# ASC 720-45-30: Other Expenses — Business and Technology Reengineering — 30 Initial Measurement

Source: FASB Accounting Standards Codification, Basic View

[Read online](https://asc.understandingaccounting.org/asc/720/45/#30-initial-measurement)

Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.

Tables and mathematical or amendment markup are retained as HTML where Markdown would lose structure.

Source downloaded (UTC): 2026-09-10T01:08:59.967Z to 2026-09-10T01:08:59.967Z

Record version: sha256:ad9f62698f4bd462551e653dcb497ea49a58155eee4f5c4835fdb6b9f190755e

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 720-45-30: 30 Initial Measurement

[Read section](https://asc.understandingaccounting.org/asc/720/45/#30-initial-measurement)

SEC content: no

##### [720-45-30-1](https://asc.understandingaccounting.org/asc/720/45/#720-45-30-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T01:08:59.967Z to 2026-09-10T01:08:59.967Z

Record version: sha256:26bf8d59aa68bf5a3351826ab4850466a613ac5ed4646e4cd1ac3eb3e47f9e94

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


When a third party is used for a business process reengineering project, the total consulting contract price (or the sum of the linked contracts with the same vendor) shall be allocated to each activity based on the relative fair values of those separate activities. The allocation shall be based on the objective evidence of the fair value of the elements in the contract, not necessarily the separate prices stated within the contract for each element.
