# ASC 910-20-15: Contractors—Construction — Contract Costs — 15 Scope and Scope Exceptions

Source: FASB Accounting Standards Codification, Basic View

[Read online](https://asc.understandingaccounting.org/asc/910/20/#15-scope-and-scope-exceptions)

Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.

Tables and mathematical or amendment markup are retained as HTML where Markdown would lose structure.

Source downloaded (UTC): 2026-09-10T02:09:38.861Z to 2026-09-10T02:09:38.861Z

Record version: sha256:41b57c0cd8323da98f2b3e979b27cb252c431d3f22a5b46e81c2a83df23c4a82

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 910-20-15: 15 Scope and Scope Exceptions

[Read section](https://asc.understandingaccounting.org/asc/910/20/#15-scope-and-scope-exceptions)

SEC content: no

#### Overall Guidance

##### [910-20-15-1](https://asc.understandingaccounting.org/asc/910/20/#910-20-15-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T02:09:38.861Z to 2026-09-10T02:09:38.861Z

Record version: sha256:49c03b736c36fcc8c323730205ac1bba0e4ce59e40ce0f572fe3acaeb153bfdc

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Subtopic follows the same Scope and Scope Exceptions as outlined in the Overall Subtopic, see Section 910-10-15.
