{"schema_version":2,"canonical_url":"https://asc.understandingaccounting.org/asc/910/20/#15-scope-and-scope-exceptions","source":"FASB Accounting Standards Codification, Basic View","usage":"Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.","topic":"910","topic_title":"Contractors—Construction","subtopic":"910-20","subtopic_title":"Contract Costs","section":{"number":"15","label":"15 Scope and Scope Exceptions","anchor":"15-scope-and-scope-exceptions","is_sec":false,"groups":[{"block":null,"heading":"Overall Guidance","paragraphs":[{"citation":"910-20-15-1","para":"15-1","html":"<div class=\"asc-body\"><div class=\"norm-text\">This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section <a altsource=\"GUID-20A2FEEC-6C92-4D4C-8C63-B5F36B9E949B.ditamap\" class=\"ditamap\">910-10-15</a>.</div></div>","snippet":"This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 910-10-15.","pending":false,"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:49c03b736c36fcc8c323730205ac1bba0e4ce59e40ce0f572fe3acaeb153bfdc","downloaded_from":"2026-09-10T02:09:38.861Z","last_downloaded_at":"2026-09-10T02:09:38.861Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482416","source_sha256":"36c1812e3adb711b5db52903430774ba0705e76b7f7782a0e0ca8de970038507"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:fac75841acaee867c4c8b7e946f2c646d42210e106d0530723ce8af13f533448","downloaded_from":"2026-09-10T02:09:38.861Z","last_downloaded_at":"2026-09-10T02:09:38.861Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482416","source_sha256":"36c1812e3adb711b5db52903430774ba0705e76b7f7782a0e0ca8de970038507"}}],"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:41b57c0cd8323da98f2b3e979b27cb252c431d3f22a5b46e81c2a83df23c4a82","downloaded_from":"2026-09-10T02:09:38.861Z","last_downloaded_at":"2026-09-10T02:09:38.861Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482416","source_sha256":"36c1812e3adb711b5db52903430774ba0705e76b7f7782a0e0ca8de970038507"}},"provenance":{"source_url":"https://asc.fasb.org/","snapshot_version":"sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f","record_version":"sha256:41b57c0cd8323da98f2b3e979b27cb252c431d3f22a5b46e81c2a83df23c4a82","downloaded_from":"2026-09-10T02:09:38.861Z","last_downloaded_at":"2026-09-10T02:09:38.861Z","date_scope":"source_page","effective_as_of":null,"effective_as_of_status":"Not established by retrieval timestamps","source_key":"1943274/2147482416","source_sha256":"36c1812e3adb711b5db52903430774ba0705e76b7f7782a0e0ca8de970038507"}}