. Failure to overcome the barrier gives the contributor a right of return of the assets it has transferred or gives the promisor a right of release from its obligation to transfer its assets.\"><span>Donor-Imposed Condition</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2018-08/\" class=\"xref\">Accounting Standards Update No. 2018-08</a></td><td class=\"entry\">06/21/2018</td></tr><tr><td class=\"entry\"><a href=\"/glossary/d/#donor-imposed-restriction\" class=\"term\" title=\"A donor stipulation (donors include other types of contributors, including makers of certain grants) that specifies a use for a contributed asset that is more specific than broad limits resulting from the following: The nature of the not-for-profit entity (NFP) The environment in which it operates The purposes specified in its articles of incorporation or bylaws or comparable documents for an unincorporated association. Some donors impose restrictions that are temporary in nature, for example, stipulating that resources be used after a specified date, for particular programs or services, or to acquire buildings or equipment. Other donors impose restrictions that are perpetual in nature, for example, stipulating that resources be maintained in perpetuity. Laws may extend those limits to investment returns from those resources and to other enhancements (diminishments) of those resources. Thus, those laws extend donor-imposed restrictions.\"><span>Donor-Imposed Restriction</span></a></td><td class=\"entry\">Amended</td><td class=\"entry\"><a href=\"/updates/asu-2016-14/\" class=\"xref\">Accounting Standards Update No. 2016-14</a></td><td class=\"entry\">08/18/2016</td></tr><tr><td class=\"entry\"><a href=\"/glossary/p/#promise-to-give\" class=\"term\" title=\"A written or oral agreement to contribute cash or other assets to another entity. A promise carries rights and obligations—the recipient of a promise to give has a right to expect that the promised assets will be transferred in the future, and the maker has a social and moral obligation, and generally a legal obligation, to make the promised transfer. A promise to give may be either conditional or unconditional.\"><span>Promise to Give</span></a></td><td class=\"entry\">Added</td><td class=\"entry\"><a href=\"/updates/asu-2018-08/\" class=\"xref\">Accounting Standards Update No. 2018-08</a></td><td class=\"entry\">06/21/2018</td></tr></table></div></div>","snippet":"The following table identifies the changes made to this Subtopic.\nParagraph | Action | Accounting Standards Update | Date |\n|\nConditional Contribution | Added | Accounting Standards Update No. 2018-08 | 06/21/2018 |\nCont…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3a98b4fbf2d2e678c3bc722d8dc8b9dfbdd00374946af3ff0f1a2e50002b721c","downloaded_from":"2026-09-10T00:28:58.769Z","last_downloaded_at":"2026-09-10T00:28:58.769Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478674","source_sha256":"057c2ab60f4d1d6d6c0944094a30b9ed8fb9c4304aa0ad8b5b800d54314ec7cc"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:81178911058d234fdc620996d9afa436bfe44b601896bff033ad85ea06c12e05","downloaded_from":"2026-09-10T00:28:58.769Z","last_downloaded_at":"2026-09-10T00:28:58.769Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478674","source_sha256":"057c2ab60f4d1d6d6c0944094a30b9ed8fb9c4304aa0ad8b5b800d54314ec7cc"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:0c7d616ece20ea78915803b44a37b558f298852d65d1af020e5ed06f3ac9040d","downloaded_from":"2026-09-10T00:28:58.769Z","last_downloaded_at":"2026-09-10T00:28:58.769Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478674","source_sha256":"057c2ab60f4d1d6d6c0944094a30b9ed8fb9c4304aa0ad8b5b800d54314ec7cc"}},{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-958-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic provides guidance on contingencies for <a href=\"/glossary/n/#not-for-profit-entity\" class=\"term\" title=\"An entity that possesses the following characteristics, in varying degrees, that distinguish it from a business entity: Contributions of significant amounts of resources from resource providers who do not expect commensurate or proportionate pecuniary return Operating purposes other than to provide goods or services at a profit Absence of ownership interests like those of business entities. Entities that clearly fall outside this definition include the following: All investor-owned entities Entities that provide dividends, lower costs, or other economic benefits directly and proportionately to their owners, members, or participants, such as mutual insurance entities, credit unions, farm and rural electric cooperatives, and employee benefit plans.\"><span>not-for-profit entities</span></a> (NFPs). NFPs also shall comply with the applicable standards in Topic <a altsource=\"GUID-1271E23D-73B8-4EFD-8F2E-276D1D0ECC8F.ditamap\" class=\"ditamap\">450</a>.</div></div>","snippet":"This Subtopic provides guidance on contingencies for not-for-profit entities (NFPs). NFPs also shall comply with the applicable standards in Topic 450.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:05a609256c5d8faf174049a8b2e4f78d443057393b5d06c65f156a125f36077a","downloaded_from":"2026-09-10T00:29:01.058Z","last_downloaded_at":"2026-09-10T00:29:01.058Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478477","source_sha256":"2b82585dc4a677c8c58739c08b858995804d630637e7ba6a4fae66f82d004fac"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f8cfa2d22a9f3048a0f0c917f038eb02cdca2923d92373fe997433d337199d47","downloaded_from":"2026-09-10T00:29:01.058Z","last_downloaded_at":"2026-09-10T00:29:01.058Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478477","source_sha256":"2b82585dc4a677c8c58739c08b858995804d630637e7ba6a4fae66f82d004fac"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:10038204553444074fd6278fadd2edd5e0987378b3b23f0a333d38078ab310fc","downloaded_from":"2026-09-10T00:29:01.058Z","last_downloaded_at":"2026-09-10T00:29:01.058Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478477","source_sha256":"2b82585dc4a677c8c58739c08b858995804d630637e7ba6a4fae66f82d004fac"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"450-958-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section <a altsource=\"GUID-0DD748A2-DAEB-4A20-B494-CB4C774CFCAE.ditamap\" class=\"ditamap\">958-10-15</a>.</div></div>","snippet":"This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 958-10-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4ef4f2f61690d72e1c156aca1b9fd588ff496fae19becbeedd1d012ca68fd581","downloaded_from":"2026-09-10T00:29:02.739Z","last_downloaded_at":"2026-09-10T00:29:02.739Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477374","source_sha256":"d7dd313b986fa9acdcbc2146eb5c676222b78a27ee08ea5d78f2e0920863047a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:be9d74ea76f218168fac6ff9e42354c6c119292033ee8449b18e99a429efadb0","downloaded_from":"2026-09-10T00:29:02.739Z","last_downloaded_at":"2026-09-10T00:29:02.739Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477374","source_sha256":"d7dd313b986fa9acdcbc2146eb5c676222b78a27ee08ea5d78f2e0920863047a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ccc9cce4d83b8e480ba411e624f535f402567066ee1b408d2ccdab4fa35dcb4c","downloaded_from":"2026-09-10T00:29:02.739Z","last_downloaded_at":"2026-09-10T00:29:02.739Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147477374","source_sha256":"d7dd313b986fa9acdcbc2146eb5c676222b78a27ee08ea5d78f2e0920863047a"}},{"number":"25","label":"25 Recognition","anchor":"25-recognition","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-958-25-1","para":"25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_37A55B0D-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In conformity with Subtopic <a altsource=\"GUID-E13146CA-1337-48D7-BF5C-574604DA8631.ditamap\" class=\"ditamap\">450-20</a>, a liability may have to be accrued for <a href=\"/glossary/l/#loss-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible loss to an entity that will ultimately be resolved when one or more future events occur or fail to occur. The term loss is used for convenience to include many charges against income that are commonly referred to as expenses and others that are commonly referred to as losses.\"><span>loss contingencies</span></a>. </span></span><span class=\"sfragment\" id=\"sfr_37A55C70-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\"> Examples of circumstances that may result in such contingencies include the following: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_37A55DBD-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Noncompliance with <a href=\"/glossary/d/#donor-imposed-restriction\" class=\"term\" title=\"A donor stipulation (donors include other types of contributors, including makers of certain grants) that specifies a use for a contributed asset that is more specific than broad limits resulting from the following: The nature of the not-for-profit entity (NFP) The environment in which it operates The purposes specified in its articles of incorporation or bylaws or comparable documents for an unincorporated association. Some donors impose restrictions that are temporary in nature, for example, stipulating that resources be used after a specified date, for particular programs or services, or to acquire buildings or equipment. Other donors impose restrictions that are perpetual in nature, for example, stipulating that resources be maintained in perpetuity. Laws may extend those limits to investment returns from those resources and to other enhancements (diminishments) of those resources. Thus, those laws extend donor-imposed restrictions.\"><span>donor-imposed restrictions</span></a> on contributed assets, </span></span><span class=\"sfragment\" id=\"sfr_37A55F08-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">which, although rare, does occur, sometimes as a result of events occurring subsequent to receiving a <a href=\"/glossary/c/#contribution\" class=\"term\" title=\"An unconditional transfer of cash or other assets, as well as unconditional promises to give, to an entity or a reduction, settlement, or cancellation of its liabilities in a voluntary nonreciprocal transfer by another entity acting other than as an owner. Those characteristics distinguish contributions from:Exchange transactions, which are reciprocal transfers in which each party receives and sacrifices approximately commensurate valueInvestments by owners and distributions to owners, which are nonreciprocal transfers between an entity and its ownersOther nonreciprocal transfers, such as impositions of taxes or legal judgments, fines, and thefts, which are not voluntary transfers. In a contribution transaction, the resource provider often receives value indirectly by providing a societal benefit although that benefit is not considered to be of commensurate value. In an exchange transaction, the potential public benefits are secondary to the potential direct benefits to the resource provider. The term contribution revenue is used to apply to transactions that are part of the entity's ongoing major or central activities (revenues), or are peripheral or incidental to the entity (gains). See also Inherent Contribution and Conditional Contribution.\"><span>contribution</span></a> </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_37A56040-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A problem with the <a href=\"/glossary/n/#not-for-profit-entity\" class=\"term\" title=\"An entity that possesses the following characteristics, in varying degrees, that distinguish it from a business entity: Contributions of significant amounts of resources from resource providers who do not expect commensurate or proportionate pecuniary return Operating purposes other than to provide goods or services at a profit Absence of ownership interests like those of business entities. Entities that clearly fall outside this definition include the following: All investor-owned entities Entities that provide dividends, lower costs, or other economic benefits directly and proportionately to their owners, members, or participants, such as mutual insurance entities, credit unions, farm and rural electric cooperatives, and employee benefit plans.\"><span>not-for-profit entity's</span></a> (NFP's) tax-exempt status, or that a determination letter regarding that status has not been received. </span></span></div></li></ol><span class=\"sfragment\" id=\"sfr_37A56126-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Section <a altsource=\"GUID-6542BDA9-F133-4EFC-9114-CE7EC1619A82.ditamap\" class=\"ditamap\">450-20-25</a> applies if one of these circumstances raises the possibility that an NFP may have incurred a loss. </span></span>Additionally, see Subtopic <a altsource=\"GUID-F515E730-63B5-4638-AFD8-A6EE535FF646.ditamap\" class=\"ditamap\">740-20</a> about tax positions taken when classifying an entity as tax-exempt if there is a problem with an NFP's tax-exempt status or if a determination letter has not been received.</div></div>","snippet":"In conformity with Subtopic 450-20, a liability may have to be accrued for loss contingencies. Examples of circumstances that may result in such contingencies include the following:\n(a) Noncompliance with donor-imposed r…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b3add84f19443ee85bc11063354da1f454ce4dea97b177cb4cd1a32d3f4f0509","downloaded_from":"2026-09-10T00:29:10.116Z","last_downloaded_at":"2026-09-10T00:29:10.116Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479004","source_sha256":"14a0e603dbc0c3ef08411d8d5e1b3e5101a7a891bb69cd81ea2a1c1a6921ccbc"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e3c7802de4d59d7852a9e3e7c3ebc5eaa81a6fb2d8361c8270d0441d2b70610e","downloaded_from":"2026-09-10T00:29:10.116Z","last_downloaded_at":"2026-09-10T00:29:10.116Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479004","source_sha256":"14a0e603dbc0c3ef08411d8d5e1b3e5101a7a891bb69cd81ea2a1c1a6921ccbc"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:3fc8c5a24b46d61255b6bcd7b2b9c4adfe5ab964a3eeaffe2df0f3b378c32a9e","downloaded_from":"2026-09-10T00:29:10.116Z","last_downloaded_at":"2026-09-10T00:29:10.116Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479004","source_sha256":"14a0e603dbc0c3ef08411d8d5e1b3e5101a7a891bb69cd81ea2a1c1a6921ccbc"}},{"number":"50","label":"50 Disclosure","anchor":"50-disclosure","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-958-50-1","para":"50-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_37AF140A-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In conformity with Section <a altsource=\"GUID-C6FA6504-8DCA-4A60-B7C3-C902B444EF8E.ditamap\" class=\"ditamap\">450-20-50</a>, the notes to financial statements may have to include information about <a href=\"/glossary/l/#loss-contingency\" class=\"term\" title=\"An existing condition, situation, or set of circumstances involving uncertainty as to possible loss to an entity that will ultimately be resolved when one or more future events occur or fail to occur. The term loss is used for convenience to include many charges against income that are commonly referred to as expenses and others that are commonly referred to as losses.\"><span>loss contingencies</span></a>. </span></span></div></div>","snippet":"In conformity with Section 450-20-50, the notes to financial statements may have to include information about loss contingencies.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a31007a05910d0bd4f2aa3ed8bab191660cc2e344168babadf94ee1764903149","downloaded_from":"2026-09-10T00:29:12.159Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478757","source_sha256":"e8d4d6ac32fa26a7833884a1337ed69448aa2a6d16e441102b69813403e53aca"}},{"citation":"450-958-50-2","para":"50-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_37AF15AB-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For example, noncompliance with <a href=\"/glossary/d/#donor-imposed-restriction\" class=\"term\" title=\"A donor stipulation (donors include other types of contributors, including makers of certain grants) that specifies a use for a contributed asset that is more specific than broad limits resulting from the following: The nature of the not-for-profit entity (NFP) The environment in which it operates The purposes specified in its articles of incorporation or bylaws or comparable documents for an unincorporated association. Some donors impose restrictions that are temporary in nature, for example, stipulating that resources be used after a specified date, for particular programs or services, or to acquire buildings or equipment. Other donors impose restrictions that are perpetual in nature, for example, stipulating that resources be maintained in perpetuity. Laws may extend those limits to investment returns from those resources and to other enhancements (diminishments) of those resources. Thus, those laws extend donor-imposed restrictions.\"><span>donor-imposed restrictions</span></a> shall be disclosed if either of the following is true: </span></span><ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_37AF1727-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">There is a reasonable possibility that a material contingent liability has been incurred at the date of the financial statements. </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_37AF186E-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">There is at least a reasonable possibility that the noncompliance could lead to a material loss of revenue or could cause an entity to be unable to continue as a going concern. </span></span></div></li></ol></div></div>","snippet":"For example, noncompliance with donor-imposed restrictions shall be disclosed if either of the following is true:\n(a) There is a reasonable possibility that a material contingent liability has been incurred at the date o…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cc795468870de421cb5aaca00761ccf65a6adee170c29198c2ee0f4f82b97ded","downloaded_from":"2026-09-10T00:29:12.159Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478757","source_sha256":"e8d4d6ac32fa26a7833884a1337ed69448aa2a6d16e441102b69813403e53aca"}},{"citation":"450-958-50-3","para":"50-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_37AF19C5-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the noncompliance results from a <a href=\"/glossary/n/#not-for-profit-entity\" class=\"term\" title=\"An entity that possesses the following characteristics, in varying degrees, that distinguish it from a business entity: Contributions of significant amounts of resources from resource providers who do not expect commensurate or proportionate pecuniary return Operating purposes other than to provide goods or services at a profit Absence of ownership interests like those of business entities. Entities that clearly fall outside this definition include the following: All investor-owned entities Entities that provide dividends, lower costs, or other economic benefits directly and proportionately to their owners, members, or participants, such as mutual insurance entities, credit unions, farm and rural electric cooperatives, and employee benefit plans.\"><span>not-for-profit entity's</span></a> (NFP's) failure to maintain an appropriate composition of assets in amounts needed to comply with all donor restrictions, the amounts and circumstances shall be disclosed. </span></span></div></div>","snippet":"If the noncompliance results from a not-for-profit entity's (NFP's) failure to maintain an appropriate composition of assets in amounts needed to comply with all donor restrictions, the amounts and circumstances shall be…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:2fd580a359cfeacd7b0cdeaaf0b6936d4ef5739c0c5f41a762450654a685ed07","downloaded_from":"2026-09-10T00:29:12.159Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478757","source_sha256":"e8d4d6ac32fa26a7833884a1337ed69448aa2a6d16e441102b69813403e53aca"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:40db3a4e7aa16b891f539d69b12146a4f7c4881bb55dfbf665f8ccfc5cc06aa8","downloaded_from":"2026-09-10T00:29:12.159Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478757","source_sha256":"e8d4d6ac32fa26a7833884a1337ed69448aa2a6d16e441102b69813403e53aca"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:ad721dfcba2589d96fc0406255cc0feebfc4c87e28e20fcb13f91203aa9fa333","downloaded_from":"2026-09-10T00:29:12.159Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478757","source_sha256":"e8d4d6ac32fa26a7833884a1337ed69448aa2a6d16e441102b69813403e53aca"}}],"enrichment":{"summary":"This Subtopic applies the general loss contingency model of Topic 450 to not-for-profit entities. It identifies two NFP-specific triggers — noncompliance with donor-imposed restrictions on contributed assets and problems with (or absence of a determination letter for) tax-exempt status — that may require accrual of a loss contingency under Subtopic 450-20 and disclosure under Section 450-20-50.","key_points":["NFPs must comply with the general contingency standards in Topic 450 in addition to this Subtopic (450-958-05-1).","A liability may have to be accrued for loss contingencies arising from noncompliance with donor-imposed restrictions on contributed assets or from a problem with the NFP's tax-exempt status or a missing determination letter (450-958-25-1).","Section 450-20-25 governs whether an NFP has incurred a loss when one of these circumstances arises (450-958-25-1).","Tax positions taken in classifying an entity as tax-exempt are addressed in Subtopic 740-20 when there is a tax-exempt status problem or no determination letter (450-958-25-1).","Noncompliance with donor-imposed restrictions must be disclosed if there is a reasonable possibility a material contingent liability was incurred at the financial statement date, or at least a reasonable possibility the noncompliance could cause a material loss of revenue or inability to continue as a going concern (450-958-50-2).","If the noncompliance results from failure to maintain an appropriate composition of assets in amounts needed to comply with all donor restrictions, the amounts and circumstances must be disclosed (450-958-50-3)."],"categories":["Contingencies and guarantees","Not-for-profit","Recognition","Disclosure"],"audience_level":"intermediate","student_note":"Remember that this Subtopic adds nothing to the probable/reasonably possible/remote framework — it just names the NFP-specific fact patterns that trigger it. A common misunderstanding is thinking donor-restriction noncompliance is only a disclosure matter; it can require accrual of a liability, and separate disclosure is required when the NFP failed to keep assets composed in amounts needed to satisfy donor restrictions.","related_topics":["450-20","958-10","740-20","958-605","958-210","205-40"],"key_concepts":["loss contingency","donor-imposed restrictions","tax-exempt status","determination letter","reasonable possibility","going concern","composition of assets","accrual of liability"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:d4fa1ba09d9937659c04dfdcb29816f3a06615f562f9e616c2dc1fd4116826ca","downloaded_from":"2026-09-10T00:28:58.769Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"405-958","title":"Not-for-Profit Entities","topic_title":"Liabilities","score":0.7962,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:41062f9d4d8f9d0854c32c4e988457fc02a86fda63e47f1849498125d719e341","downloaded_from":"2026-09-10T00:19:40.959Z","last_downloaded_at":"2026-09-10T00:20:08.319Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"470-958","title":"Not-for-Profit Entities","topic_title":"Debt","score":0.7725,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:4335516ac98d916affaea008e34d81833a1e408924a96dfb20f103c8871ea707","downloaded_from":"2026-09-10T00:34:51.743Z","last_downloaded_at":"2026-09-10T00:34:59.299Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-10","title":"Overall","topic_title":"Contingencies","score":0.7615,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:92e0976bcb1c04aba4e2c9d19150ab3e5a8e35994e81f108b10ae709f111a321","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-20","title":"Loss Contingencies","topic_title":"Contingencies","score":0.7487,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a44266d79e73f2fc0260e8013be138b4d3ba5fae2b0ad5de0888f9c9366e2305","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"958-10","title":"Overall","topic_title":"Not-for-Profit Entities","score":0.7365,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:201c8e00df308f13f7a2a16a3337e83b3859b4c4b27aa966ad1d5acef98c0029","downloaded_from":"2026-09-10T02:21:08.558Z","last_downloaded_at":"2026-09-10T02:21:26.859Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-30","title":"Gain Contingencies","topic_title":"Contingencies","score":0.7258,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c855aa9404e446f98036fafd4f8c320e54537a2bf1c57b0cba83d6776a89b04c","downloaded_from":"2026-09-10T00:27:48.583Z","last_downloaded_at":"2026-09-10T00:28:10.377Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"450-954","title":"Health Care Entities","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9f94417382ca035dd8c3cdf61955523cc36ac0eb650a03390ecab3c31522b8c7","downloaded_from":"2026-09-10T00:28:27.303Z","last_downloaded_at":"2026-09-10T00:28:57.040Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"450-980","title":"Regulated Operations","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9253687ead5878cc37b42e065c9b2a34ce6fdb1aef5e5b16bf725833ee6875d1","downloaded_from":"2026-09-10T00:29:15.540Z","last_downloaded_at":"2026-09-10T00:29:23.763Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a37c925f139e0d91e9c4dd1da53695837ffe29bb002a25a3f16fc978aac2643d","downloaded_from":"2026-09-10T00:28:58.769Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-980","topic":"450","title":"Regulated Operations","area":"Liabilities","paragraphs":3,"summary":"This subtopic addresses loss contingencies for entities with regulated operations (rate-regulated utilities). Its core rule: when a regulator allows an entity to recover an amount for a contingency in rates even though the amount does not meet the accrual criteria of 450-20-25-2, and the regulator requires the entity to remain accountable for amounts collected but not yet spent for the intended purpose, the increased charges to customers give rise to a liability rather than income.","concepts":["loss contingency","rate-regulated operations","allowable costs","regulatory liability","rate-making","accountability to customers","accrual criteria"],"categories":["Contingencies and guarantees","Recognition","Industry-specific"],"level":"intermediate","topic_title":"Contingencies","sections":[{"number":"05","label":"05 Overview and Background","anchor":"05-overview-and-background","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-980-05-1","para":"05-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic provides guidance for contingencies for entities with regulated operations.</div></div>","snippet":"This Subtopic provides guidance for contingencies for entities with regulated operations.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:00ce5d32cf7661436525fb4b91ab64e55b382d04c49a8a6a978be8f990d465c1","downloaded_from":"2026-09-10T00:29:15.540Z","last_downloaded_at":"2026-09-10T00:29:15.540Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478336","source_sha256":"3453a82d41d9444df3204b154e2a7fcfbadb95d10a5ee18ffb9b8922b2a4b4a3"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fc7e3fc5ac51effaffcd6a7823e4be3d41b42d9703499796b38946e0bdca49a9","downloaded_from":"2026-09-10T00:29:15.540Z","last_downloaded_at":"2026-09-10T00:29:15.540Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478336","source_sha256":"3453a82d41d9444df3204b154e2a7fcfbadb95d10a5ee18ffb9b8922b2a4b4a3"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:47c86ca5bc3bca90069fac7c9a714a7fce0f0a514b7b0a1cdd75f3aded0dd4d1","downloaded_from":"2026-09-10T00:29:15.540Z","last_downloaded_at":"2026-09-10T00:29:15.540Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478336","source_sha256":"3453a82d41d9444df3204b154e2a7fcfbadb95d10a5ee18ffb9b8922b2a4b4a3"}},{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"450-980-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section <a altsource=\"GUID-DFCF42C6-CE0D-45BC-9846-5A2EFDE587F3.ditamap\" class=\"ditamap\">980-10-15</a>.</div></div>","snippet":"This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 980-10-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:74bd8f5e9469b298c846dab30a3055361b7582f5e76dcdd8dedaab7d92e661e8","downloaded_from":"2026-09-10T00:29:17.238Z","last_downloaded_at":"2026-09-10T00:29:17.238Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479014","source_sha256":"31e69a6ff38fc5a4b382cdbcaf7a0bd720fcabbda2ac888946ddb68ac8e35eb3"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a571f87e97ad350214e7d9aa77b93a07bd4fb62ff69016521672ab3d4946cdfc","downloaded_from":"2026-09-10T00:29:17.238Z","last_downloaded_at":"2026-09-10T00:29:17.238Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479014","source_sha256":"31e69a6ff38fc5a4b382cdbcaf7a0bd720fcabbda2ac888946ddb68ac8e35eb3"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fb484d45be9367751bbc4f0206fb29e9c618c13a6cd08eaf1b154aa49ac9f207","downloaded_from":"2026-09-10T00:29:17.238Z","last_downloaded_at":"2026-09-10T00:29:17.238Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147479014","source_sha256":"31e69a6ff38fc5a4b382cdbcaf7a0bd720fcabbda2ac888946ddb68ac8e35eb3"}},{"number":"25","label":"25 Recognition","anchor":"25-recognition","is_sec":false,"groups":[{"block":null,"heading":null,"paragraphs":[{"citation":"450-980-25-1","para":"25-1","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_4692860C-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Paragraph <a href=\"/asc/450/20/#450-20-25-2\" class=\"xref\">450-20-25-2</a> specifies criteria for recording estimated losses from loss contingencies. A regulator may direct a regulated entity to include an amount for a contingency in <a href=\"/glossary/a/#allowable-costs\" class=\"term\" title=\"All costs for which revenue is intended to provide recovery. Those costs can be actual or estimated. In that context, allowable costs include interest cost and amounts provided for earnings on shareholders' investments.\"><span>allowable costs</span></a> for rate-making purposes even though the amount does not meet those criteria for recording. </span></span><span class=\"sfragment\" id=\"sfr_4692876B-6E93-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If the regulator requires the entity to remain accountable for any amounts charged pursuant to such rates and not yet expended for the intended purpose, the resulting increased charges to customers create a liability (see paragraph <a href=\"/asc/405/980/#405-980-25-1\" class=\"xref\">980-405-25-1(b)</a>). </span></span></div></div>","snippet":"Paragraph 450-20-25-2 specifies criteria for recording estimated losses from loss contingencies. A regulator may direct a regulated entity to include an amount for a contingency in allowable costs for rate-making purpose…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f12000a03a42b1759ca9d0f95026570d53fa06dbf993be3cf62db42c146dd6c1","downloaded_from":"2026-09-10T00:29:23.763Z","last_downloaded_at":"2026-09-10T00:29:23.763Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478044","source_sha256":"7fbb3d97fcff65b0f338435b71069166c4dd349818b91ce88517b55a1caa8e27"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9ea422fc4ceeb8bc68b798d7901a9c590fab8696f65db49b97236a58593506ae","downloaded_from":"2026-09-10T00:29:23.763Z","last_downloaded_at":"2026-09-10T00:29:23.763Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478044","source_sha256":"7fbb3d97fcff65b0f338435b71069166c4dd349818b91ce88517b55a1caa8e27"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:c7842b423f8ae931038f0207101ec7c25fef201827208bfab6727f4e8543b59b","downloaded_from":"2026-09-10T00:29:23.763Z","last_downloaded_at":"2026-09-10T00:29:23.763Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147478044","source_sha256":"7fbb3d97fcff65b0f338435b71069166c4dd349818b91ce88517b55a1caa8e27"}}],"enrichment":{"summary":"This subtopic addresses loss contingencies for entities with regulated operations (rate-regulated utilities). Its core rule: when a regulator allows an entity to recover an amount for a contingency in rates even though the amount does not meet the accrual criteria of 450-20-25-2, and the regulator requires the entity to remain accountable for amounts collected but not yet spent for the intended purpose, the increased charges to customers give rise to a liability rather than income.","key_points":["Scope follows the general regulated-operations scope in Section 980-10-15 (450-980-15-1), i.e., entities whose rates are set by a regulator and are designed to recover specific costs.","A regulator may direct inclusion of a contingency amount in allowable costs for rate-making purposes even when the probable-and-reasonably-estimable criteria of 450-20-25-2 are not met (450-980-25-1).","Regulatory approval of rate recovery does not itself justify accruing a loss contingency under Subtopic 450-20.","If the regulator requires the entity to remain accountable for amounts charged in rates and not yet expended for the intended purpose, the increased charges to customers create a liability (450-980-25-1).","That liability is recognized under the regulatory-liability guidance in paragraph 980-405-25-1(b)."],"categories":["Contingencies and guarantees","Recognition","Industry-specific"],"audience_level":"intermediate","student_note":"Tested point: rate recovery ordered by a regulator is not a substitute for the 450-20-25-2 accrual test — the amount collected is a regulatory liability, not a loss accrual or immediate revenue. Students often wrongly assume regulator-approved cost recovery automatically means the contingency is 'probable' and should be expensed.","related_topics":["450-20","980-10","980-405","980-340","410-20"],"key_concepts":["loss contingency","rate-regulated operations","allowable costs","regulatory liability","rate-making","accountability to customers","accrual criteria"],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:49003389aa1b580f36f8d9c473e5bb0a7afb1e41389d98a6017047e6055af991","downloaded_from":"2026-09-10T00:29:15.540Z","last_downloaded_at":"2026-09-10T00:29:23.763Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"related":[{"number":"405-980","title":"Regulated Operations","topic_title":"Liabilities","score":0.8729,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:f3a4871b23ab64b8ce612d5f0cb41ed28dd0018afe9aae859051c05c4249710b","downloaded_from":"2026-09-10T00:20:12.403Z","last_downloaded_at":"2026-09-10T00:20:28.784Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-10","title":"Overall","topic_title":"Contingencies","score":0.7657,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:28d3c209918a16d23d079e19aa32fa0f2b5bddfc224dc11cf30a82e068e3ceba","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:26:58.831Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"450-20","title":"Loss Contingencies","topic_title":"Contingencies","score":0.7523,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fa246ab96e718d01a8e4e548dacde05e07ea218780f2ab4f9e4e0935f85a1589","downloaded_from":"2026-09-10T00:27:01.778Z","last_downloaded_at":"2026-09-10T00:27:44.704Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"250-980","title":"Regulated Operations","topic_title":"Accounting Changes and Error Corrections","score":0.7462,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:a2fe1ec0850a14375cbb0e3a54a36b7ad42ef43a565d66651b46455af741f863","downloaded_from":"2026-09-09T23:17:47.227Z","last_downloaded_at":"2026-09-09T23:17:57.739Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"410-980","title":"Regulated Operations","topic_title":"Asset Retirement and Environmental Obligations","score":0.7425,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:38270468268448ccf34206734a27674bcadaa579fc07184499cb253c7a74bccd","downloaded_from":"2026-09-10T00:22:01.250Z","last_downloaded_at":"2026-09-10T00:22:29.648Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},{"number":"710-980","title":"Regulated Operations","topic_title":"Compensation—General","score":0.7311,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:41d6d6a4a1d380aee3fa296f126b2be80a83ef3461a9a82b468d40191510dbbe","downloaded_from":"2026-09-10T00:58:07.626Z","last_downloaded_at":"2026-09-10T00:58:16.201Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"prev":{"number":"450-958","title":"Not-for-Profit Entities","topic_title":"Contingencies","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:bd53ac8021a51fd4e33effcfaba3a8b857ef1900443f21b208718aa74ed2065f","downloaded_from":"2026-09-10T00:28:58.769Z","last_downloaded_at":"2026-09-10T00:29:12.159Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"next":{"number":"460-10","title":"Overall","topic_title":"Guarantees","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:de6090667bd131fe84830b90568b421e43aa5d497852c80dd8e4ef261c3a0ec0","downloaded_from":"2026-09-10T00:29:25.783Z","last_downloaded_at":"2026-09-10T00:30:02.138Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:8d771a6309e8695f1f8add3d0c47e5f898d923fb470cc65850a28cb13c02e0d9","downloaded_from":"2026-09-10T00:29:15.540Z","last_downloaded_at":"2026-09-10T00:29:23.763Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}],"paragraphs":169,"summary":"ASC 450 is the general framework for contingencies — existing conditions whose uncertainty will be resolved by a future event confirming the acquisition of an asset, reduction of a liability, impairment of an asset, or incurrence of a liability (450-10-05-5) — noting that merely using an estimate does not create a contingency (450-10-05-6). The Topic is deliberately asymmetric: a loss contingency is accrued only when it is probable that an asset was impaired or a liability incurred at the balance sheet date and the amount is reasonably estimable (450-20-25-2, with range accrual at the best estimate or the minimum per 450-20-30-1), and disclosed when a loss is at least reasonably possible (450-20-50-3 through 50-4); a gain contingency is generally not recognized at all, only disclosed without misleading implications about realization (450-30-25-1, 450-30-50-1). Industry and entity-specific subtopics adapt the model: government contractors (450-912), rate-regulated utilities where regulator-approved recovery creates a liability rather than income (450-980-25-1), not-for-profits facing donor-restriction noncompliance or tax-exempt status problems (450-958), and health care entities accruing malpractice losses (including incurred-but-not-reported incidents) gross of insurance recoveries (450-954). The single most important idea is the probable/reasonably-estimable accrual threshold paired with the conservative refusal to anticipate gains.","concepts":["loss contingency","gain contingency","probable and reasonably estimable","range of loss and minimum accrual","reasonably possible disclosure","unasserted claims","malpractice and incurred-but-not-reported claims","regulatory liability for rate-recovered contingencies"],"categories":["Contingencies and guarantees","Recognition","Disclosure","Industry-specific"],"level":"intermediate","provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:cc84c114f0f3c72101b616e9b74a26193c8373130366e7b532837c0e28decec5","downloaded_from":"2026-09-10T00:26:49.502Z","last_downloaded_at":"2026-09-10T00:29:23.763Z","date_scope":"source_page_range","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps"}}