ASC

Concept

direct method statement of cash flows

Referenced in 1 subtopic across 1 area.

Presentation1

  1. 230-830Foreign Currency Matters230 Statement of Cash Flows

    This subtopic tells an entity with foreign currency transactions or foreign operations how to translate cash flows in the statement of cash flows. Foreign currency cash flows are reported at the reporting currency equivalent using the exchange rates in effect at the time of the cash flows (a weighted-average rate may be used if the result is substantially the same). The effect of exchange rate changes on cash, cash equivalents, and restricted cash held in foreign currencies is shown as a separate part of the reconciliation of the change in total cash for the period.