{"schema_version":2,"canonical_url":"https://asc.understandingaccounting.org/asc/815/15/#30-initial-measurement","source":"FASB Accounting Standards Codification, Basic View","usage":"Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.","topic":"815","topic_title":"Derivatives and Hedging","subtopic":"815-15","subtopic_title":"Embedded Derivatives","section":{"number":"30","label":"30 Initial Measurement","anchor":"30-initial-measurement","is_sec":false,"groups":[{"block":null,"heading":"Hybrid Instruments That Are Not Separated","paragraphs":[{"citation":"815-15-30-1","para":"30-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">An entity shall measure both of the following initially at <a href=\"/glossary/f/#fair-value\" class=\"term\" title=\"The price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date.\"><span>fair value</span></a>: <ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_9F212534-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">A hybrid financial instrument that under paragraph <a href=\"/asc/815/15/#815-15-25-1\" class=\"xref\">815-15-25-1</a> would be required to be separated into a host contract and a <a href=\"/glossary/d/#derivative-instrument\" class=\"term\" title=\"Paragraphs 815-10-15-83815-10-15-84815-10-15-85815-10-15-86815-10-15-87815-10-15-88815-10-15-89815-10-15-90815-10-15-91815-10-15-92815-10-15-93815-10-15-94815-10-15-95815-10-15-96815-10-15-97815-10-15-98815-10-15-99815-10-15-100815-10-15-101815-10-15-102815-10-15-103815-10-15-104815-10-15-105815-10-15-106815-10-15-107815-10-15-108815-10-15-109815-10-15-110815-10-15-111815-10-15-112815-10-15-113815-10-15-114815-10-15-115815-10-15-116815-10-15-117815-10-15-118815-10-15-119815-10-15-120815-10-15-121815-10-15-122815-10-15-123815-10-15-124815-10-15-125815-10-15-126815-10-15-127815-10-15-128815-10-15-129815-10-15-130815-10-15-131815-10-15-132815-10-15-133815-10-15-134815-10-15-135815-10-15-136815-10-15-137815-10-15-138815-10-15-139 define the term derivative instrument.\"><span>derivative instrument</span></a> that an entity irrevocably elects to initially and subsequently measure in its entirety at fair value (with changes in fair value recognized in earnings) </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_9F21269C-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">An entire <a href=\"/glossary/h/#hybrid-instrument\" class=\"term\" title=\"A contract that embodies both an embedded derivative and a host contract.\"><span>hybrid instrument</span></a> if an entity cannot reliably identify and measure the <a href=\"/glossary/e/#embedded-derivative\" class=\"term\" title=\"Implicit or explicit terms that affect some or all of the cash flows or the value of other exchanges required by a contract in a manner similar to a derivative instrument.\"><span>embedded derivative</span></a> that paragraph <a href=\"/asc/815/15/#815-15-25-1\" class=\"xref\">815-15-25-1</a> requires be separated from the host contract. </span></span></div></li></ol></div></div>","snippet":"An entity shall measure both of the following initially at fair value:\n(a) A hybrid financial instrument that under paragraph 815-15-25-1 would be required to be separated into a host contract and a derivative instrument…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:db1f733d249341ba31da406acc58f69a4c28e51c0ab44a7a8f0a526a1d6de1bd","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e687278343f50c5042e38d3338e0e0436d5253718724dd388f47eff459418651","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}},{"block":null,"heading":"Hybrid Instruments That Are Separated","paragraphs":[{"citation":"815-15-30-2","para":"30-2","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_9F212831-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The allocation method that records the embedded derivative at fair value and determines the initial carrying value assigned to the host contract as the difference between the basis of the hybrid instrument and the fair value of the embedded derivative </span></span><span class=\"sfragment\" id=\"sfr_9F212957-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">shall be used to determine the carrying values of the host contract component and the embedded derivative component of a hybrid instrument </span></span><span class=\"sfragment\" id=\"sfr_9F212A71-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">if separate accounting for the embedded derivative is required by this Subtopic. </span></span><span class=\"sfragment\" id=\"sfr_9F212BCF-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">(Note that Section <a altsource=\"GUID-A2CBDF18-8AA0-4CDA-B5BE-4221D57DC9BA.ditamap\" class=\"ditamap\">815-15-25</a> allows for a fair value election for hybrid financial instruments that otherwise would require bifurcation.)</span></span></div></div>","snippet":"The allocation method that records the embedded derivative at fair value and determines the initial carrying value assigned to the host contract as the difference between the basis of the hybrid instrument and the fair v…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:9a6918ec26add3b4e9a96972d1a140c9f3b48f9d95233f6416d84fa14ba8254a","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}},{"citation":"815-15-30-3","para":"30-3","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_9F212CCD-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The objective is to estimate the fair value of the derivative features separately from the fair value of the nonderivative portions of the contract. </span></span><span class=\"sfragment\" id=\"sfr_9F212DAD-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Estimates of fair value shall reflect all relevant features of each component. </span></span><span class=\"sfragment\" id=\"sfr_9F212E90-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">For example, an embedded purchased option that expires if the contract in which it is embedded is prepaid would have a different value than an option whose term is a specified period that is not subject to truncation. </span></span></div></div>","snippet":"The objective is to estimate the fair value of the derivative features separately from the fair value of the nonderivative portions of the contract. Estimates of fair value shall reflect all relevant features of each com…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1a2e26ac2ddbb092074862e370103ae567a2c3783a8580cfa5b6ebfe1e18bcbc","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}},{"citation":"815-15-30-4","para":"30-4","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_9F212FD7-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In separating a non-option embedded derivative from the host contract under paragraph <a href=\"/asc/815/15/#815-15-25-1\" class=\"xref\">815-15-25-1</a>, the terms of that non-option embedded derivative shall be determined in a manner that results in its fair value generally being equal to zero at the inception of the hybrid instrument. </span></span><span class=\"sfragment\" id=\"sfr_9F213103-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Because a loan and an embedded derivative can be bundled in a structured note that could have almost an infinite variety of stated terms, it is inappropriate to necessarily attribute significance to every one of the note's stated terms in determining the terms of the non-option embedded derivative. </span></span><span class=\"sfragment\" id=\"sfr_9F2131EA-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">If a non-option embedded derivative has stated terms that are off-market at inception, that amount shall be quantified and allocated to the host contract because it effectively represents a borrowing. </span></span><span class=\"sfragment\" id=\"sfr_9F2132CA-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">(This paragraph does not address the bifurcation of the embedded derivative by a holder who has acquired the hybrid instrument from a third party after the inception of that hybrid instrument.) </span></span><span class=\"sfragment\" id=\"sfr_9F2133A6-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The non-option embedded derivative shall contain a <a href=\"/glossary/n/#notional-amount\" class=\"term\" title=\"A number of currency units, shares, bushels, pounds, or other units specified in a derivative instrument. Sometimes other names are used. For example, the notional amount is called a face amount in some contracts.\"><span>notional amount</span></a> and an <a href=\"/glossary/u/#underlying\" class=\"term\" title=\"A specified interest rate, security price, commodity price, foreign exchange rate, index of prices or rates, or other variable (including the occurrence or nonoccurrence of a specified event such as a scheduled payment under a contract). An underlying may be a price or rate of an asset or liability but is not the asset or liability itself. An underlying is a variable that, along with either a notional amount or a payment provision, determines the settlement of a derivative instrument.\"><span>underlying</span></a> consistent with the terms of the hybrid instrument. </span></span><span class=\"sfragment\" id=\"sfr_9F2134AF-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Artificial terms shall not be created to introduce leverage, asymmetry, or some other risk exposure not already present in the hybrid instrument. </span></span><span class=\"sfragment\" id=\"sfr_9F2135D8-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Generally, the appropriate terms for the non-option embedded derivative will be readily apparent. </span></span><span class=\"sfragment\" id=\"sfr_9F2136AE-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">Often, simply adjusting the referenced forward price (pursuant to documented legal terms) to be at the market for the purpose of separately accounting for the embedded derivative will result in that non-option embedded derivative having a fair value of zero at inception of the hybrid instrument. </span></span></div></div>","snippet":"In separating a non-option embedded derivative from the host contract under paragraph 815-15-25-1, the terms of that non-option embedded derivative shall be determined in a manner that results in its fair value generally…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:65fa3227283fa9e597be83667aa3a1037746589e0468bbadab6760efa543bed1","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}},{"citation":"815-15-30-5","para":"30-5","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_9F21378F-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In separating a non-option embedded derivative from the host contract under paragraph <a href=\"/asc/815/15/#815-15-25-1\" class=\"xref\">815-15-25-1</a> if the holder has acquired the hybrid instrument in a secondary market after the inception of the hybrid instrument, the terms of the embedded derivative shall be determined by the holder so as to result in the derivative instrument having a fair value generally equal to zero at the date the holder enters into (that is, acquires) the hybrid instrument. </span></span><span class=\"sfragment\" id=\"sfr_9F213861-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The initial accounting by the holder of the hybrid instrument shall not be affected by whether it purchased the hybrid instrument at inception or after inception in a secondary market. </span></span></div></div>","snippet":"In separating a non-option embedded derivative from the host contract under paragraph 815-15-25-1 if the holder has acquired the hybrid instrument in a secondary market after the inception of the hybrid instrument, the t…","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:b8c0c4e0dbd589459c4bad97a77fcd4600b14a264de7a47d5000e5e54e49ef29","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}},{"citation":"815-15-30-6","para":"30-6","html":"<div class=\"asc-body\"><div class=\"norm-text\"><span class=\"sfragment\" id=\"sfr_9F213938-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The terms of an option-based embedded derivative shall not be adjusted to result in the embedded derivative being at the money at the inception of the hybrid instrument. </span></span><span class=\"sfragment\" id=\"sfr_9F213A05-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">In separating an option-based embedded derivative from the host contract under paragraph <a href=\"/asc/815/15/#815-15-25-1\" class=\"xref\">815-15-25-1</a>, the strike price of the embedded derivative shall be based on the stated terms documented in the hybrid instrument. </span></span><span class=\"sfragment\" id=\"sfr_9F213AD2-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">As a result, the option-based embedded derivative at inception may have a strike price that does not equal the market price of the asset associated with the underlying. </span></span>The guidance in this paragraph addresses both of the following:<ol class=\"ol-norm\"><li class=\"li-norm\"><span class=\"linum\">a</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_9F213B9D-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The bifurcation of the option-based embedded derivative </span></span><span class=\"sfragment\" id=\"sfr_9F213C63-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">by a holder who has acquired the hybrid instrument from a third party either at inception or after inception of that hybrid instrument </span></span></div></li><li class=\"li-norm\"><span class=\"linum\">b</span><div class=\"p\"><span class=\"sfragment\" id=\"sfr_9F213D2B-6E92-1014-A13F-6E4B94C84136\"><span class=\"sfragment-source\">The bifurcation of the option-based embedded derivative by the issuer when separate accounting for that embedded derivative is required. </span></span></div></li></ol></div></div>","snippet":"The terms of an option-based embedded derivative shall not be adjusted to result in the embedded derivative being at the money at the inception of the hybrid instrument. In separating an option-based embedded derivative …","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:25f3e082e01d780613a399c6dd09695c05c49a3ce7eef3a73637e08480a9b637","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:1a66281ca1b4975ebf1aa9082608ced913d54f3175d66d42de5ac39167f892a8","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e4a95ec3e16bc9cc8e258d6a80c6307927fd2cdcfa15d37894a4bc702bf0c082","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:e4a95ec3e16bc9cc8e258d6a80c6307927fd2cdcfa15d37894a4bc702bf0c082","downloaded_from":"2026-09-10T01:36:11.044Z","last_downloaded_at":"2026-09-10T01:36:11.044Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147481082","source_sha256":"539158f492ac3dfa8df67f2966fd690b8321d481194615617fb8ff3e506afd3a"}}