ASC

Concept

cable television plant

Referenced in 2 subtopics across 1 area.

Assets2

  1. 350-922Entertainment—Cable Television350 Intangibles—Goodwill and Other

    This Subtopic governs intangible-type costs incurred by cable television systems, principally programming and other system costs during the "prematurity period" and franchise application costs. During the prematurity period, fixed system costs incurred in anticipation of a fully operating system are split between current operations (expensed) and future operations (capitalized) using the subscriber-based fraction in 922-360-35-3, and amortization is computed using that same fraction. Costs of successful franchise applications are capitalized and amortized under Topic 350, while unsuccessful or abandoned franchise costs are expensed.

  2. 360-922Entertainment—Cable Television360 Property, Plant, and Equipment

    This subtopic governs how cable television entities account for plant and installation costs during the "prematurity period" — the span between the start of construction/marketing and the point at which the system is substantially complete and serving subscribers. Management must fix the prematurity period before revenue from the first subscriber is recognized (presumed not to exceed two years), capitalize cable plant costs and initial subscriber installation costs in full during that period, and record depreciation using a subscriber-based fraction rather than full depreciation. Distinguishable portions of a system in the prematurity period are accounted for and tested for recoverability separately.