# ASC 410-20: Asset Retirement and Environmental Obligations — Asset Retirement Obligations

Source: FASB Accounting Standards Codification, Basic View

[Read online](https://asc.understandingaccounting.org/asc/410/20/)

Study and research edition. Verify current requirements with the official source. Summaries, enrichment, and tags are machine-generated study aids. Paragraph html preserves source markup; snippet is abbreviated. Pending content is not necessarily effective.

Tables and mathematical or amendment markup are retained as HTML where Markdown would lose structure.

Source downloaded (UTC): 2026-09-10T00:20:40.400Z to 2026-09-10T00:21:17.061Z

Record version: sha256:af056de0675ec3af592ae003d0b223f3dca6330d1718bc7d04627f0d1393589e

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20: Asset Retirement and Environmental Obligations — Asset Retirement Obligations

### Machine-generated study aids

```json
{
  "summary": "ASC 410-20 governs legal obligations associated with the retirement of tangible long-lived assets that arise from acquisition, construction, development, and/or normal operation of the asset, including environmental remediation resulting from normal operations. An entity recognizes the fair value of the ARO liability in the period incurred if fair value can be reasonably estimated, and simultaneously capitalizes an equal asset retirement cost in the carrying amount of the related long-lived asset (410-20-25-4; 410-20-25-5). Fair value is normally measured with an expected present value technique discounted at a credit-adjusted risk-free rate, with later changes recognized as accretion expense and as revisions to estimated cash flows (410-20-30-1; 410-20-35-3).",
  "key_points": [
    "An entity recognizes an ARO at fair value in the period incurred if a reasonable estimate can be made; otherwise recognition is deferred until a reasonable estimate is possible, and an ARO on an acquired asset is recognized at the acquisition date as if incurred then (410-20-25-4; 410-20-25-16).",
    "Upon initial recognition, the entity capitalizes an asset retirement cost by increasing the carrying amount of the related long-lived asset by the same amount as the liability, and allocates that cost to expense over the asset's useful life using a systematic and rational method (410-20-25-5; 410-20-35-2).",
    "A conditional ARO must be recognized before the event requiring or waiving performance occurs; the obligation to stand ready is unconditional, and uncertainty about timing/method and about whether performance will be enforced affects measurement, not recognition (410-20-25-7; 410-20-25-13 through 25-15); when the conditional aspect has two outcomes and no information on which is more probable, 50 percent is used for each (410-20-25-14).",
    "Fair value is usually measured with an expected present value technique, discounting expected cash flows (including third-party costs, overhead, profit margin, inflation, and a market-risk premium) at a credit-adjusted risk-free rate (410-20-30-1; 410-20-55-13).",
    "Subsequent changes arise from (a) passage of time, measured by the interest method using the credit-adjusted risk-free rate in effect when that layer was initially measured and recognized as accretion expense (an operating item), and (b) revisions to timing or amount of undiscounted cash flows, measured before which accretion must first be recorded (410-20-35-3 through 35-5; 410-20-45-1).",
    "Upward revisions in undiscounted estimated cash flows are discounted at the current credit-adjusted risk-free rate; downward revisions are discounted at the rate that existed when the original liability was recognized (or a weighted-average rate if the layer cannot be identified) (410-20-35-8).",
    "Required disclosures include a description of the AROs and related assets, the fair value of assets legally restricted for settling AROs, and a reconciliation of the beginning and ending carrying amount showing liabilities incurred, liabilities settled, accretion expense, and revisions in estimated cash flows; if fair value cannot be reasonably estimated, that fact and the reasons must be disclosed (410-20-50-1; 410-20-50-2)."
  ],
  "categories": [
    "Recognition",
    "Initial measurement",
    "Subsequent measurement",
    "Fair value"
  ],
  "audience_level": "intermediate",
  "student_note": "Exams love the conditional ARO trap: a low likelihood of enforcement or an indefinitely deferrable obligation still requires recognition (uncertainty goes into measurement, not recognition) — the only true recognition deferral is when fair value cannot be reasonably estimated. Also memorize the asymmetric rate rule: upward cash flow revisions use the current credit-adjusted risk-free rate, downward revisions use the original (or weighted-average) rate.",
  "related_topics": [
    "410-30",
    "360-10",
    "420",
    "842-10",
    "820-10",
    "980-10"
  ],
  "key_concepts": [
    "asset retirement obligation",
    "asset retirement cost",
    "conditional asset retirement obligation",
    "expected present value technique",
    "credit-adjusted risk-free rate",
    "accretion expense",
    "legal obligation",
    "normal operation of a long-lived asset"
  ]
}
```

Source downloaded (UTC): 2026-09-10T00:20:40.400Z to 2026-09-10T00:20:40.400Z

Record version: sha256:2656223cf3fcfd398ff03c7cc685152d0a0530eff4c92eb96e765c01af0c686a

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-00: 00 Status

[Read section](https://asc.understandingaccounting.org/asc/410/20/#00-status)

SEC content: no

##### [410-20-00-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-00-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:40.400Z to 2026-09-10T00:20:40.400Z

Record version: sha256:aaeaaf1814f9ba361027b0cdc9c091abd09dc316596bce030bd3f914cfbec312

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The following table identifies the changes made to this Subtopic.

<table class="asc-table" id="SL29646839-159025"><tbody><tr><td class="entry"><strong class="ph b">Paragraph</strong></td><td class="entry"><strong class="ph b">Action</strong></td><td class="entry"><strong class="ph b">Accounting Standards Update</strong></td><td class="entry"><strong class="ph b">Date</strong></td></tr><tr><td class="entry"></td><td class="entry"></td><td class="entry"></td><td class="entry"></td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/c/#commencement-date-of-the-lease-commencement-date" class="term" title="The date on which a lessor makes an underlying asset available for use by a lessee. See paragraphs 842-10-55-19842-10-55-20842-10-55-21 for implementation guidance on the commencement date."><span>Commencement Date of the Lease (Commencement Date)</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/c/#contract" class="term" title="An agreement between two or more parties that creates enforceable rights and obligations."><span>Contract</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2014-09/" class="xref">Accounting Standards Update No. 2014-09</a></td><td class="entry">05/28/2014</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/c/#customer" class="term" title="A party that has contracted with an entity to obtain goods or services that are an output of the entity's ordinary activities in exchange for consideration."><span>Customer</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2014-09/" class="xref">Accounting Standards Update No. 2014-09</a></td><td class="entry">05/28/2014</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/f/#fair-value" class="term" title="The price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date."><span>Fair Value</span></a> (3rd def.)</td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2012-04/" class="xref">Accounting Standards Update No. 2012-04</a></td><td class="entry">10/01/2012</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/l/#lease" class="term" title="A contract, or part of a contract, that conveys the right to control the use of identified property, plant, or equipment (an identified asset) for a period of time in exchange for consideration."><span>Lease</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/l/#lease-payments" class="term" title="See paragraph 842-10-30-5 for what constitutes lease payments from the perspective of a lessee and a lessor."><span>Lease Payments</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/l/#lease-term" class="term" title="The noncancellable period for which a lessee has the right to use an underlying asset, together with all of the following: Periods covered by an option to extend the lease if the lessee is reasonably certain to exercise that option Periods covered by an option to terminate the lease if the lessee is reasonably certain not to exercise that option Periods covered by an option to extend (or not to terminate) the lease in which exercise of the option is controlled by the lessor."><span>Lease Term</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/l/#lessee" class="term" title="An entity that enters into a contract to obtain the right to use an underlying asset for a period of time in exchange for consideration."><span>Lessee</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/l/#lessor" class="term" title="An entity that enters into a contract to provide the right to use an underlying asset for a period of time in exchange for consideration."><span>Lessor</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/r/#revenue" class="term" title="Inflows or other enhancements of assets of an entity or settlements of its liabilities (or a combination of both) from delivering or producing goods, rendering services, or other activities that constitute the entity's ongoing major or central operations."><span>Revenue</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2014-09/" class="xref">Accounting Standards Update No. 2014-09</a></td><td class="entry">05/28/2014</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/u/#underlying-asset" class="term" title="An asset that is the subject of a lease for which a right to use that asset has been conveyed to a lessee. The underlying asset could be a physically distinct portion of a single asset."><span>Underlying Asset</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/glossary/v/#variable-lease-payments" class="term" title="Payments made by a lessee to a lessor for the right to use an underlying asset that vary because of changes in facts or circumstances occurring after the commencement date, other than the passage of time."><span>Variable Lease Payments</span></a></td><td class="entry">Added</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"></td><td class="entry"></td><td class="entry"></td><td class="entry"></td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-15-2" class="xref">410-20-15-2</a></td><td class="entry">Amended</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-15-3" class="xref">410-20-15-3</a></td><td class="entry">Amended</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><div class="xref-range displayInline"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-25-1" class="xref">410-20-25-1 through 25-3A</a></div></td><td class="entry">Superseded</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2024-02/" class="xref">Accounting Standards Update No. 2024-02</a></td><td class="entry">03/29/2024</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-25-10" class="xref">410-20-25-10</a></td><td class="entry">Amended</td><td class="entry"><a href="https://asc.understandingaccounting.org/asc-pdf/GUID-6A8ECCE2-2DD0-4750-978D-D37E5AA3DC28.pdf" class="pdf-link" target="_blank" rel="noopener">Maintenance Update 2018-02 (PDF)</a></td><td class="entry">02/02/2018</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-50-1" class="xref">410-20-50-1</a></td><td class="entry">Amended</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2024-03/" class="xref">Accounting Standards Update No. 2024-03</a></td><td class="entry">11/04/2024</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-55-26" class="xref">410-20-55-26</a></td><td class="entry">Amended</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2024-02/" class="xref">Accounting Standards Update No. 2024-02</a></td><td class="entry">03/29/2024</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-55-27" class="xref">410-20-55-27</a></td><td class="entry">Amended</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2012-04/" class="xref">Accounting Standards Update No. 2012-04</a></td><td class="entry">10/01/2012</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-55-28" class="xref">410-20-55-28</a></td><td class="entry">Amended</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2014-09/" class="xref">Accounting Standards Update No. 2014-09</a></td><td class="entry">05/28/2014</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-55-44" class="xref">410-20-55-44</a></td><td class="entry">Amended</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2016-02/" class="xref">Accounting Standards Update No. 2016-02</a></td><td class="entry">02/25/2016</td></tr><tr><td class="entry"><a href="https://asc.understandingaccounting.org/asc/410/20/#410-20-55-66" class="xref">410-20-55-66</a></td><td class="entry">Amended</td><td class="entry"><a href="https://asc.understandingaccounting.org/updates/asu-2012-04/" class="xref">Accounting Standards Update No. 2012-04</a></td><td class="entry">10/01/2012</td></tr></tbody></table>

Source downloaded (UTC): 2026-09-10T00:20:43.312Z to 2026-09-10T00:20:43.312Z

Record version: sha256:586115292b631167ce4a55a687cd68d19ac087cc5f50e365e44cee5c53152dd2

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-05: 05 Overview and Background

[Read section](https://asc.understandingaccounting.org/asc/410/20/#05-overview-and-background)

SEC content: no

##### [410-20-05-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-05-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:43.312Z to 2026-09-10T00:20:43.312Z

Record version: sha256:325e32ee2be49cef12c64f4c80ef3afa64adaf8cbea31a152dc45f301add364a

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Subtopic establishes accounting standards for recognition and measurement of a liability for an [asset retirement obligation](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset.") and the associated [asset retirement cost](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-cost "The amount capitalized that increases the carrying amount of the long-lived asset when a liability for an asset retirement obligation is recognized."). This Subtopic also addresses the accounting for an environmental remediation liability that results from the normal operation of a long-lived asset.

##### [410-20-05-2](https://asc.understandingaccounting.org/asc/410/20/#410-20-05-2)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:43.312Z to 2026-09-10T00:20:43.312Z

Record version: sha256:7ddf04c748e40df790caa26654153b7894892fdbd93c387a5385275bb0da4948

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


[Paragraph not used](https://asc.understandingaccounting.org/updates/page-1833002/).

Source downloaded (UTC): 2026-09-10T00:20:45.653Z to 2026-09-10T00:20:45.653Z

Record version: sha256:e49e30da13f75514707023b1be4ea06c7687d12264a10729550a4997e108d42e

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-15: 15 Scope and Scope Exceptions

[Read section](https://asc.understandingaccounting.org/asc/410/20/#15-scope-and-scope-exceptions)

SEC content: no

#### Entities

##### [410-20-15-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-15-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:45.653Z to 2026-09-10T00:20:45.653Z

Record version: sha256:be8e03d84ab05d180fb9cf34aff99d38c0457483756ccee23f8253ec6e7eef61

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The guidance in this Subtopic applies to all entities, including rate-regulated entities that meet the criteria for application of Subtopic 980-10, as provided in paragraph [980-10-15-2](https://asc.understandingaccounting.org/asc/980/10/#980-10-15-2). Paragraphs [980-340-25-1](https://asc.understandingaccounting.org/asc/340/980/#340-980-25-1) and [980-405-25-1](https://asc.understandingaccounting.org/asc/405/980/#405-980-25-1) provide specific conditions that must be met to recognize a regulatory asset and a regulatory liability, respectively. (See paragraphs

[410-20-55-1 through 55-12](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-1)

and

[410-20-55-21 through 55-22](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-21)

for implementation guidance)

#### Transactions

##### [410-20-15-2](https://asc.understandingaccounting.org/asc/410/20/#410-20-15-2)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:45.653Z to 2026-09-10T00:20:45.653Z

Record version: sha256:0d0c4c18e99f68733e5e385a5837482c0bc817a29ad82615cdc1c2f68a4e02e9

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The guidance in this Subtopic applies to the following transactions and activities:

1.  a
    
    [Legal obligations](https://asc.understandingaccounting.org/glossary/l/#legal-obligation "An obligation that a party is required to settle as a result of an existing or enacted law, statute, ordinance, or written or oral contract or by legal construction of a contract under the doctrine of promissory estoppel.") associated with the [retirement](https://asc.understandingaccounting.org/glossary/r/#retirement "The other-than-temporary removal of a long-lived asset from service. That term encompasses sale, abandonment, recycling, or disposal in some other manner. However, it does not encompass the temporary idling of a long-lived asset. After an entity retires an asset, that asset is no longer under the control of that entity, no longer in existence, or no longer capable of being used in the manner for which the asset was originally acquired, constructed, or developed.")of a tangible long-lived asset that result from the acquisition, construction, or development and (or) the normal operation of a long-lived asset, including any legal obligations that require [disposal](https://asc.understandingaccounting.org/glossary/d/#disposal "Related to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 and the Resource Conservation and Recovery Act of 1976: under the Resource Conservation and Recovery Act of 1976, the discharge, deposit, injection, dumping, spilling, leaking, or placing of any solid waste or hazardous waste into or on any land or water so that such solid waste or hazardous waste or any constituent thereof may enter the environment or be emitted into the air or discharged into any waters, including groundwaters. Similarly under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 with regard to hazardous substances.") of a replaced part that is a component of a tangible long-lived asset.
    
2.  b
    
    An environmental remediation liability that results from the normal operation of a long-lived asset and that is associated with the retirement of that asset. The fact that partial settlement of an obligation is required or performed before full retirement of an asset does not remove that obligation from the scope of this Subtopic. If environmental contamination is incurred in the normal operation of a long-lived asset and is associated with the retirement of that asset, then this Subtopic will apply (and Subtopic 410-30 will not apply) if the entity is legally obligated to treat the contamination.
    
3.  c
    
    A conditional obligation to perform a retirement activity. Uncertainty about the timing of settlement of the [asset retirement obligation](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset.") does not remove that obligation from the scope of this Subtopic but will affect the measurement of a liability for that obligation (see paragraph [410-20-25-10](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-10)).
    
4.  d
    
    Obligations of a [lessor](https://asc.understandingaccounting.org/glossary/l/#lessor "An entity that enters into a contract to provide the right to use an underlying asset for a period of time in exchange for consideration.") in connection with an [underlying asset](https://asc.understandingaccounting.org/glossary/u/#underlying-asset "An asset that is the subject of a lease for which a right to use that asset has been conveyed to a lessee. The underlying asset could be a physically distinct portion of a single asset.") that meet the provisions in (a).
    
5.  e
    
    The costs associated with the retirement of a specified asset that qualifies as historical waste equipment as defined by EU Directive 2002/96/EC. (See paragraphs
    
    [410-20-55-23 through 55-30](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-23)
    
    and Example 4 \[paragraph [410-20-55-63](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-63)\] for illustration of this guidance.) Paragraph [410-20-55-24](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-24) explains how the Directive distinguishes between new and historical waste and provides related implementation guidance.

##### [410-20-15-3](https://asc.understandingaccounting.org/asc/410/20/#410-20-15-3)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:45.653Z to 2026-09-10T00:20:45.653Z

Record version: sha256:8caa2131024b66a2e302c155f2f8146959a90a2ce7cd22b0bcfbc986dfc6a938

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The guidance in this Subtopic does not apply to the following transactions and activities:

1.  a
    
    Obligations that arise solely from a plan to sell or otherwise dispose of a long-lived asset covered by Subtopic 360-10.
    
2.  b
    
    An environmental remediation liability that results from the improper operation of a long-lived asset (see Subtopic 410-30). Obligations resulting from improper operations do not represent costs that are an integral part of the tangible long-lived asset and therefore should not be accounted for as part of the cost basis of the asset. For example, a certain amount of spillage may be inherent in the normal operations of a fuel storage facility, but a catastrophic accident caused by noncompliance with an entity's safety procedures is not. The obligation to clean up the spillage resulting from the normal operation of the fuel storage facility is within the scope of this Subtopic. The obligation to clean up after the catastrophic accident results from the improper use of the facility and is not within the scope of this Subtopic.
    
3.  c
    
    Activities necessary to prepare an asset for an alternative use as they are not associated with the retirement of the asset.
    
4.  d
    
    Historical waste held by private households. (The guidance in this paragraph does not pertain to an asset retirement obligation in the scope of this Subtopic.) For guidance on accounting for historical electronic equipment waste held by private households for obligations associated with Directive 2002/96/EC on Waste Electrical and Electronic Equipment adopted by the European Union, see Subtopic 720-40.
    
5.  e
    
    Obligations of a [lessee](https://asc.understandingaccounting.org/glossary/l/#lessee "An entity that enters into a contract to obtain the right to use an underlying asset for a period of time in exchange for consideration.") in connection with an [underlying asset](https://asc.understandingaccounting.org/glossary/u/#underlying-asset "An asset that is the subject of a lease for which a right to use that asset has been conveyed to a lessee. The underlying asset could be a physically distinct portion of a single asset."), whether imposed by a [lease](https://asc.understandingaccounting.org/glossary/l/#lease "A contract, or part of a contract, that conveys the right to control the use of identified property, plant, or equipment (an identified asset) for a period of time in exchange for consideration.") or by a party other than the lessor, that meet the definition of either [lease payments](https://asc.understandingaccounting.org/glossary/l/#lease-payments "See paragraph 842-10-30-5 for what constitutes lease payments from the perspective of a lessee and a lessor.") or [variable lease payments](https://asc.understandingaccounting.org/glossary/v/#variable-lease-payments "Payments made by a lessee to a lessor for the right to use an underlying asset that vary because of changes in facts or circumstances occurring after the commencement date, other than the passage of time.") in Subtopic 842-10. Those obligations shall be accounted for by the lessee in accordance with the requirements of Subtopic 842-10. However, if obligations of a lessee in connection with an underlying asset, whether imposed by a lease or by a party other than the lessor, meet the provisions in paragraph [410-20-15-2](https://asc.understandingaccounting.org/asc/410/20/#410-20-15-2) but do not meet the definition of either lease payments or variable lease payments in Subtopic 842-10, those obligations shall be accounted for by the lessee in accordance with the requirements of this Subtopic.
    
6.  f
    
    An obligation for asbestos removal that results from the other-than-normal operation of an asset. Such an obligation may be subject to the provisions of Subtopic 410-30.
    
7.  g
    
    Costs associated with complying with funding or assurance provisions. Paragraph [410-20-35-9](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-9) otherwise addresses the measurement effects of funding and assurance provisions.
    
8.  h
    
    Obligations associated with maintenance, rather than retirement, of a long-lived asset.
    
9.  i
    
    The cost of a replacement part that is a component of a long-lived asset.

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:5edcadf30368d9d3ef7dad5609b287fa19eb6e89d70e792139d3ae1605252d4e

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-25: 25 Recognition

[Read section](https://asc.understandingaccounting.org/asc/410/20/#25-recognition)

SEC content: no

#### Background for Recognition

##### [410-20-25-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-1)

Pending content: yes

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:0d83668bc540ce3bc3a63c07ab9c7c50e6205bdee0c7ed3991c972edf485a66f

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Paragraph 35 of FASB Concepts Statement No. 6, Elements of Financial Statements, defines a liability as follows {Note: The indented text below is reproduced from FASB Concepts Statement No. 6 and includes editorial changes for internal consistency within the Codification}.

-   Liabilities are probable future sacrifices of economic benefits arising from present obligations of a particular entity to transfer assets or provide services to other entities in the future as a result of past transactions or events.
    

Transition date:(P) December 16, 2024; (N) December 16, 2025Transition guidance:

[105-10-65-9](https://asc.understandingaccounting.org/asc/105/10/#105-10-65-9)

<table class="asc-table" id="table_a2p_qgm_s1c"><tbody><tr><td class="entry"><em class="ph i"><strong class="ph b">Editor's Note:</strong> Paragraph 410-20-25-1 will be will be superseded upon transition, together with its heading.</em></td></tr><tr><td class="entry">&gt; <strong class="ph b">Background for Recognition</strong></td></tr></tbody></table>

[Paragraph superseded by Accounting Standards Update No. 2024-02.](https://asc.understandingaccounting.org/updates/asu-2024-02/)

##### [410-20-25-2](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-2)

Pending content: yes

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:09fe1ebc612b67831d28a760f8319878f55cb83ee0ad5034327e656637e483a2

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Probable is used with its usual general meaning, rather than in a specific accounting or technical sense (such as that in paragraph [450-20-25-1](https://asc.understandingaccounting.org/asc/450/20/#450-20-25-1)), and refers to that which can reasonably be expected or believed on the basis of available evidence or logic but is neither certain nor proved (Webster's New World Dictionary). Its inclusion in the definition is intended to acknowledge that business and other economic activities occur in an environment characterized by uncertainty in which few outcomes are certain (see paragraphs 44 through 48 of FASB Concepts Statement No. 6).

Transition date:(P) December 16, 2024; (N) December 16, 2025Transition guidance:

[105-10-65-9](https://asc.understandingaccounting.org/asc/105/10/#105-10-65-9) [Paragraph superseded by Accounting Standards Update No. 2024-02.](https://asc.understandingaccounting.org/updates/asu-2024-02/)

##### [410-20-25-3](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-3)

Pending content: yes

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:da3d2ab1f9fbfb7a6658d409d4288736a30e69428431d42041b161ee883cf977

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


As stated in the preceding paragraph, the definition of a liability in Concepts Statement 6 uses the term _probable_ in a different sense than it is used in paragraph [450-20-25-1](https://asc.understandingaccounting.org/asc/450/20/#450-20-25-1). As used in Topic 450, probable requires a high degree of expectation. The term probable in the definition of a liability, however, is intended to acknowledge that business and other economic activities occur in an environment in which few outcomes are certain.

Transition date:(P) December 16, 2024; (N) December 16, 2025Transition guidance:

[105-10-65-9](https://asc.understandingaccounting.org/asc/105/10/#105-10-65-9) [Paragraph superseded by Accounting Standards Update No. 2024-02.](https://asc.understandingaccounting.org/updates/asu-2024-02/)

##### [410-20-25-3A](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-3A)

Pending content: yes

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:5d5698e3a540ca6a0b59cb88bce3fe5b9a13a048ef721f78066b503054b55c6b

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Paragraph [410-20-40-3](https://asc.understandingaccounting.org/asc/410/20/#410-20-40-3) states that providing assurance that an entity will be able to satisfy its asset retirement obligation does not satisfy or extinguish the related liability.

Transition date:(P) December 16, 2024; (N) December 16, 2025Transition guidance:

[105-10-65-9](https://asc.understandingaccounting.org/asc/105/10/#105-10-65-9) [Paragraph superseded by Accounting Standards Update No. 2024-02.](https://asc.understandingaccounting.org/updates/asu-2024-02/)

#### Fair Value Is Reasonably Estimated

##### [410-20-25-4](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-4)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:6bd7fc363473dde37b4714c435d6c236c1c78aec03414b97cbc9f15f4118cfce

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An entity shall recognize the fair value of a liability for an [asset retirement obligation](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset.") in the period in which it is incurred if a reasonable estimate of fair value can be made. If a reasonable estimate of fair value cannot be made in the period the asset retirement obligation is incurred, the liability shall be recognized when a reasonable estimate of fair value can be made. If a tangible long-lived asset with an existing asset retirement obligation is acquired, a liability for that obligation shall be recognized at the asset's acquisition date as if that obligation were incurred on that date.

##### [410-20-25-5](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-5)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:db49a7dd257f970a35353b2171a4e81a5a9635ac5901026f89b30155294949c2

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Upon initial recognition of a liability for an asset retirement obligation, an entity shall capitalize an [asset retirement cost](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-cost "The amount capitalized that increases the carrying amount of the long-lived asset when a liability for an asset retirement obligation is recognized.") by increasing the carrying amount of the related long-lived asset by the same amount as the liability. Paragraph [835-20-30-5](https://asc.understandingaccounting.org/asc/835/20/#835-20-30-5) explains that capitalized asset retirement costs do not qualify as expenditures for purposes of applying Subtopic 835-20.

##### [410-20-25-6](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-6)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:bb800a33b145e35f7c18f97061591dfda51bd1fcfa8f244f8b4ec436fc5a7ad4

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An entity shall identify all its asset retirement obligations. An entity has sufficient information to reasonably estimate the fair value of an asset retirement obligation if any of the following conditions exist:

1.  a
    
    It is evident that the fair value of the obligation is embodied in the acquisition price of the asset.
    
2.  b
    
    An active market exists for the transfer of the obligation.
    
3.  c
    
    Sufficient information exists to apply an expected present value technique.

#### Obligations with Uncertainty in Timing or Method of Settlement

##### [410-20-25-7](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-7)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:daf881185329ba9763fd2386ca28945d6fcdca435ed3cf044d0adc3fa816e716

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The obligation to perform the asset retirement activity is unconditional even though uncertainty exists about the timing and (or) method of settlement. Thus, the timing and (or) method of settlement may be conditional on a future event. Accordingly, an entity shall recognize a liability for the fair value of a [conditional asset retirement obligation](https://asc.understandingaccounting.org/glossary/c/#conditional-asset-retirement-obligation "A legal obligation to perform an asset retirement activity in which the timing and (or) method of settlement are conditional on a future event that may or may not be within the control of the entity.") if the fair value of the liability can be reasonably estimated. In some cases, sufficient information about the timing and (or) method of settlement may not be available to reasonably estimate fair value. An expected present value technique incorporates uncertainty about the timing and method of settlement into the fair value measurement. Uncertainty is factored into the measurement of the fair value of the liability through assignment of probabilities to cash flows.

##### [410-20-25-8](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-8)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:c847a974fa73abcb98b777cb87a704ec9ede065777a650f05282c84163a19fed

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An entity would have sufficient information to apply an expected present value technique and therefore an asset retirement obligation would be reasonably estimable if either of the following conditions exists:

1.  a
    
    The settlement date and method of settlement for the obligation have been specified by others. For example, the law, regulation, or contract that gives rise to the [legal obligation](https://asc.understandingaccounting.org/glossary/l/#legal-obligation "An obligation that a party is required to settle as a result of an existing or enacted law, statute, ordinance, or written or oral contract or by legal construction of a contract under the doctrine of promissory estoppel.") specifies the settlement date and method of settlement. In this situation, the settlement date and method of settlement are known and therefore the only uncertainty is whether the obligation will be enforced (that is, whether performance will be required). In certain cases, determining the settlement date for the obligation that has been specified by others is a matter of judgment that depends on the relevant facts and circumstances. For example, a contract that provides the entity with an ability to extend its term through renewal should be evaluated to determine whether the settlement date should take into consideration renewal periods. Uncertainty about whether performance will be required does not defer the recognition of an asset retirement obligation because a legal obligation to stand ready to perform the retirement activities still exists, and it does not prevent the determination of a reasonable estimate of fair value because the only uncertainty is whether performance will be required.
    
2.  b
    
    The information is available to reasonably estimate all of the following:
    
    1.  1
        
        The settlement date or the range of potential settlement dates
        
    2.  2
        
        The method of settlement or potential methods of settlement (The term _potential methods of settlement_ refers to methods of settling the obligation that are currently available to the entity. Therefore, uncertainty about future methods yet to be developed would not prevent the entity from estimating the fair value of the asset retirement obligation.)
        
    3.  3
        
        The probabilities associated with the potential settlement dates and potential methods of settlement. (The entity should have a reasonable basis for assigning probabilities to the potential settlement dates and potential methods of settlement to reasonably estimate the fair value of the asset retirement obligation. If the entity does not have a reasonable basis of assigning probabilities, it is expected that the entity would still be able to reasonably estimate fair value when the range of time over which the entity may settle the obligation is so narrow and (or) the cash flows associated with each potential method of settlement are so similar that assigning probabilities without having a reasonable basis for doing so would not have a material impact on the fair value of the asset retirement obligation.)

##### [410-20-25-9](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-9)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:96e3513609468e25c93e9cd5e21757a4baeb3483ef2d872d18710e123f947d73

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


In many cases, the determination as to whether the entity has the information to reasonably estimate the fair value of the asset retirement obligation is a matter of judgment that depends on the relevant facts and circumstances. It is expected that the narrower the range of time over which the entity may settle the obligation and the fewer potential methods of settlement the entity has available to it, the more likely it is that the entity will have the information to reasonably estimate the fair value of an asset retirement obligation. For an illustration of this guidance, see Example 3 (paragraph [410-20-55-47](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-47)).

##### [410-20-25-10](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-10)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:6ee9e13c226482863029a0000e26efea7aa4dae8127cdc83fe5e98136aa3caf7

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Instances may occur in which sufficient information to estimate the fair value of an asset retirement obligation is unavailable. For example, if an asset has an indeterminate useful life, sufficient information to estimate a range of potential settlement dates for the obligation might not be available. In such cases, the liability would be initially recognized in the period in which sufficient information exists to estimate a range of potential settlement dates that is needed to employ a present value technique to estimate fair value.

##### [410-20-25-11](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-11)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:c7b236ac7d5c718a4ad42360e4d4e4f349c256a8946f6ef0633e844bf37b7306

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Examples of information that is expected to provide a basis for estimating the potential settlement dates, potential methods of settlement, and the associated probabilities include, but are not limited to, information that is derived from the entity's past practice, industry practice, management's intent, or the asset's estimated economic life. The estimated economic life of the asset might indicate a potential settlement date for the asset retirement obligation. However, the original estimated economic life of the asset may not, in and of itself, establish that date because the entity may intend to make improvements to the asset that could extend the life of the asset or the entity could defer settlement of the obligation beyond the economic life of the asset. In those situations, the entity would look beyond the economic life of the asset in determining the settlement date or range of potential settlement dates to use when estimating the fair value of the asset retirement obligation.

##### [410-20-25-12](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-12)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:b8e0998ef03b58e0a201399f923a3dda37378fe165fc3c6d2c3f4e1262b8eafe

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An asset retirement obligation may result from the acquisition, construction, or development and (or) normal operation of a long-lived asset that has an indeterminate useful life and thereby an indeterminate settlement date for the asset retirement obligation.

##### [410-20-25-13](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-13)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:c387031cecb378a9895e0a73d2091b43b767719de8baeea173ccfc6ba2b062b8

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


If a current law, regulation, or contract requires an entity to perform an asset retirement activity when an asset is dismantled or demolished, there is an unambiguous requirement to perform the retirement activity even if that activity can be indefinitely deferred. At some time deferral will no longer be possible, because no tangible asset will last forever (except land). Therefore, the obligation to perform the asset retirement activity is unconditional even though uncertainty exists about the timing and (or) method of settlement.

#### Uncertainty in Performance Obligations

##### [410-20-25-14](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-14)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:1963b65acb121eb7dd9afd355528e51455031238cdaeaaafb5cd6b3016201f51

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Subtopic requires recognition of a conditional asset retirement obligation before the event that either requires or waives performance occurs. Uncertainty surrounding conditional performance of the retirement obligation is factored into its measurement by assessing the likelihood that performance will be required. In situations in which the conditional aspect has only 2 outcomes and there is no information about which outcome is more probable, a 50 percent likelihood for each outcome shall be used until additional information is available.

##### [410-20-25-15](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-15)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:bc14ee948bb9dfcc6fc964f6dfc6b8e23a9d048d78f8273563fffa5aa8cd90c3

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An unambiguous requirement that gives rise to an asset retirement obligation coupled with a low likelihood of required performance still requires recognition of a liability. Uncertainty about the conditional outcome of the obligation is incorporated into the measurement of the fair value of that liability, not the recognition decision. Uncertainty about performance of conditional obligations shall not prevent the determination of a reasonable estimate of fair value. A past history of nonenforcement of an unambiguous obligation does not defer recognition of a liability, but its measurement is affected by the uncertainty over the requirement to perform retirement activities.

#### Acquired Asset Retirement Obligations

##### [410-20-25-16](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-16)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:53.384Z to 2026-09-10T00:20:53.384Z

Record version: sha256:bd428efbc5b140fe9cb8f7dc70354011d99e3b90c9f0f130449f349fee64659d

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


If a tangible long-lived asset with an existing asset retirement obligation is acquired, a liability for that obligation shall be recognized at the asset's acquisition date as if that obligation were incurred on that date.

Source downloaded (UTC): 2026-09-10T00:20:56.669Z to 2026-09-10T00:20:56.669Z

Record version: sha256:ec6dfb6660ea0e88938c662d20a81721fdbe68cf45286b61da6133a49f807d84

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-30: 30 Initial Measurement

[Read section](https://asc.understandingaccounting.org/asc/410/20/#30-initial-measurement)

SEC content: no

#### Determination of a Reasonable Estimate of Fair Value

##### [410-20-30-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-30-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:56.669Z to 2026-09-10T00:20:56.669Z

Record version: sha256:db324c3b0ae320d3886d217fec7c30b659e13d362a28a778f51899d667d1e9b7

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An expected present value technique will usually be the only appropriate technique with which to estimate the fair value of a liability for an [asset retirement obligation](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset."). An entity, when using that technique, shall discount the expected cash flows using a credit-adjusted risk-free rate. Thus, the effect of an entity's credit standing is reflected in the discount rate rather than in the expected cash flows. Proper application of a [discount rate adjustment technique](https://asc.understandingaccounting.org/glossary/d/#discount-rate-adjustment-technique "A present value technique that uses a risk-adjusted discount rate and contractual, promised, or most likely cash flows.") entails analysis of at least two liabilities—the liability that exists in the marketplace and has an observable interest rate and the liability being measured. The appropriate rate of interest for the cash flows being measured shall be inferred from the observable rate of interest of some other liability, and to draw that inference the characteristics of the cash flows shall be similar to those of the liability being measured. Rarely, if ever, would there be an observable rate of interest for a liability that has cash flows similar to an asset retirement obligation being measured. In addition, an asset retirement obligation usually will have uncertainties in both timing and amount. In that circumstance, employing a discount rate adjustment technique, where uncertainty is incorporated into the rate, will be difficult, if not impossible. See paragraphs

[410-20-55-13 through 55-17](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-13)

and Example 2 (paragraph [410-20-55-35](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-35)). For further information on present value techniques, see the guidance beginning in paragraph [820-10-55-4](https://asc.understandingaccounting.org/asc/820/10/#820-10-55-4).

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:7e5ba5e8eb1b77eeada7309b1563641739c79df2158420c12b347bf4bbc03c00

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-35: 35 Subsequent Measurement

[Read section](https://asc.understandingaccounting.org/asc/410/20/#35-subsequent-measurement)

SEC content: no

#### Allocation of Asset Retirement Cost

##### [410-20-35-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:70b8fc7c05553e2e7187cb0b0aef2bf0e019f3e915aae0f6c2e6c80febcc59b5

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


A liability for an [asset retirement obligation](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset.") may be incurred over more than one reporting period if the events that create the obligation occur over more than one reporting period. Any incremental liability incurred in a subsequent reporting period shall be considered to be an additional layer of the original liability. Each layer shall be initially measured at fair value. For example, the liability for decommissioning a nuclear power plant is incurred as contamination occurs. Each period, as contamination increases, a separate layer shall be measured and recognized. Paragraph [410-20-30-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-30-1) provides guidance on using that technique.

##### [410-20-35-2](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-2)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:1bf4a352f5ba7333ee0a71fd28a486a2de91836972928bfeda378b4c10415aae

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An entity shall subsequently allocate that [asset retirement cost](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-cost "The amount capitalized that increases the carrying amount of the long-lived asset when a liability for an asset retirement obligation is recognized.") to expense using a systematic and rational method over its useful life. Application of a systematic and rational allocation method does not preclude an entity from capitalizing an amount of asset retirement cost and allocating an equal amount to expense in the same accounting period. For example, assume an entity acquires a long-lived asset with an estimated life of 10 years. As that asset is operated, the entity incurs one-tenth of the liability for an asset retirement obligation each year. Application of a systematic and rational allocation method would not preclude that entity from capitalizing and then expensing one-tenth of the asset retirement costs each year.

##### [410-20-35-3](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-3)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:a1608a19451bcbfc7627cc4ce969d6fe1f7c019d815ce3c0ba955ff76e70920b

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


In periods subsequent to initial measurement, an entity shall recognize period-to-period changes in the liability for an asset retirement obligation resulting from the following:

1.  a
    
    The passage of time
    
2.  b
    
    Revisions to either the timing or the amount of the original estimate of undiscounted cash flows.

##### [410-20-35-4](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-4)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:fda83f12913c37c10f2e6ba960b5e7983c0e5f89bf8155f37b13483e65f85a84

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An entity shall measure and incorporate changes due to the passage of time into the carrying amount of the liability before measuring changes resulting from a revision to either the timing or the amount of estimated cash flows.

##### [410-20-35-5](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-5)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:b0081be01f4b00812c95c65f9fd015ec2df6b32405952e932a69384ef760fc1c

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An entity shall measure changes in the liability for an asset retirement obligation due to passage of time by applying an interest method of allocation to the amount of the liability at the beginning of the period. The interest rate used to measure that change shall be the credit-adjusted risk-free rate that existed when the liability, or portion thereof, was initially measured. That amount shall be recognized as an increase in the carrying amount of the liability and as an expense classified as [accretion expense](https://asc.understandingaccounting.org/glossary/a/#accretion-expense "An amount recognized as an expense classified as an operating item in the statement of income resulting from the increase in the carrying amount of the liability associated with the asset retirement obligation."). Paragraph [835-20-15-7](https://asc.understandingaccounting.org/asc/835/20/#835-20-15-7) states that accretion expense related to exit costs and asset retirement obligations shall not be considered to be interest cost for purposes of applying Subtopic 835-20.

##### [410-20-35-6](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-6)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:2ccd9c61e79ae5cbd6b0f53856292b8bb7e1be1b92c894ab00d896b8dd8a1de9

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The subsequent measurement provisions require an entity to identify undiscounted estimated cash flows associated with the initial measurement of a liability. Therefore, an entity that obtains an initial measurement of fair value from a market price or from a technique other than an expected present value technique must determine the undiscounted cash flows and estimated timing of those cash flows that are embodied in that fair value amount for purposes of applying the subsequent measurement provisions. Example 1 (see paragraph [410-20-55-31](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-31)) provides an illustration of the subsequent measurement of a liability that is initially obtained from a market price. (See paragraph [410-20-25-14](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-14) for a discussion on conditional outcomes.)

##### [410-20-35-7](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-7)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:6752011be3a47fa27880ecea715a111016a889b8340635a8cc7e5b72520f4328

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Paragraph [410-20-25-14](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-14) explains how uncertainty surrounding conditional performance of a retirement obligation is factored into its measurement by assessing the likelihood that performance will be required. As the time for notification approaches, more information and a better perspective about the ultimate outcome will likely be obtained. Consequently, reassessment of the timing, amount, and probabilities associated with the expected cash flows may change the amount of the liability recognized. See paragraphs

[410-20-55-18 through 55-19](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-18)

.

#### Change in Estimate

##### [410-20-35-8](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-8)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:16a768788bdd40e75a260251046ef0029ef7ee6024b815bf7325d96817c50f78

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Changes resulting from revisions to the timing or the amount of the original estimate of undiscounted cash flows shall be recognized as an increase or a decrease in the carrying amount of the liability for an asset retirement obligation and the related asset retirement cost capitalized as part of the carrying amount of the related long-lived asset. Upward revisions in the amount of undiscounted estimated cash flows shall be discounted using the current credit-adjusted risk-free rate. Downward revisions in the amount of undiscounted estimated cash flows shall be discounted using the credit-adjusted risk-free rate that existed when the original liability was recognized. If an entity cannot identify the prior period to which the downward revision relates, it may use a weighted-average credit-adjusted risk-free rate to discount the downward revision to estimated future cash flows. When asset retirement costs change as a result of a revision to estimated cash flows, an entity shall adjust the amount of asset retirement cost allocated to expense in the period of change if the change affects that period only or in the period of change and future periods if the change affects more than one period as required by paragraphs

[250-10-45-17 through 45-20](https://asc.understandingaccounting.org/asc/250/10/#250-10-45-17)

for a change in estimate.

#### Effects of Funding and Assurance Provisions

##### [410-20-35-9](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-9)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:20:59.316Z to 2026-09-10T00:20:59.316Z

Record version: sha256:e27001571839ea27f8006fd72a2bf9302ead24f046537d9dcb4fa385abf35c7e

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Methods of providing assurance include surety bonds, insurance policies, letters of credit, guarantees by other entities, and establishment of trust funds or identification of other assets dedicated to satisfy the asset retirement obligation. The existence of funding and assurance provisions may affect the determination of the credit-adjusted risk-free rate. For a previously recognized asset retirement obligation, changes in funding and assurance provisions have no effect on the initial measurement or accretion of that liability, but may affect the credit-adjusted risk-free rate used to discount upward revisions in undiscounted cash flows for that obligation.

Source downloaded (UTC): 2026-09-10T00:21:03.424Z to 2026-09-10T00:21:03.424Z

Record version: sha256:cc25d78bfa76acf2839f472911a6363889425c65899cfd4a9379de96347f13c5

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-40: 40 Derecognition

[Read section](https://asc.understandingaccounting.org/asc/410/20/#40-derecognition)

SEC content: no

#### Settlement of an Asset Retirement Obligation

##### [410-20-40-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-40-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:03.424Z to 2026-09-10T00:21:03.424Z

Record version: sha256:58a936eefa2911b7f786e0c659df28280b177aacbb76234e02bac0d5ebafda9f

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Typically, settlement of an [asset retirement obligation](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset.") is not required until the associated asset is retired. However, certain circumstances may exist in which partial settlement of an asset retirement obligation is required or performed before the asset is fully retired. The nature of asset retirement obligations in various industries is such that the obligations are not necessarily satisfied when the current operation or use of the asset ceases. These obligations can be settled during operation of the asset or after the operations cease. The timing of the ultimate settlement of a liability is unrelated to and should not affect its initial recognition in the financial statements provided the obligation is associated with the [retirement](https://asc.understandingaccounting.org/glossary/r/#retirement "The other-than-temporary removal of a long-lived asset from service. That term encompasses sale, abandonment, recycling, or disposal in some other manner. However, it does not encompass the temporary idling of a long-lived asset. After an entity retires an asset, that asset is no longer under the control of that entity, no longer in existence, or no longer capable of being used in the manner for which the asset was originally acquired, constructed, or developed.") of a tangible long-lived asset.

##### [410-20-40-2](https://asc.understandingaccounting.org/asc/410/20/#410-20-40-2)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:03.424Z to 2026-09-10T00:21:03.424Z

Record version: sha256:80f9557103207bc798d77cdfa3d0d688696d2eb87602973fa6440853d925a154

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Paragraph [410-20-25-14](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-14) explains how uncertainty surrounding conditional performance of a retirement obligation is factored into its measurement by assessing the likelihood that performance will be required. If, as time progresses, it becomes apparent that retirement activities will not be required, the liability and the remaining unamortized [asset retirement cost](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-cost "The amount capitalized that increases the carrying amount of the long-lived asset when a liability for an asset retirement obligation is recognized.") shall be reduced to zero.

##### [410-20-40-3](https://asc.understandingaccounting.org/asc/410/20/#410-20-40-3)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:03.424Z to 2026-09-10T00:21:03.424Z

Record version: sha256:a0edee0037c8f366857b4fc705cc42d7944ca3469bdcfc04794cb9280001349f

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Providing assurance that an entity will be able to satisfy its asset retirement obligation does not satisfy or extinguish the related liability. The effect of surety bonds, letters of credit, and guarantees is to provide assurance that third parties will provide amounts to satisfy the asset retirement obligations if the entity that has primary responsibility (the obligor) to do so cannot or does not fulfill its obligations. The possibility that a third party will satisfy the asset retirement obligations does not relieve the obligor from its primary responsibility for those obligations. If a third party is required to satisfy asset retirement obligations due to the failure or inability of the obligor to do so directly, the obligor would then have a liability to the third party.

Source downloaded (UTC): 2026-09-10T00:21:05.373Z to 2026-09-10T00:21:05.373Z

Record version: sha256:c85f95bf4718ff54603f16960157620598fe9ff0881bf9784bcfe39bca31a1ec

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-45: 45 Other Presentation Matters

[Read section](https://asc.understandingaccounting.org/asc/410/20/#45-other-presentation-matters)

SEC content: no

#### Classification of Accretion Expense

##### [410-20-45-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-45-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:05.373Z to 2026-09-10T00:21:05.373Z

Record version: sha256:19fe2b456a04041ff23e6bd54943ba4281278fea7c28c84de40cd20e6385e9ca

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


[Accretion expense](https://asc.understandingaccounting.org/glossary/a/#accretion-expense "An amount recognized as an expense classified as an operating item in the statement of income resulting from the increase in the carrying amount of the liability associated with the asset retirement obligation.") shall be classified as an operating item in the statement of income. An entity may use any descriptor for accretion expense so long as it conveys the underlying nature of the expense.

##### [410-20-45-2](https://asc.understandingaccounting.org/asc/410/20/#410-20-45-2)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:05.373Z to 2026-09-10T00:21:05.373Z

Record version: sha256:582a4c24c7c0bd22fb3a6c3e094c6371c43bdca428212fa5707ad203b892b12a

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


See paragraph [230-10-45-17](https://asc.understandingaccounting.org/asc/230/10/#230-10-45-17) for additional information about the classification of cash payments for [asset retirement obligations](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset.") as operating items on the statement of cash flows.

#### Statement of Cash Flows

##### [410-20-45-3](https://asc.understandingaccounting.org/asc/410/20/#410-20-45-3)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:05.373Z to 2026-09-10T00:21:05.373Z

Record version: sha256:4ea8c75356a733f64399736aa5ba060a2a40166c1d6f045d77c9da4c90b3ce27

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Paragraph [230-10-45-17(e)](https://asc.understandingaccounting.org/asc/230/10/#230-10-45-17) states that a cash payment made to settle an asset retirement obligation is a cash outflow for operating activities.

Source downloaded (UTC): 2026-09-10T00:21:07.224Z to 2026-09-10T00:21:07.224Z

Record version: sha256:e3e50198f64930a88e01307eab22ea7bf97d9f62ab964c23d85c0e2db2ed64da

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-50: 50 Disclosure

[Read section](https://asc.understandingaccounting.org/asc/410/20/#50-disclosure)

SEC content: no

##### [410-20-50-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-50-1)

Pending content: yes

Source downloaded (UTC): 2026-09-10T00:21:07.224Z to 2026-09-10T00:21:07.224Z

Record version: sha256:71cca8fc921e63e50733f1e6a22c56cc04d21c348589e6d5a7c2e294741c435c

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An entity shall disclose all of the following information about its [asset retirement obligations](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset."):

1.  a
    
    A general description of the asset retirement obligations and the associated long-lived assets
    
2.  b
    
    The fair value of assets that are legally restricted for purposes of settling asset retirement obligations
    
3.  c
    
    A reconciliation of the beginning and ending aggregate carrying amount of asset retirement obligations showing separately the changes attributable to the following components, whenever there is a significant change in any of these components during the reporting period:
    
    1.  1
        
        Liabilities incurred in the current period
        
    2.  2
        
        Liabilities settled in the current period
        
    3.  3
        
        [Accretion expense](https://asc.understandingaccounting.org/glossary/a/#accretion-expense "An amount recognized as an expense classified as an operating item in the statement of income resulting from the increase in the carrying amount of the liability associated with the asset retirement obligation.")
        
    4.  4
        
        Revisions in estimated cash flows.
        

Transition date:(P) December 16, 2026; (N) December 16, 2026Transition guidance:

[220-40-65-1](https://asc.understandingaccounting.org/asc/220/40/#220-40-65-1)An entity shall disclose all of the following information about its [asset retirement obligations](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset."):

1.  a
    
    A general description of the asset retirement obligations and the associated long-lived assets
    
2.  b
    
    The fair value of assets that are legally restricted for purposes of settling asset retirement obligations
    
3.  c
    
    A reconciliation of the beginning and ending aggregate carrying amount of asset retirement obligations showing separately the changes attributable to the following components, whenever there is a significant change in any of these components during the reporting period:
    
    1.  1
        
        Liabilities incurred in the current period
        
    2.  2
        
        Liabilities settled in the current period
        
    3.  3
        
        [Accretion expense](https://asc.understandingaccounting.org/glossary/a/#accretion-expense "An amount recognized as an expense classified as an operating item in the statement of income resulting from the increase in the carrying amount of the liability associated with the asset retirement obligation.")
        
    4.  4
        
        Revisions in estimated cash flows.
        

See paragraphs

[220-40-50-21 through 50-25](https://asc.understandingaccounting.org/asc/220/40/#220-40-50-21)

for additional disclosure requirements.

##### [410-20-50-2](https://asc.understandingaccounting.org/asc/410/20/#410-20-50-2)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:07.224Z to 2026-09-10T00:21:07.224Z

Record version: sha256:59ea41bfcb6fd4ce14b27dda38dabea13931b21c37fd0c5ad23e74dcfea9741f

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


If the fair value of an asset retirement obligation cannot be reasonably estimated, that fact and the reasons therefor shall be disclosed.

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:f3ef0ea8516ba96d1a8f537099df6b3fc0432afaefc6acd6f8f9a2fcbc7e9842

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-55: 55 Implementation Guidance and Illustrations

[Read section](https://asc.understandingaccounting.org/asc/410/20/#55-implementation-guidance-and-illustrations)

SEC content: no

#### Implementation Guidance

##### [410-20-55-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:8edf6493b5df06b2c216e404079ee81291d1e20719719787eb66cc9b62471f2a

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates Section 410-20-15. In most cases involving an [asset retirement obligation](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-obligation "An obligation associated with the retirement of a tangible long-lived asset."), the determination of whether a [legal obligation](https://asc.understandingaccounting.org/glossary/l/#legal-obligation "An obligation that a party is required to settle as a result of an existing or enacted law, statute, ordinance, or written or oral contract or by legal construction of a contract under the doctrine of promissory estoppel.") exists should be unambiguous. However, in situations in which no law, statute, ordinance, or contract exists but an entity makes a promise to a third party (which may include the public at large) about its intention to perform [retirement](https://asc.understandingaccounting.org/glossary/r/#retirement "The other-than-temporary removal of a long-lived asset from service. That term encompasses sale, abandonment, recycling, or disposal in some other manner. However, it does not encompass the temporary idling of a long-lived asset. After an entity retires an asset, that asset is no longer under the control of that entity, no longer in existence, or no longer capable of being used in the manner for which the asset was originally acquired, constructed, or developed.") activities, facts and circumstances need to be considered carefully in determining whether that promise has imposed a legal obligation upon the promisor under the doctrine of [promissory estoppel](https://asc.understandingaccounting.org/glossary/p/#promissory-estoppel "\"The principle that a promise made without consideration may nonetheless be enforced to prevent injustice if the promisor should have reasonably expected the promisee to rely on the promise and if the promisee did actually rely on the promise to his or her detriment.\" (See Black's Law Dictionary, seventh edition.)"). A legal obligation may exist even though no party has taken any formal action. In assessing whether a legal obligation exists, an entity is not permitted to forecast changes in the law or changes in the interpretation of existing laws and regulations. Preparers and their legal advisors are required to evaluate current circumstances to determine whether a legal obligation exists.

##### [410-20-55-2](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-2)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:021bc5ded64fe8a8b06068f65c185bbde6781622ac2599b82c3d64c7a3931be2

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


For example, assume an entity operates a manufacturing facility and has plans to retire it within five years. Members of the local press have begun to publicize the fact that when the entity ceases operations at the plant, it plans to abandon the site without demolishing the building and restoring the underlying land. Due to the significant negative publicity and demands by the public that the entity commit to dismantling the plant upon retirement, the entity's chief executive officer holds a press conference at city hall to announce that the entity will demolish the building and restore the underlying land when the entity ceases operations at the plant. Although no law, statute, ordinance, or written contract exists requiring the entity to perform any demolition or restoration activities, the promise made by the entity's chief executive officer may have created a legal obligation under the doctrine of promissory estoppel. In that circumstance, the entity's management (and legal counsel, if necessary) would have to evaluate the particular facts and circumstances to determine whether a legal obligation exists.

##### [410-20-55-3](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-3)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:bf08c4f4b3dc25278b508cec86b58e1d5c55d35df79dfedc39e4013b1204980d

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Once an entity determines that a duty or responsibility exists, it will then need to assess whether an obligating event has occurred that leaves it little or no discretion to avoid the future transfer or use of assets. If such an obligating event has occurred, an asset retirement obligation meets the definition of a liability and qualifies for recognition in the financial statements. However, if an obligating event that leaves an entity little or no discretion to avoid the future transfer or use of assets has not occurred, an asset retirement obligation does not meet the definition of a liability and, therefore, should not be recognized in the financial statements.

##### [410-20-55-4](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-4)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:6fa0b907e281a2a6b62608fbacc6e4c7a71ae66159deb3cdaa6638c9b2e6d5db

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Identifying the obligating event is often difficult, especially in situations that involve the occurrence of a series of transactions or other events or circumstances affecting the entity. For example, in the case of an asset retirement obligation, a law or an entity's promise may create a duty or responsibility, but that law or promise in and of itself may not be the obligating event that results in an entity's having little or no discretion to avoid a future transfer or use of assets. An entity must look to the nature of the duty or responsibility to assess whether the obligating event has occurred. For example, in the case of a nuclear power facility, an entity assumes responsibility for decontamination of that facility upon receipt of the license to operate it. However, no obligation to decontaminate exists until the facility is operated and contamination occurs. Therefore, the contamination, not the receipt of the license, constitutes the obligating event.

##### [410-20-55-5](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-5)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:d5ba3a735746f9fe6c09c2f8a3ae99f6ea51e803634aa41abefa8196220f9f3a

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates Section 410-20-15. Contracts between entities may contain an option or a provision that requires one party to the contract to perform retirement activities when an asset is retired. The other party may decide in the future not to exercise the option or to waive the provision to perform retirement activities, or that party may have a history of waiving similar provisions in other contracts. Even if there is an expectation of a waiver or nonenforcement, the contract still imposes a legal obligation. That obligation is included in the scope of this Subtopic. The likelihood of a waiver or nonenforcement will affect the measurement of the liability. For example, consider an entity that owns and operates a landfill. Regulations require that that entity perform capping, [closure](https://asc.understandingaccounting.org/glossary/c/#closure "Related to the Resource Conservation and Recovery Act of 1976: the process in which the owner-operator of a hazardous waste management unit discontinues active operation of the unit by treating, removing from the site, or disposing of on site all hazardous wastes in accordance with an Environmental Protection Agency or state-approved plan. Included, for example, are the process of emptying, cleaning, and removing or filling underground storage tanks and the capping of a landfill. Closure entails specific financial guarantees and technical tasks that are included in a closure plan and must be implemented."), and postclosure activities. Capping activities involve covering the land with topsoil and planting vegetation. Closure activities include drainage, engineering, and demolition and must be performed prior to commencing the postclosure activities. Postclosure activities, the final retirement activities, include maintaining the landfill once final certification of closure has been received and monitoring the ground and surface water, gas emissions, and air quality. Closure and postclosure activities are performed after the entire landfill ceases receiving waste (that is, after the landfill is retired). However, capping activities are performed as sections of the landfill become full and are effectively retired. The fact that some of the capping activities are performed while the landfill continues to accept waste does not remove the obligation to perform those intermediate capping activities from the scope of this Subtopic.

##### [410-20-55-6](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-6)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:206bb1d3c38dc59f70f2f9947e8bdefe194ffe2351a6ba283930f3e7a45495c0

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates Section 410-20-15. Whether an obligation results from the acquisition, construction, or development of a long-lived asset should, in most circumstances, be clear. For example, if an entity acquires a landfill that is already in operation, an obligation to perform capping, closure, and postclosure activities results from the acquisition and assumption of obligations related to past normal operations of the landfill. Additional obligations will be incurred as a result of future operations of the landfill.

##### [410-20-55-7](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-7)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:80756c48b6d672d416bdee1df77306a872f995b714d0b30f21f717df71e4b3e0

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates Section 410-20-15. Whether an obligation results from the normal operation of a long-lived asset may require judgment. Obligations that result from the normal operation of an asset should be predictable and likely of occurring. For example, consider an entity that owns and operates a nuclear power plant. That entity has a legal obligation to perform decontamination activities when the plant ceases operations. Contamination, which gives rise to the obligation, is predictable and likely of occurring and is unavoidable as a result of operating the plant. Therefore, the obligation to perform decontamination activities at that plant results from the normal operation of the plant.

##### [410-20-55-8](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-8)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:a2a8e4b657b2fec2b69494f5db31a287e286c6b1477c028ce78b89c272d27cb9

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


For example, a certain amount of spillage may be inherent in the normal operations of a fuel storage facility, but a catastrophic accident caused by noncompliance with an entity's safety procedures is not. The obligation to clean up after the catastrophic accident does not result from the normal operation of the facility and is not within the scope of this Subtopic.

##### [410-20-55-9](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-9)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:bd8c8d4f189e22e1aa040a65ade98810edc94db57108635ae599030827afd9e3

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


An asset retirement obligation may exist for component parts of a larger system. In some circumstances, the retirement of the component parts may be required before the retirement of the larger system to which the component parts belong.

##### [410-20-55-10](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-10)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:f3486d15f811edb53b0ab9394163ba0b9fa8a4fe023ae17b0b604aa738f00af8

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


For example, consider an aluminum smelter that owns and operates several kilns lined with a special type of brick. The kilns have a long useful life, but the bricks wear out after approximately five years of use and are replaced on a periodic basis to maintain optimal efficiency of the kilns. Because the bricks become contaminated with hazardous chemicals while in the kiln, a state law requires that when the bricks are removed, they must be disposed of at a special [hazardous waste](https://asc.understandingaccounting.org/glossary/h/#hazardous-waste "Related to Resource Conservation and Recovery Act of 1976: a waste, or combination of wastes, that because of its quantity, concentration, toxicity, corrosiveness, mutagenicity or inflammability, or physical, chemical, or infectious characteristics may cause, or significantly contribute to, an increase in mortality or an increase in serious irreversible, or incapacitating reversible illness or pose a substantial present or potential hazard to human health or the environment when improperly treated, stored, transported, or disposed of, or otherwise managed. Technically, those wastes that are regulated under the Resource Conservation and Recovery Act of 1976 40 CFR Part 261 are considered to be hazardous wastes.") site. The obligation to dispose of those bricks is within the scope of this Subtopic. The cost of the replacement bricks and their installation are not part of that obligation. This implementation guidance illustrates Section 410-20-15.

##### [410-20-55-11](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-11)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:1e08a4b3b744112f5237b55def106b6aef2629edd2d54989f88eca5c432d6ee6

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


If assets with asset retirement obligations are components of a larger group of assets (for example, a number of oil wells that make up an entire oil field operation), aggregation techniques may be necessary to derive a collective asset retirement obligation. This Subtopic does not preclude the use of estimates and computational shortcuts that are consistent with the fair value measurement objective when computing an aggregate asset retirement obligation for assets that are components of a larger group of assets. This implementation guidance illustrates paragraph [410-20-30-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-30-1).

##### [410-20-55-12](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-12)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:d80d012c30cf7c36164d0138c6cdff6f01405f641f9accc8fbcd7c1e3978c14a

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates Section 410-20-15. If, for example, a governmental unit retains the right (an option) to decide whether to require a retirement activity, there is some uncertainty about whether those retirement activities will be required or waived. Regardless of the uncertainty attributable to the option, a legal obligation to stand ready to perform retirement activities still exists, and the governmental unit might require them to be performed. Although the timing and method of settlement of the retirement obligation may depend on future events that may or may not be within the control of the entity, a legal obligation to stand ready to perform retirement activities still exists. The entity should consider the uncertainty about the timing and method of settlement in the measurement of the liability, consistent with a fair value measurement objective, regardless of whether the event that will trigger the settlement is partially or wholly under the control of the entity.

##### [410-20-55-13](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-13)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:0dadc46ecefe20fcc7756de0210e6ee73340b7c735ef04be40172aa1cd155c11

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates paragraph [410-20-30-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-30-1). In estimating the fair value of a liability for an asset retirement obligation using an expected present value technique, an entity shall begin by estimating the expected cash flows that reflect, to the extent possible, a marketplace assessment of the cost and timing of performing the required retirement activities. Considerations in estimating those expected cash flows include developing and incorporating explicit assumptions, to the extent possible, about all of the following:

1.  a
    
    The costs that a third party would incur in performing the tasks necessary to retire the asset
    
2.  b
    
    Other amounts that a third party would include in determining the price of the transfer, including, for example, inflation, overhead, equipment charges, profit margin, and advances in technology
    
3.  c
    
    The extent to which the amount of a third party's costs or the timing of its costs would vary under different future scenarios and the relative probabilities of those scenarios
    
4.  d
    
    The price that a third party would demand and could expect to receive for bearing the uncertainties and unforeseeable circumstances inherent in the obligation, sometimes referred to as a market-risk premium.

##### [410-20-55-14](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-14)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:428494bf1e6d5c9742fb59ab3739f8656c640ef60f40fedd84a9d5c5c63376b2

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


It is expected that uncertainties about the amount and timing of future cash flows can be accommodated by using the expected present value technique and therefore will not prevent the determination of a reasonable estimate of fair value.

##### [410-20-55-15](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-15)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:9dcf7732ec2d5798077ead69870adeac11083d2ab150b466834f75fd45f97371

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates paragraph [410-20-30-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-30-1). An entity shall discount expected cash flows using an interest rate that equates to a risk-free interest rate adjusted for the effect of its credit standing (a credit-adjusted risk-free rate). In determining the adjustment for the effect of its credit standing, an entity should consider the effects of all terms, collateral, and existing guarantees on the fair value of the liability.

##### [410-20-55-16](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-16)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:847f27e5a8d1ea60fa372602762cbb84ac9aa07ab3e48500290ee972b3624d8f

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Adjustments for default risk can be reflected in either the discount rate or the expected cash flows. In most situations, an entity will know the adjustment required to the risk-free interest rate to reflect its credit standing. Consequently, it would be easier and less complex to reflect that adjustment in the discount rate.

##### [410-20-55-17](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-17)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:66d2a8040c7c4339d4d4ea9d9814cd2d931b6d169271ca90014ff008336e670e

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


In addition, because of the requirements in paragraph [410-20-35-8](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-8) relating to upward and downward adjustments in expected cash flows, it is essential to the operationality of this Subtopic that the credit standing of the entity be reflected in the discount rate. For those reasons, the risk-free rate shall be adjusted for the credit standing of the entity to determine the discount rate.

##### [410-20-55-18](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-18)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:460fb187d8e7be2f0ff98c8a8ab4f2d8dec2cf2f82a69011efd34d426e3d64a5

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates paragraphs

[410-20-35-1 through 35-6](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-1)

. In periods subsequent to initial measurement, an entity recognizes the effect of the passage of time on the amount of a liability for an asset retirement obligation. A period-to-period increase in the carrying amount of the liability shall be recognized as an operating item ([accretion expense](https://asc.understandingaccounting.org/glossary/a/#accretion-expense "An amount recognized as an expense classified as an operating item in the statement of income resulting from the increase in the carrying amount of the liability associated with the asset retirement obligation.")) in the statement of income. An equivalent amount is added to the carrying amount of the liability. To calculate accretion expense, an entity shall multiply the beginning of the period liability balance by the credit-adjusted risk-free rate that existed when the liability was initially measured. The liability shall be adjusted for accretion prior to adjusting for revisions in estimated cash flows.

##### [410-20-55-19](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-19)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:48b2958d9c26d4ec3a84dd73259b1421c4f4ebbd51789e82628ff72dfb37da7b

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates paragraph [410-20-35-8](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-8). Revisions to a previously recorded asset retirement obligation will result from changes in the assumptions used to estimate the expected cash flows required to settle the asset retirement obligation, including changes in estimated probabilities, amounts, and timing of the settlement of the asset retirement obligation, as well as changes in the legal requirements of an obligation. Any changes that result in upward revisions to the expected cash flows shall be treated as a new liability and discounted at the current rate. Any downward revisions to the expected cash flows will result in a reduction of the asset retirement obligation. For downward revisions, the amount of the liability to be removed from the existing accrual shall be discounted at the credit-adjusted risk-free rate that was used at the time the obligation to which the downward revision relates was originally recorded (or the historical weighted-average rate if the year\[s\] to which the downward revision applies cannot be determined).

##### [410-20-55-20](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-20)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:70ebc47921bcf6c76dda81ec58e14e73289878131c3f9b576f2cc0f583f68a35

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Revisions to the asset retirement obligation result in adjustments of capitalized asset retirement costs and will affect subsequent depreciation of the related asset. Such adjustments are depreciated on a prospective basis.

##### [410-20-55-21](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-21)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:9b0ca8d87091456a5fe4c5e2ae887d3385e61234dcfa7303edfcbf31c14111fb

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This implementation guidance illustrates Section 410-20-15. There is no conceptual difference between interim property retirements and replacements and those retirements that occur in circumstances in which the retired asset is not replaced. Therefore, any asset retirement obligation associated with the retirement of or the retirement and replacement of a component part of a larger system qualifies for recognition provided that the obligation meets the definition of a liability. The cost of replacement components is excluded.

##### [410-20-55-22](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-22)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:8f775572c492aebae3ef8ad6b7ee197611bc5574b2e83c0bccc37c3008903600

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Examples of interim property retirements and replacements for component parts of larger systems are components of transmission and distribution systems (utility poles), railroad ties, a single oil well that is part of a larger oil field, and aircraft engines. The assets in those examples may or may not have associated retirement obligations.

##### [410-20-55-23](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-23)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:855d86420d2e90609c931f6f7a73de13edcd78b91d6afaf1ae82074efb5482a7

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


EU Directive 2002/96/EC was adopted on February 13, 2003, and directs EU-member countries to adopt legislation to regulate the collection, treatment, recovery, and environmentally sound [disposal](https://asc.understandingaccounting.org/glossary/d/#disposal "Related to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 and the Resource Conservation and Recovery Act of 1976: under the Resource Conservation and Recovery Act of 1976, the discharge, deposit, injection, dumping, spilling, leaking, or placing of any solid waste or hazardous waste into or on any land or water so that such solid waste or hazardous waste or any constituent thereof may enter the environment or be emitted into the air or discharged into any waters, including groundwaters. Similarly under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 with regard to hazardous substances.") of electrical and electronic waste equipment. The actual legislation adopted by individual EU-member countries can have different requirements. An entity should apply the guidance herein, adjusted as needed for the specific requirements of the applicable EU-member country.

##### [410-20-55-24](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-24)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:a42958d6dc226db4d2bc0024148de355239a86e25795a69d5d0213cd217e1f60

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The Directive distinguishes between new and historical waste. All products put on the market on or before August 13, 2005, are deemed to be historical waste equipment for the purposes of the Directive. Example 4 (see paragraph [410-20-55-63](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-63)) does not address the accounting for new waste because there should be little diversity in practice in the accounting for such waste. Costs relating to waste of new equipment are to be borne solely by the producers of the new equipment. This implementation guidance illustrates Section 410-20-15.

##### [410-20-55-25](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-25)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:d0639eec6a31010bbb2f85ff65c452360ce36b5aacc3e4a7d668de7bf9ebbcb6

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Under the Directive, the waste management obligation remains with the commercial user until the historical waste equipment is replaced, at which time the waste management obligation for that equipment may be transferred to the producer of the replacement equipment depending on the law adopted by the applicable EU-member country. If the commercial user does not replace the equipment, the obligation remains with that user until it disposes of the equipment. The Directive provides each EU-member country with the option to obligate commercial users to pay part or all of the costs associated with the historical waste even if the equipment is replaced. In this situation, the obligation would remain (partly or wholly) with the commercial user until the user disposes of the equipment.

##### [410-20-55-26](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-26)

Pending content: yes

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:a669952ac673c91d67c0c01c0e2448e3255fab04139e9c6ef3a08cc232bf10d6

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The accounting for the initial recognition and measurement of the liability and [asset retirement cost](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-cost "The amount capitalized that increases the carrying amount of the long-lived asset when a liability for an asset retirement obligation is recognized.") should be consistent with paragraphs

[410-20-25-1 through 25-4](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-1)

. The ability or intent of the commercial user to replace the asset and transfer the obligation does not relieve the user of its present duty or responsibility to settle the obligation. The replacement of the asset may, depending on EU-member country law, transfer the obligation to the replacement producer, and, if so, that transfer would affect the purchase price of the replacement asset. Upon initial recognition of a liability, an entity shall capitalize an asset retirement cost by increasing the carrying amount of the related asset by the same amount as the liability. The accounting subsequent to the initial recognition of the asset and liability should be consistent with the guidance in paragraphs

[410-20-35-3 through 35-8](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-3)

.

Transition date:(P) December 16, 2024; (N) December 16, 2025Transition guidance:

[105-10-65-9](https://asc.understandingaccounting.org/asc/105/10/#105-10-65-9)The accounting for the initial recognition and measurement of the liability and [asset retirement cost](https://asc.understandingaccounting.org/glossary/a/#asset-retirement-cost "The amount capitalized that increases the carrying amount of the long-lived asset when a liability for an asset retirement obligation is recognized.") should be consistent with Sections 410-20-25 and 410-20-30. The ability or intent of the commercial user to replace the asset and transfer the obligation does not relieve the user of its present duty or responsibility to settle the obligation. The replacement of the asset may, depending on EU-member country law, transfer the obligation to the replacement producer, and, if so, that transfer would affect the purchase price of the replacement asset. Upon initial recognition of a liability, an entity shall capitalize an asset retirement cost by increasing the carrying amount of the related asset by the same amount as the liability. The accounting subsequent to the initial recognition of the asset and liability should be consistent with the guidance in paragraphs

[410-20-35-3 through 35-8](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-3)

.

##### [410-20-55-27](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-27)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:ae1648b709e6d62245316f93a3a6430282e8ceb0d6d794342166321c34bb54c7

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


If the asset is subsequently replaced, with the obligation being transferred to the producer of the replacement equipment, the commercial user should determine the portion of the total amount paid to the producer that relates to the replacement equipment (the new asset) and the portion that relates to the transfer of the asset retirement obligation. That determination should be based on the [fair value](https://asc.understandingaccounting.org/glossary/f/#fair-value "The price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date.") of the asset retirement obligation, without the sale of the new asset. The price paid by the commercial user would not include any costs associated with the transfer of the obligation in situations in which the law in the EU-member country obligates commercial users to pay all of the costs associated with the historical waste even if the equipment is replaced. In those situations, the commercial user would not derecognize the liability from its balance sheet upon replacement, but rather when the obligation is ultimately settled.

##### [410-20-55-28](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-28)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:19b14d5e027ac4fd22290bd7e7bf9988402c61940825345ed428588251d3774e

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The new asset should be measured as the residual amount (the excess of the price paid over the fair value of the asset retirement obligation transferred). That amount should be used in determining the new asset's cost basis. The commercial user should derecognize the liability from its balance sheet and recognize a gain or loss based on the difference between the carrying amount of the liability at the date of the sale and the portion of the sales price that relates to the obligation. The producer of the new asset should recognize revenue for the total amount received reduced by the fair value of the obligation upon the transfer of the obligation from the commercial user (that is, on a net basis). The requirements for the producer to measure the revenue from the sale of the new asset as the residual amount and recognize revenue only for the sale of the new asset are applicable for those producers for which the recycling of electronic waste equipment is not a revenue-generating business activity. In situations in which the recycling of equipment is a revenue-generating business activity for the producer, that producer should apply the guidance in Topic 606 on [revenue](https://asc.understandingaccounting.org/glossary/r/#revenue "Inflows or other enhancements of assets of an entity or settlements of its liabilities (or a combination of both) from delivering or producing goods, rendering services, or other activities that constitute the entity's ongoing major or central operations.") from [contracts](https://asc.understandingaccounting.org/glossary/c/#contract "An agreement between two or more parties that creates enforceable rights and obligations.") with [customers](https://asc.understandingaccounting.org/glossary/c/#customer "A party that has contracted with an entity to obtain goods or services that are an output of the entity's ordinary activities in exchange for consideration.").

##### [410-20-55-29](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-29)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:7fa915fce7782f2f2554566649eb9d720bbdb11c24e722f0d2c6d1adb17286a1

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The producer of the new asset should derecognize that liability when the obligation is settled.

##### [410-20-55-30](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-30)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:996706e3d2080130c232677cabfcf6514db6ee2aa70e4f76a5edef1ee4afa55d

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


See Example 4 (paragraph [410-20-55-63](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-63)), which describes accounting for obligations associated with Directive 2002/96/EC on Waste Electrical and Electronic Equipment adopted by the European Union. That Example refers to and paraphrases various provisions of the Directive. Nothing in that Example shall be considered a definitive interpretation of any provision of the Directive for any purpose.

#### Illustrations

##### [410-20-55-31](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-31)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:a566b8ba2d7dcb1c16beae992894fa24676ae67f95350f2a2f7e79bf8076b0c9

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Example illustrates the guidance in paragraphs

[410-20-35-5 through 35-6](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-5)

. After initial measurement, an entity is required to recognize period-to-period changes in an asset retirement obligation liability resulting from the passage of time (accretion expense) and revisions in cash flow estimates. To apply the subsequent measurement provisions of this Subtopic, an entity must identify undiscounted cash flows related to an asset retirement obligation liability irrespective of how the liability was initially measured. Therefore, if an entity obtains the initial fair value from a market price, it must impute undiscounted cash flows from that price.

##### [410-20-55-32](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-32)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:d4cb46c46d5563d5dd0dd94182140c0a0c968c4fb50d19a7c1374cc37134d117

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Example illustrates the subsequent measurement of a liability in situations where the initial liability is based on a market price. Assume that the liability is initially recognized at the end of period 0 when the market price is $300,000 and the entity's credit-adjusted risk-free rate is 8 percent. As required by this Subtopic, revisions in the timing or the amount of estimated cash flows are assumed to occur at the end of the period after accretion on the beginning balance of the liability is calculated. At the end of each period, the following procedure is used to impute cash flows from the end-of-period market price, compute the change in that price attributable to revisions in estimated cash flows, and calculate accretion expense:

1.  a
    
    The market price and the credit-adjusted risk-free interest rate are used to impute the undiscounted cash flows embedded in the market price.
    
2.  b
    
    The undiscounted cash flows from (a) are discounted at the initial credit-adjusted risk-free rate of 8 percent to arrive at the ending balance of the asset retirement obligation liability per the provisions of this Subtopic.
    
3.  c
    
    The beginning balance of the asset retirement obligation liability is multiplied by the initial credit-adjusted risk-free rate of 8 percent to arrive at the amount of accretion expense per the provisions of this Subtopic.
    
4.  d
    
    The difference between the undiscounted cash flows at the beginning of the period and the undiscounted cash flows at the end of the period represents the revision in cash flow estimates that occurred during the period. If that change is an upward revision to the undiscounted estimated cash flows, it is discounted at the current credit-adjusted risk-free rate. If that change is a downward revision, it is discounted at the historical weighted-average rate because it is not practicable to separately identify the period to which the downward revision relates.

##### [410-20-55-33](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-33)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:7b2435081f6eed414593bbf4e91e6e2376fb0a80db2bb1b6774a600a1430fd69

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The following table illustrates the subsequent measurement of an asset retirement obligation liability obtained from a market price.

-   ![](https://asc.understandingaccounting.org/asc-img/GUID-56953A43-DFA1-4653-A934-160B0564C84C-low.gif)
    
    Subsequent Measurement of an Asset Retirement Obligation Liability Obtained from a Market Price End of Period 0 1 2 3 Market assumptions: Market price (includes market risk premium) " $300,000 " " $400,000 " " $350,000 " " $380,000 " Current risk-free rate adjusted for entity's credit standing 8.00% 7.00% 7.50% 7.50% Time period remaining 3 2 1 0 Imputed undiscounted cash flows (market price discounted at market rate) " $377,914 " " $457,960 " " $376,250 " " $380,000 " Change in undiscounted cash flows " 377,914 " " 80,046 " " (81,710)" " 3,750 " Discount rate: Current credit-adjusted risk-free rate (for upward revisions) 8.00% 7.00% Historical weighted-average credit-adjusted risk-free rate (for downward revisions) 7.83% Change in undiscounted cash flows discounted at credit-adjusted risk-free rate (current rate for upward revisions and historical rate for downward revisions) " $300,000 " " $69,916 " " $(75,777)" " $3,750 "

##### [410-20-55-34](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-34)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:285d3e0d9161924da77bb2565ccc4a5004da4026b88bdc051510a829d1895bfc

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The following table illustrates the measurement of liability under the provisions of the asset retirement obligation statement.

-   ![](https://asc.understandingaccounting.org/asc-img/GUID-C939A7D6-C1C6-4C7F-A898-7D4AF5496594-low.gif)
    
    Measurement of Liability under Provisions of Asset Retirement Obligation Statement Period Beginning Balance Accretion (8.0%) Change in Cash Flows Ending Balance 0 " $300,000 " " $300,000 " 1 " $300,000 " " $24,000 " " 324,000 " 2 " 324,000 " " 25,920 " " 349,920 " 3 " 349,920 " " 27,994 " " 377,914 " Period Beginning Balance Accretion (7.0%) Change in Cash flows Ending Balance 0 1 " $69,916 " " $69,916 " 2 " $69,916 " " $4,894 " " 74,810 " 3 " 74,810 " " 5,236 " " 80,046 " Period Beginning Balance Accretion (7.83%) Change in Cash Flows Ending Balance 0 1 2 " $(75,777)" " $(75,777)" 3 " $(75,777)" " $(5,933)" " (81,710)" Period Beginning Balance Accretion Change in Cash Flows Ending Balance 0 1 2 3 " $3,750 " " $3,750 " Total Period Beginning Balance Accretion Expense Change in Cash Flows Ending Balance 0 " $300,000 " " $300,000 " 1 " $300,000 " " $24,000 " " 69,916 " " 393,916 " 2 " 393,916 " " 30,814 " " (75,777)" " 348,953 " 3 " 348,953 " " 27,297 " " 3,750 " " 380,000 "

##### [410-20-55-35](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-35)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:2a4f10b0e86c8fef90a1a39292797d6a5673d07d1c45291f4f9964b669eb4809

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The following Cases illustrate the recognition and measurement provisions of this Subtopic:

1.  a
    
    Initial measurement of a liability for an asset retirement obligation using an expected present value technique, subsequent measurement assuming that there are no changes in expected cash flows, and settlement of the asset retirement obligation liability at the end of its term (Case A)
    
2.  b
    
    Subsequent measurement of an asset retirement obligation liability after a change in expected cash flows (Case B)
    
3.  c
    
    Recognition and measurement of an asset retirement obligation liability that is incurred over more than one reporting period (Case C)
    
4.  d
    
    Accounting for asset retirement obligations that are conditional and that have a low likelihood of enforcement (Case D).

##### [410-20-55-36](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-36)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:2392c94115fa323214f8120ba694ea7902f60b9a72aae02c2bdca79b1a2e3b72

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Cases A, B, C, and D incorporate simplified assumptions to provide guidance in implementing this Subtopic. For instance, Cases A and B relate to the asset retirement obligation associated with an offshore production platform that also would likely have individual wells and production facilities that would have separate asset retirement obligations. Those Cases also assume straight-line depreciation, even though, in practice, depreciation would likely be applied using a units-of-production method. Other simplifying assumptions are used throughout the Cases.

##### [410-20-55-37](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-37)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:f54a6fe220353d8bed8732bd615b8905d1336f8e3482a555b1659e02b0d5a035

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Case depicts an entity that completes construction of and places into service an offshore oil platform on January 1, 2003. The entity is legally required to dismantle and remove the platform at the end of its useful life, which is estimated to be 10 years. Based on the requirements of this Subtopic, on January 1, 2003, the entity recognizes a liability for an asset retirement obligation and capitalizes an amount for an asset retirement cost. The entity estimates the initial fair value of the liability using an expected present value technique. The significant assumptions used in that estimate of fair value are as follows:

1.  a
    
    Labor costs are based on current marketplace wages required to hire contractors to dismantle and remove offshore oil platforms. The entity assigns probability assessments to a range of cash flow estimates as follows.
    
    -   ![](https://asc.understandingaccounting.org/asc-img/GUID-9B5EFC01-0264-4216-A87C-C41F345F4F70-low.gif)
        
        Cash Flow Estimate Probability Assessment Expected Cash Flows " $100,000 " 25% " $25,000 " " 125,000 " 50 " 62,500 " " 175,000 " 25 " 43,750 " " $131,250 "
        
2.  b
    
    The entity estimates allocated overhead and equipment charges using the rate it applies to labor costs for transfer pricing (80 percent). The entity has no reason to believe that its overhead rate differs from those used by contractors in the industry.
    
3.  c
    
    A contractor typically adds a markup on labor and allocated internal costs to provide a profit margin on the job. The rate used (20 percent) represents the entity's understanding of the profit that contractors in the industry generally earn to dismantle and remove offshore oil platforms.
    
4.  d
    
    A contractor would typically demand and receive a premium (market risk premium) for bearing the uncertainty and unforeseeable circumstances inherent in locking in today's price for a project that will not occur for 10 years. The entity estimates the amount of that premium to be 5 percent of the expected cash flows adjusted for inflation.
    
5.  e
    
    The risk-free rate of interest on January 1, 2003, is 5 percent. The entity adjusts that rate by 3.5 percent to reflect the effect of its credit standing. Therefore, the credit-adjusted risk-free rate used to compute expected present value is 8.5 percent.
    
6.  f
    
    The entity assumes a rate of inflation of 4 percent over the 10-year period.

##### [410-20-55-38](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-38)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:9a29dc5997a30fe63d8b736f3c3d6a0c28d4fbc669b31332cf4e371e4228f2c2

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


On December 31, 2012, the entity settles its asset retirement obligation by using its internal workforce at a cost of $351,000. Assuming no changes during the 10-year period in the expected cash flows used to estimate the obligation, the entity would recognize a gain of $89,619 on settlement of the obligation. The entity would account for the asset retirement obligation as follows.

-   ![](https://asc.understandingaccounting.org/asc-img/GUID-A37BFCA5-D564-4FCB-B25B-DC0BB4A8F9FC-low.gif)
    
    Labor " $195,000 " Allocated overhead and equipment charges (80% of labor) " 156,000 " Total costs incurred " 351,000 " Asset retirement obligation liability " 440,619 " Gain on settlement of obligation " $89,619 "
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-FC8F8E40-2F4F-488A-BA92-DE811F65903F-low.gif)
    
    "Initial Measurement of the Asset Retirement Obligation Liability at January 1, 2003" Expected Cash Flows 1/1/03 Expected labor costs " $131,250 " "Allocated overhead and equipment charges (.80 × $131,250)" " 105,000 " "Contractor's markup \[.20 × ($131,250 + $105,000)\]" " 47,250 " Expected cash flows before inflation adjustment " 283,500 " Inflation factor assuming 4 percent rate for 10 years 1.4802 Expected cash flows adjusted for inflation " 419,637 " "Market-risk premium (.05 × $419,637)" " 20,982 " Expected cash flows adjusted for market risk " $440,619 " Expected present value using credit-adjusted risk-free rate of 8.5 percent for 10 years " $194,879 "
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-4C6CE17F-EEF3-4A2F-BC35-228F7149F3A6-low.gif)
    
    Interest Method of Allocation Year Liability Balance 1/1 Accretion Liability Balance 12/31 2003 " $194,879 " " $16,565 " " $211,444 " 2004 " 211,444 " " 17,973 " " 229,417 " 2005 " 229,417 " " 19,500 " " 248,917 " 2006 " 248,917 " " 21,158 " " 270,075 " 2007 " 270,075 " " 22,956 " " 293,031 " 2008 " 293,031 " " 24,908 " " 317,939 " 2009 " 317,939 " " 27,025 " " 344,964 " 2010 " 344,964 " " 29,322 " " 374,286 " 2011 " 374,286 " " 31,814 " " 406,100 " 2012 " 406,100 " " 34,519 " " 440,619 "
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-B2951BFC-7B39-4DCE-8D7F-F3454B0C413A-low.gif)
    
    Schedule of Expenses Year-End Accretion Expense Depreciation Expense Total Expense 2003 " $16,565 " " $19,488 " " $36,053 " 2004 " 17,973 " " 19,488 " " 37,461 " 2005 " 19,500 " " 19,488 " " 38,988 " 2006 " 21,158 " " 19,488 " " 40,646 " 2007 " 22,956 " " 19,488 " " 42,444 " 2008 " 24,908 " " 19,488 " " 44,396 " 2009 " 27,025 " " 19,488 " " 46,513 " 2010 " 29,322 " " 19,488 " " 48,810 " 2011 " 31,814 " " 19,488 " " 51,302 " 2012 " 34,519 " " 19,488 " " 54,007 "
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-B3023B97-8C38-4433-9981-470B80B858C6-low.gif)
    
    Journal Entries "January 1, 2003:" Long-lived asset (asset retirement cost) " $194,879 " Asset retirement obligation liability " $194,879 " To record the initial fair value of the asset retirement obligation liability "December 31, 2003-2012:" Depreciation expense (asset retirement cost) " 19,488 " Accumulated depreciation " 19,488 " To record straight-line depreciation on the asset retirement cost Accretion expense Per schedule Asset retirement obligation liability Per schedule To record accretion expense on the asset retirement obligation liability "December 31, 2012:" Asset retirement obligation liability " 440,619 " Wages payable " 195,000 " Allocated overhead and equipment charges " (.80 × $195,000)" " 156,000 " Gain on settlement of asset retirement obligation liability " 89,619 " To record settlement of the asset retirement obligation liability

##### [410-20-55-39](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-39)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:a304f6e805c7e3fca4e9d29bcd9f72ceb521988a26695895ceec7750a38f1532

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Case is the same as Case A with respect to initial measurement of the asset retirement obligation liability. In this Case, the entity's credit standing improves over time, causing the credit-adjusted risk-free rate to decrease by 0.5 percent to 8 percent at December 31, 2004.

##### [410-20-55-40](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-40)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:7b2106cf825f2536a594ffe009f46a7da8a6cdbcb465b0b4bcddb368640526c3

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


On December 31, 2004, the entity revises its estimate of labor costs to reflect an increase of 10 percent in the marketplace. In addition, it revises the probability assessments related to those labor costs. The change in labor costs results in an upward revision to the expected cash flows; consequently, the incremental expected cash flows are discounted at the current credit-adjusted risk-free rate of 8 percent. All other assumptions remain unchanged. The revised estimate of expected cash flows for labor costs is as follows.

-   ![](https://asc.understandingaccounting.org/asc-img/GUID-79AB8E66-96FD-4154-83FE-8A0DEA496720-low.gif)
    
    Cash Flow Estimate Probability Assessment Expected Cash Flows " $110,000 " 30% " $33,000 " " 137,500 " 45 " 61,875 " " 192,500 " 25 " 48,125 " " $143,000 "

##### [410-20-55-41](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-41)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:15e1326d6a61b7dc6ec7db1146d25dfe10a299d656de08a4743518a3270d22c3

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


On December 31, 2012, the entity settles its asset retirement obligation by using an outside contractor. It incurs costs of $463,000, resulting in the recognition of a $14,091 gain on settlement of the obligation. The entity would account for the asset retirement obligation as follows.

-   ![](https://asc.understandingaccounting.org/asc-img/GUID-D9EE6429-CBA7-4A46-AC1C-AF75DE092FA5-low.gif)
    
    Asset retirement obligation liability " $477,091 " Outside contractor " 463,000 " Gain on settlement of obligation " $14,091 "
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-11CA7D35-9C36-4A31-89A1-3353FC7B9DBE-low.gif)
    
    "Initial Measurement of the Asset Retirement Obligation Liability at January 1, 2003" Expected Cash Flows 1/1/03 Expected labor costs " $131,250 " "Allocated overhead and equipment charges (.80 × $131,250)" " 105,000 " "Contractor's markup \[.20 × ($131,250 + $105,000)\]" " 47,250 " Expected cash flows before inflation adjustment " 283,500 " Inflation factor assuming 4 percent rate for 10 years 1.4802 Expected cash flows adjusted for inflation " 419,637 " "Market-risk premium (.05 × $419,637)" " 20,982 " Expected cash flows for market risk " $440,619 " Present value using credit-adjusted risk-free rate of 8.5 percent for 10 years " $194,879 " "Subsequent Measurement of the Asset Retirement Obligation Liability Reflecting a Change in Labor Cost Estimate as of December 31, 2004" Incremental Expected Cash Flows 12/31/04 "Incremental expected labor costs ($143,000 - $131,250)" " $11,750 " "Allocated overhead and equipment charges (.80 × $11,750)" " 9,400 " "Contractor's markup \[.20 × ($11,750 + $9,400)\]" " 4,230 " Expected cash flows before inflation adjustment " 25,380 " Inflation factor assuming 4 percent rate for 8 years 1.3686 Expected cash flows adjusted for inflation " 34,735 " "Market-risk premium (.05 × $34,735)" " 1,737 " Expected cash flows adjusted for market risk " $36,472 " Expected present value of incremental liability using credit-adjusted risk-free rate of 8 percent for 8 years " $19,704 "
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-69AAD0B6-5F42-4671-AC2F-32F612BEFB71-low.gif)
    
    Interest Method of Allocation Year Liability Balance 1/1 Accretion Change in Cash Flow Estimate Liability Balance 12/31 2003 " $194,879 " " $16,565 " " $211,444 " 2004 " 211,444 " " 17,973 " " $19,704 " " 249,121 " (a) 2005 " 249,121 " " 21,078 " " 270,199 " 2006 " 270,199 " " 22,862 " " 293,061 " 2007 " 293,061 " " 24,796 " " 317,857 " 2008 " 317,857 " " 26,894 " " 344,751 " 2009 " 344,751 " " 29,170 " " 373,921 " 2010 " 373,921 " " 31,638 " " 405,559 " 2011 " 405,559 " " 34,315 " " 439,874 " 2012 " 439,874 " " 37,217 " " 477,091 " Schedule of Expenses Year-End Accretion Expense Depreciation Expense Total Expense 2003 " $16,565 " " $19,488 " " $36,053 " 2004 " 17,973 " " 19,488 " " 37,461 " 2005 " 21,078 " " 21,951 " " 43,029 " 2006 " 22,862 " " 21,951 " " 44,813 " 2007 " 24,796 " " 21,951 " " 46,747 " 2008 " 26,894 " " 21,951 " " 48,845 " 2009 " 29,170 " " 21,951 " " 51,121 " 2010 " 31,638 " " 21,951 " " 53,589 " 2011 " 34,315 " " 21,951 " " 56,266 " 2012 " 37,217 " " 21,951 " " 59,168 " (a) "The remainder of this table is an aggregation of 2 layers: the original liability, which is accreted at a rate of 8.5%, and the new incremental liability, which is accreted at a rate of 8.0%."
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-3BC08C01-CABA-4935-9878-139956508A73-low.gif)
    
    Journal Entries "January 1, 2003:" Long-lived asset (asset retirement cost) " $194,879 " Asset retirement obligation liability " $194,879 " To record the initial fair value of the asset retirement obligation liabiity "December 31, 2003:" Depreciation expense (asset retirement cost) " 19,488 " Accumulated depreciation " 19,488 " To record straight-line depreciation on the asset retirement cost Accretion expense " 16,565 " Asset retirement obligation liability " 16,565 " To record accretion expense on the asset retirement obligation liability "December 31, 2004:" Depreciation expense (asset retirement cost) " 19,488 " Accumulated depreciation " 19,488 " To record straight-line depreciation on the asset retirement cost Accretion expense " 17,973 " Asset retirement obligation liability " 17,973 " To record accretion expense on the asset retirement obligation liability Long-lived asset (asset retirement cost) " 19,704 " Asset retirement obligation liability " 19,704 " To record the change in estimated cash flows "December 31, 2005-2012:" Depreciation expense (asset retirement cost) " 21,951 " Accumulated depreciation " 21,951 " To record straight-line depreciation on the asset retirement cost adjusted for the change in cash flow estimate Accretion expense Per schedule Asset retirement obligation liability Per schedule To record accretion expense on the asset retirement obligation liability "December 31, 2012:" Asset retirement obligation liability " 477,091 " Gain on settlement of asset retirement obligation liability " 14,091 " Accounts payable (outside contractor) " 463,000 " To record settlement of the asset retirement obligation liability

##### [410-20-55-42](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-42)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:09c09339b598a990d05df27a6517d9f77e7497807a42efc4feac3617e685dfcc

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Case depicts an entity that places a nuclear utility plant into service on December 31, 2003. The entity is legally required to decommission the plant at the end of its useful life, which is estimated to be 20 years. Based on the requirements of this Subtopic, the entity recognizes a liability for an asset retirement obligation and capitalizes an amount for an asset retirement cost over the life of the plant as contamination occurs. The following schedule reflects the expected cash flows and respective credit-adjusted risk-free rates used to measure each portion of the liability through December 31, 2005, at which time the plant is 90 percent contaminated.

-   ![](https://asc.understandingaccounting.org/asc-img/GUID-A96529CB-C0F0-49B0-ABD5-74F651045A05-low.gif)
    
    Date Expected Cash Flows Credit-Adjusted Risk-Free Rate 12/31/03 " $23,000 " 9.0% 12/31/04 " 1,150 " 8.5 12/31/05 " 1,900 " 9.2

##### [410-20-55-43](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-43)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:419206564072b2fff0f958493a08da829f0f9a929427694132ef5eb572a8f77b

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


On December 31, 2005, the entity increases by 10 percent its estimate of expected cash flows that were used to measure those portions of the liability recognized on December 31, 2003, and December 31, 2004, which results in an upward revision to the expected cash flows. Accordingly, the incremental expected cash flows of $2,415 \[$2,300 (10 percent of $23,000) plus $115 (10 percent of $1,150)\] are discounted at the then-current credit-adjusted risk-free rate of 9.2 percent and recorded as a liability on December 31, 2005. The entity would account for the asset retirement obligation as follows.

-   ![](https://asc.understandingaccounting.org/asc-img/GUID-CD5F58B5-58B9-4819-8F97-2183BDF15AA1-low.gif)
    
    Date Incurred 12/31/03 12/31/04 12/31/05 Initial measurement of the asset retirement obligation liability: Expected cash flows adjusted for market risk " $23,000 " " $1,150 " " $1,900 " Credit-adjusted risk-free rate 9.00% 8.50% 9.20% Discount period in years 20 19 18 Expected present value " $4,104 " $244 $390 "Measurement of incremental expected cash flows occurring on December 31, 2005:" Incremental expected cash flows (increase of 10 percent) " $2,415 " "Credit-adjusted risk-free rate at December 31, 2005" 9.20% Discount period remaining in years 18 Expected present value $495
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-2ACD6483-87E5-4B98-86C0-1FC980F6143E-low.gif)
    
    Carrying Amount of Liability Incurred in 2003 Year Liability Balance 1/1 Accretion (9.0%) New Liability Liability Balance 12/31 2003 " $4,104 " " $4,104 " 2004 " $4,104 " $369 " 4,473 " 2005 " 4,473 " 403 " 4,876 " Carrying Amount of Liability Incurred in 2004 Year Liability Balance 1/1 Accretion (8.5%) New Liability Liability Balance 12/31 2004 $244 $244 2005 $244 $21 265
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-76EA5E6E-A596-4092-9996-F71955E193F0-low.gif)
    
    "Carrying Amount of Liability Incurred in 2005 Plus Effect of Change in Expected Cash Flows" Year Liability Balance 1/1 Accretion (9.2%) Change in Estimate New Liability Liability Balance 12/31 2005 $495 $390 $885 Carrying Amount of Total Liability Year Liability Balance 1/1 Accretion Change in Estimate New Liability Total Carrying Amount 12/31 2003 " $4,104 " " $4,104 " 2004 " $4,104 " $369 244 " 4,717 " 2005 " 4,717 " 424 $495 390 " 6,026 "
    
-   ![](https://asc.understandingaccounting.org/asc-img/GUID-954B61E6-DE4C-45F3-A819-64911E40CFE9-low.gif)
    
    Journal Entries "December 31, 2003:" Long-lived asset (asset retirement cost) " $4,104 " Asset retirement obligation liability " $4,104 " To record the initial fair value of the asset retirement obligation liability incurred this period "December 31, 2004:" "Depreciation expense ($4,104 ÷ 20)" 205 Accumulated depreciation 205 To record straight-line depreciation on the asset retirement cost Accretion expense 369 Asset retirement obligation liability 369 To record accretion expense on the asset retirement obligation liability Long-lived asset (asset retirement cost) 244 Asset retirement obligation liability 244 To record the initial fair value of the asset retirement obligation liability incurred this period "December 31, 2005:" "Depreciation expense \[($4,104 ÷ 20) + ($244 ÷ 19)\]" 218 Accumulated depreciation 218 To record straight-line depreciation on the asset retirement cost Accretion expense 424 Asset retirement obligation liability 424 To record accretion expense on the asset retirement obligation liability Long-lived asset (asset retirement cost) 495 Asset retirement obligation liability 495 To record the change in liability resulting from a revision in expected cash flow Long-lived asset (asset retirement cost) 390 Asset retirement obligation liability 390 To record the initial fair value of the asset retirement obligation liability incurred this period

##### [410-20-55-44](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-44)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:9cfaeb39f08578aadf94db293d1d1d2a82a90c42a185ceb4db636c922f97e4ee

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Case illustrates a timber lease in which the [lessor](https://asc.understandingaccounting.org/glossary/l/#lessor "An entity that enters into a contract to provide the right to use an underlying asset for a period of time in exchange for consideration.") has an option to require the [lessee](https://asc.understandingaccounting.org/glossary/l/#lessee "An entity that enters into a contract to obtain the right to use an underlying asset for a period of time in exchange for consideration.") to settle an asset retirement obligation. Assume an entity enters into a five-year [lease](https://asc.understandingaccounting.org/glossary/l/#lease "A contract, or part of a contract, that conveys the right to control the use of identified property, plant, or equipment (an identified asset) for a period of time in exchange for consideration.") that grants it the right to harvest timber on a tract of land and that agreement grants the lessor an option to require that the lessee reforest the underlying land at the end of the [lease term](https://asc.understandingaccounting.org/glossary/l/#lease-term "The noncancellable period for which a lessee has the right to use an underlying asset, together with all of the following: Periods covered by an option to extend the lease if the lessee is reasonably certain to exercise that option Periods covered by an option to terminate the lease if the lessee is reasonably certain not to exercise that option Periods covered by an option to extend (or not to terminate) the lease in which exercise of the option is controlled by the lessor."). Based on past history, the lessee believes that the likelihood that the lessor will exercise that option is low. Rather, at the end of the lease, the lessor will likely accept the land without requiring reforestation. The lessee estimates that there is only a 10 percent probability that the lessor will elect to enforce reforestation. Paragraph [842-10-15-1](https://asc.understandingaccounting.org/asc/842/10/#842-10-15-1) explains that Topic 842 does not apply to leases of biological assets, including timber.

##### [410-20-55-45](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-45)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:7decc4c6e0f9b8d889d372a68ba632d425270b5f05991bba41e7cc04bc8cf374

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


At the end of the first year, 20 percent of the timber has been harvested. The lessee estimates that the possible cash flows associated with performing reforestation activities in 4 years for the portion of the land that has been harvested will be $300,000. When estimating the fair value of the asset retirement obligation liability to be recorded (using an expected present value technique), the lessee incorporates the probability that the restoration provisions will not be enforced.

-   ![](https://asc.understandingaccounting.org/asc-img/GUID-A6B82EC5-2001-437B-A9A0-3201A5D01AF7-low.gif)
    
    Possible Cash Flows Probability Assessment Expected Cash Flows " $300,000 " 10% " $30,000 " - 90 - " $30,000 " Expected present value using credit-adjusted risk-free rate of 8.5 percent for 4 years " $21,647 "

##### [410-20-55-46](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-46)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:2fa8ead15257d9e12329fdc43952a38c4dcf076a25de171ef2933ddf708737cb

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


During the term of the lease, the lessee should reassess the likelihood that the lessor will require reforestation. For example, if the lessee subsequently determines that the likelihood of the lessor electing the reforestation option has increased, that change will result in a change in the expected cash flows and be accounted for as illustrated in Case B.

##### [410-20-55-47](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-47)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:c8c35caba99c0d008287a63242754fda8ddc40b5b202321075a777303d2cd09c

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Example includes four Cases that illustrate when an entity would be required to recognize the fair value of an asset retirement obligation. The Cases do not provide specific guidance for determining when an entity has sufficient information to reasonably estimate the fair value of the asset retirement obligation. The determination as to when an entity has sufficient information to reasonably estimate the fair value of an asset retirement obligation should be based on the guidance in paragraphs

[410-20-25-8 through 25-11](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-8)

. The Cases illustrate the initial recognition of a [conditional asset retirement obligation](https://asc.understandingaccounting.org/glossary/c/#conditional-asset-retirement-obligation "A legal obligation to perform an asset retirement activity in which the timing and (or) method of settlement are conditional on a future event that may or may not be within the control of the entity.") based on the facts presented. Any differences in facts from those presented in the Cases may result in different conclusions.

##### [410-20-55-48](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-48)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:c55466ce5b4b8a0ec335e7eaaa770a176f7525a01970321c087464ab21743352

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The following Cases illustrate the guidance in paragraphs

[410-20-25-7 through 25-11](https://asc.understandingaccounting.org/asc/410/20/#410-20-25-7)

and [410-20-30-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-30-1):

1.  a
    
    An entity has sufficient information to reasonably estimate the fair value of an asset retirement obligation at the time the obligation is incurred (Cases A and B).
    
2.  b
    
    An entity does not have sufficient information to reasonably estimate the fair value of an asset retirement obligation at the time the obligation is incurred (Case C).
    
3.  c
    
    An entity initially does not have sufficient information and later has sufficient information to reasonably estimate the fair value of an asset retirement obligation (Case D).

##### [410-20-55-49](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-49)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:9635e8cef7b446eb12e8e9f3fa4929e3cfee29b0e07befdf1291b7ee76d5dd8a

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Assume a telecommunications entity owns and operates a communication network that uses wood poles that are treated with certain chemicals. There is no legal requirement to remove the poles from the ground. However, the owner may replace the poles periodically for a number of operational reasons. Once the poles are removed from the ground, they may be disposed of, sold, or reused as part of other activities. There is existing legislation that requires special disposal procedures for the poles in the particular state in which the entity operates.

##### [410-20-55-50](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-50)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:463efa457497bfe7b9461fed9a8d4e77dce9c272d72382b9e24aa403e93a5c56

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


At the date of purchase of the treated poles, the entity has the information to estimate a range of potential settlement dates, the potential methods of settlement, and the probabilities associated with the potential settlement dates and methods based on established industry practice. Therefore, at the date of purchase, the entity is able to estimate the fair value of the liability for the required disposal procedures using an expected present value technique.

##### [410-20-55-51](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-51)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:992ae7a4fc1e337d841e204ae451f5279e01d6402347f7312850ed114204fbf0

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Although the timing of the performance of the asset retirement activity is conditional on removing the poles from the ground and disposing of them, existing legislation creates a duty or responsibility for the entity to dispose of the poles in accordance with special procedures, and the obligating event occurs when the entity purchases the treated poles. Although the entity may decide not to remove the poles from the ground or may decide to reuse the poles and thereby defer settlement of the obligation, the ability to defer settlement does not relieve the entity of the obligation. The poles will eventually need to be disposed of using special procedures, because the poles will not last forever. Additionally, the ability of the entity to sell the poles prior to disposal does not relieve the entity of its present duty or responsibility to settle the obligation. The sale of the poles transfers the obligation to another entity. The assumption of the obligation by the buyer affects the exchange price. The bargaining of the exchange price reflects the buyer's and seller's individual estimates of the timing and (or) amount of the cost to extinguish the obligation.

##### [410-20-55-52](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-52)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:eb6703e63be6f90e5f5b58679f6c3c99e36108d6eea65c5753aaf73d06f8011c

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The asset retirement obligation should be recognized when the entity purchases the poles because the entity has sufficient information to estimate the fair value of the asset retirement obligation. Because the legal requirement relates only to the disposal of the treated poles, the cost to remove the poles is not included in the asset retirement obligation. However, if there was a legal requirement to remove the treated poles, the cost of removal would be included.

##### [410-20-55-53](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-53)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:57839a3d93792810c4dcf78956e4cbe260ff05a4676aef8db6cb1ada6b02bd5d

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Assume an entity recently purchased several kilns lined with a special type of brick. As of the date of purchase, the kilns had not yet been used in any smelting processes. The kilns have a long useful life, but the bricks are replaced periodically. Because the bricks become contaminated with hazardous chemicals while the kiln is operated, a state law requires that when the bricks are removed, they must be disposed of at a special hazardous waste site. The entity has the information to estimate a range of potential settlement dates, the method of settlement, and the probabilities associated with the potential settlement dates based on its past practice of replacing the bricks to maintain the efficient operation of the kiln.

##### [410-20-55-54](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-54)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:7f8a91c0fe640412e4d53a5b66be5fea6b8acd89d48388c3484da1207b138a0d

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Therefore, at the date the bricks become contaminated because of the operation of the kiln, the entity is able to estimate the fair value of the liability for the required disposal procedures using an expected present value technique.

##### [410-20-55-55](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-55)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:e010158d0b8cee73c7b3e8f7ed3a10e2d15b5c7e1222709235f795ae5ef4b48b

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Although performance of the asset retirement activity is conditional on removing the bricks from the kiln, existing legislation creates a duty or responsibility for the entity to dispose of the bricks at a special hazardous waste site, and the obligating event occurs when the entity contaminates the bricks. As of the purchase date, the kilns have not yet been used in any smelting processes, and the bricks have not yet been contaminated. Therefore, at the date of purchase, no obligation exists because the bricks have not been contaminated and could be disposed of without performing any special disposal activities.

##### [410-20-55-56](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-56)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:e9f248539a30122a3520951c87cb28562c21b7b683ba4e6b2262836e30b061c6

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The fair value of the asset retirement obligation should be recognized once the kilns have been placed into operation and the bricks are contaminated. Although the entity may decide not to remove the bricks from the kiln and thereby defer settlement of the obligation, the ability to defer settlement does not relieve the entity of the obligation. The contaminated bricks will eventually need to be removed and disposed of at a special hazardous waste site, because a kiln will not last forever. Therefore, the obligation to perform the asset retirement activity is unconditional even though uncertainty exists about the timing of settlement. An asset retirement obligation should be recognized once the kilns have been placed into operation and the bricks are contaminated because the entity has sufficient information to estimate the fair value of the asset retirement obligation. The asset retirement obligation is the requirement to dispose of the contaminated bricks at a special hazardous waste site. The cost to remove the bricks is not part of the obligation and should be accounted for as a maintenance or replacement activity.

##### [410-20-55-57](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-57)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:3226dad257c36a973b1c1110a26bbb14daaa4cffc992754224ece27958a3170d

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Assume an entity acquires a factory that contains asbestos. After the acquisition date, regulations are put in place that require the entity to handle and dispose of this type of asbestos in a special manner if the factory undergoes major renovations or is demolished. Otherwise, the entity is not required to remove the asbestos from the factory. The entity has several options to retire the factory in the future including demolishing, selling, or abandoning it. The entity believes it does not have sufficient information to estimate the fair value of the asset retirement obligation because the settlement date or the range of potential settlement dates has not been specified by others and information is not available to apply an expected present value technique. For example, there are no plans or expectation of plans to undertake a major renovation that would require removal of the asbestos or demolition of the factory. The factory is expected to be maintained by repairs and maintenance activities that would not involve the removal of the asbestos. Also, the need for major renovations caused by technology changes, operational changes, or other factors has not been identified.

##### [410-20-55-58](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-58)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:1b61c454a7cf820e4fbd55785567d4eebf891013d1c89b1eaf5f2978a431a1d0

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Although the timing of the performance of the asset retirement activity is conditional on the factory undergoing major renovations or being demolished, existing regulations create a duty or responsibility for the entity to remove and dispose of asbestos in a special manner, and the obligating event occurs when the regulations are put in place. Therefore, an asset retirement obligation should be recognized when regulations are put in place if the entity can reasonably estimate the fair value of the liability. In this Case, the entity believes that there is an indeterminate settlement date for the asset retirement obligation because the range of time over which the entity may settle the obligation is unknown or cannot be estimated. Therefore, the entity cannot reasonably estimate the fair value of the liability. Accordingly, the entity would not recognize a liability for the asset retirement obligation when regulations are put in place, but it should disclose a description of the obligation, the fact that a liability has not been recognized because the fair value cannot be reasonably estimated, and the reasons why fair value cannot be reasonably estimated. The entity would recognize a liability in the period in which sufficient information is available to reasonably estimate its fair value.

##### [410-20-55-59](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-59)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:9cd9177ffb1483e76fbac379d9d54a0aa95eaebbcb82235f956107786a03285a

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Assume an entity acquires a factory that contains asbestos. At the acquisition date, regulations are in place that require the entity to handle and dispose of this type of asbestos in a special manner if the factory undergoes major renovations or is demolished. Otherwise, the entity is not required to remove the asbestos from the factory. The entity has several options to retire the factory in the future including demolishing, selling, or abandoning it. At the acquisition date, it is not evident that the fair value of the obligation is embodied in the acquisition price of the factory because both the seller and the buyer of the factory believed the obligation had an indeterminate settlement date, an active market does not exist for the transfer of the obligation, and sufficient information does not exist to apply an expected present value technique. Ten years after the acquisition date, the entity obtains additional information based on changes in demand for the products manufactured at that factory. At that time, the entity has the information to estimate a range of potential settlement dates, the potential methods of settlement, and the probabilities associated with the potential settlement dates and potential methods of settlement. Therefore, at that time the entity is able to estimate the fair value of the liability for the special handling of the asbestos using an expected present value technique.

##### [410-20-55-60](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-60)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:f6007a3911d0db0c73fecfbf32a565c53e2f562e917da654a6ceed8c8473858f

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Although timing of the performance of the asset retirement activity is conditional on the factory undergoing major renovations or being demolished, existing regulations create a duty or responsibility for the entity to remove and dispose of asbestos in a special manner, and the obligating event occurs when the entity acquires the factory. In this Case, regulations are in place at the date of acquisition that require the entity to handle and dispose of the asbestos in a special manner. Therefore, the obligating event is the acquisition of the factory. If regulations were enacted after the date of acquisition, the obligating event would be the enactment of the regulations (see Case C).

##### [410-20-55-61](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-61)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:3b33f4cf6f656b8b2a77537457ef48629fb2a200b012e1dc380093f7b3dded12

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Although the entity may decide to abandon the factory and thereby defer settlement of the obligation for the foreseeable future, the ability to defer settlement does not relieve the entity of the obligation. The asbestos will eventually need to be removed and disposed of in a special manner, because no building will last forever. Additionally, the ability of the entity to sell the factory does not relieve the entity of its present duty or responsibility to settle the obligation. The sale of the asset would transfer the obligation to another entity and that transfer would affect the selling price. Therefore, the obligation to perform the asset retirement activity is unconditional even though uncertainty exists about the timing and method of settlement.

##### [410-20-55-62](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-62)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:e099ec89fe557d901539c3ed035cdf3e9b2352d6ec0054e32904b85cbf8a3ed8

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


In this Case, an asset retirement obligation is not recognized when the entity acquires the factory because the entity does not have sufficient information to estimate the fair value of the obligation. The entity would disclose a description of the obligation, the fact that a liability has not been recognized because the fair value cannot be reasonably estimated, and the reasons why fair value cannot be reasonably estimated. An asset retirement obligation would be recognized by this entity 10 years after the acquisition date because that is when the entity has sufficient information to estimate the fair value of the asset retirement obligation.

##### [410-20-55-63](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-63)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:e6175f5980dcacf4ecd180aa5723397c447fd5e714385126e82948ee3e3890e8

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


This Example illustrates the guidance in paragraphs

[410-20-55-23 through 55-29](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-23)

.

##### [410-20-55-64](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-64)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:1a21fd4bb86b7d43ff195bf5d6bac18360c14d2a3626764554bc4aee41407bb5

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Assume an entity (a commercial user) is currently using electronic equipment that must be disposed of in accordance with the requirements of EU Directive 2002/96/EC. The EU-member country has not yet adopted the legislation. The entity has the ability either to replace the equipment or to dispose of the equipment without replacing it. In the EU-member country in which the entity operates, the producer of the replacement equipment will be wholly responsible for disposal costs if and when the equipment is replaced. The recycling of electronic waste equipment is not a revenue-generating business activity of the producer.

##### [410-20-55-65](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-65)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:c73bc776482c343ec345ae0fbff4a81619041b1d9fbe298b2b126dbbbe425269

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


Upon the adoption of the legislation, the entity should recognize a liability for the fair value of the asset retirement obligation. Upon initial recognition of a liability, the entity should capitalize an asset retirement cost by increasing the carrying amount of the related asset by the same amount as the liability. The accounting subsequent to the initial recognition of the asset and liability should be consistent with the guidance in paragraphs

[410-20-35-3 through 35-6](https://asc.understandingaccounting.org/asc/410/20/#410-20-35-3)

.

##### [410-20-55-66](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-66)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:859808b7208b861610634b115e851047beaa2b344f57ea0d686f9f95a21e1b49

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


The waste management obligation remains with the commercial user until the historical waste equipment is replaced or is disposed of by the commercial user itself. Assuming the equipment is replaced, the entity should determine the portion of the purchase price that relates to the cost of the replacement asset and the portion that relates to the assumption of the obligation by the producer. That determination should be based on the fair value of the obligation, without the sale of the new asset. The entity should recognize a gain or loss based on the difference between the carrying amount of the liability at the date of the sale and the portion of the sales price that relates to the obligation. The producer should recognize revenue for the total amount received, reduced by the fair value of the obligation, and recognize a liability for the fair value of the obligation upon transfer of the obligation from the commercial user. Assuming the equipment is disposed of by the entity rather than replaced, the entity should recognize a gain or loss based on the difference between the carrying amount of the liability at the date of the disposal and the actual cost of disposal. See paragraphs

[820-10-55-77 through 55-81](https://asc.understandingaccounting.org/asc/820/10/#820-10-55-77)

for an illustration of an entity required to estimate the fair value of an asset retirement obligation.

##### [410-20-55-67](https://asc.understandingaccounting.org/asc/410/20/#410-20-55-67)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:10.890Z to 2026-09-10T00:21:10.890Z

Record version: sha256:c5663e5a698a73667f0b0b7646831ebfe5c91944f08503e37e5fd5cd878a5df9

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


For the financing of historical waste, the Directive also distinguishes between historical waste from private households and historical waste from "users other than private households" (referred to as "commercial users").

Source downloaded (UTC): 2026-09-10T00:21:14.902Z to 2026-09-10T00:21:14.902Z

Record version: sha256:539e4659edfdd893428e389b178622db44496d94e7b9542bb0aae71b27955b11

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


## ASC 410-20-60: 60 Relationships

[Read section](https://asc.understandingaccounting.org/asc/410/20/#60-relationships)

SEC content: no

#### Interest

##### [410-20-60-1](https://asc.understandingaccounting.org/asc/410/20/#410-20-60-1)

Pending content: no

Source downloaded (UTC): 2026-09-10T00:21:14.902Z to 2026-09-10T00:21:14.902Z

Record version: sha256:9395cf50a3cb2182af3c990c432b1eb30a29d947d4457a2bd86916f616ac9ad7

Snapshot version: sha256:15aea8165dff9f5ae47d9484f8470588b13b307f56e1d50801bf4d85ec190e3f

Effective as of: not established by retrieval timestamps.


For guidance related to capitalization of interest cost, see Subtopic 835-20.
